Glazing - Tinting Vehicles Trains

SWMS · SWMS-10638

  • 11 job steps
  • Version 3
  • Glazing
  • Reads on any phone

This SWMS gives a detailed guide to the safe methods for glazing and tinting vehicles and trains, covering the hazards and controls for workplace safety and compliance.

It takes your crew through each job step: planning with the rail network owner, training, arriving on site, assessing the maintenance area, working outdoors, the environment, housekeeping, manual tasks, window removal and replacement, completion and emergency response.

It suits businesses and contractors that glaze and tint vehicles and trains, particularly where the work is high-risk construction work: glazing professionals, vehicle maintenance teams, rail industry contractors, and safety officers and supervisors.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Preview of the Glazing - Tinting Vehicles Trains SWMS

Glazing - Tinting Vehicles Trains

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site Management Plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-Risk Construction Work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant
  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Hand Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Lack of consultation may lead to potential outcomes for personal injury, property damage &/or environmental incident.

      Before controls3 High
      Controls
      • Ensure documented system for liaising with Rail Network owner. Include:

        • Procedures for Track Occupancy Authorities (TOA) and Track Work Authorities (TWA)

        • Training for all relevant people in the use of TOA/TWA (including scope and limitations)

        • Communication procedures between contractor and Rail Safety Manager/RIM/Protection Officer (PO) and Rail Network owner (other relevant people)

        • Suitable signalling (auto-signals/hand signallers etc.)

      • Do not breach requirements of TWA, TOA or work plans/SWMS at any time

        • If changes are made to work plans/areas – ensure these are formally undertaken and cleared with relevant authorities

        • Ensure formal handover for PO shift changeover. Hand-over Authority must be signed.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

10 more job steps, from Training to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this template

Sign up free, then choose how you'd like it. Your company details fill in for you.

  • Included in paid plans

    Use template credits from your plan. This one costs 1.

    Compare plans and prices
  • Buy it once

    $89.95 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

11 job steps

  1. PlanningSet up a documented system for liaising with the rail network owner
  2. TrainingInduct everyone working in the rail corridor
  3. Arrival on-site & assess onsite conditionsArrive on site and assess the site conditions
  4. Assess the designated maintenance areaAssess the maintenance area for mobile plant, power lines and fumes
  5. Check weather conditions & prepareCheck the weather and prepare for conditions
  6. EnvironmentManage waste, spills and fauna
  7. House keepingKeep the work area clean and free of trip hazards
  8. Manual tasksLift and handle materials safely
  9. Window removal & replacementRemove and replace windows safely
  10. On completionSecure the site and park the machine safely
  11. Emergency responseFollow the emergency response steps

Hazards it covers

Reviews

No reviews yet.

See all

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.