Working around Lead Residue-Dust
- Company doing the work
- [Company]
- Business contact and phone
- —
- Responsible person (for monitoring SWMS and work)
- —
- Responsible person's phone
- —
- Responsible person's signature
- —
- Date signed
- —
- Principal Contractor (PC)
- —
- PC Address
- —
- PC phone
- —
- Date SWMS provided to PC
- —
- Job Site Address
- —
- Part of a construction project
- —
Site Management Plan
If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.
High-Risk Construction Work
This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)
- Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
Planning and preparation
Planning/Preparation
Liaise with Principal Contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
Principal contractor to confirm emergency response procedures are in place.
Hold Points
Hold points identified and signed off before continuing work. (specify the hold points)
Training/Licence
All workers to have a General Construction Induction Card
Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.
Trained First Aider on site
All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.
Worker duties and responsibilities
Fit condition for work, i.e., no signs of fatigue, alcohol or drugs
Attend all site inductions/briefings
Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor.
Monitor/Review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.
Site-Specific Notes
Legislation and codes of practice
None listed.
Personal protective equipment (PPE)
- Foot Protection
- Disposable RespiratorDisposable half-face respirator
- Hand ProtectionDisposable Hand Protection
- Protective Clothing
Job steps, hazards and controls
- Work activity
Planning
- Hazard
Exposure to lead
Before controls4 AcuteControlsThe training and information provided to workers on lead should include:
Hazards and potential risks associated with lead
The types, properties and uses of lead
Where lead is likely to be found
The health risks and toxic effects associated with exposure to lead
How lead can be ingested or inhaled
Activities which could release lead dust or fumes.
Regulations, including requirements for health monitoring
Control measures to avoid exposure.
Work practices, procedures and control measures
How to fit, use, maintain and clean personal protective equipment (PPE)
Emergency procedures, including any special decontamination procedures or PPE failures
First aid and incident reporting procedures
The purpose and results of air monitoring including the types of health tests that may be required
Checking controls are working and using them
Waste collection and disposal
Ensure the worker is competent to identify if lead is present.
Workers under the age of 16 and pregnant women should not be employed in lead processes.
After controls2 ModerateResponsible- Supervisor
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls
16 more job steps, from Arrival on-site & assess onsite conditions to Emergency response
Each with its hazards, risk ratings and controls, plus your crew's sign-on.