Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis
Paquete ahorro · 20 plantillas

Concrete Tilt-up Construction Combo

Paquete ahorro · PACK-50337

Vista previa de la plantilla Paquete ahorro Concrete Tilt-up Construction Combo
  • 20 plantillas
  • 20 por el precio de 15
  • Llega en una carpeta de la Biblioteca

A set of 15 SWMS and five SOPs for tilt-up and precast panel contractors.

The SWMS cover tilt-up panels, panel lifting, concrete placement, foundations, dogging and spotters. The SOPs include Dogman, Handheld Power Tools and Manual Handling.

Each document is the same one sold on its own, so you get every update to it. Together they cost 15 template credits instead of 20.

Vista previa de SWMS Pre-cast Tilt-up Panels

Pre-cast Tilt-up Panels

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Is the work associated with a construction project?
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to silica dust

      Before controls4 Acute
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

18 pasos más del trabajo, de Temporary casting bed-design a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 15 en vez de 20.

    Comparar planes y precios
  • Cómprala una sola vez

    $1,349.25 $1,799.00 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Pre-cast Tilt-up Panels

    SWMS · 19 pasos del trabajo

    Pre-cast Tilt-up Panels SWMS: nineteen job steps covering casting beds, formwork, steel reinforcement, concrete placing, stripping and emergency response.

    También se vende por separado
  2. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  3. Handheld Power Tools

    SOP · 9 secciones

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    También se vende por separado
  4. Dogman

    SOP · 8 secciones

    Safe operating procedure for dogmen: hazards, PPE, responsibilities, pre-operational inspections, rigging, lifting and landing loads.

    También se vende por separado
  5. Spotter

    SWMS · 11 pasos del trabajo

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    También se vende por separado
  6. Concrete Placement and Finishing

    SWMS · 13 pasos del trabajo

    SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.

    También se vende por separado
  7. Concrete Boom or Line Pumping

    SWMS · 15 pasos del trabajo

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    También se vende por separado
  8. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  9. Concrete Foundations Excavating - Pouring

    SWMS · 17 pasos del trabajo

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    También se vende por separado
  10. Silica Dust

    SWMS · 14 pasos del trabajo

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    También se vende por separado
  11. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  12. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  13. Dogman

    SWMS · 12 pasos del trabajo

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    También se vende por separado
  14. Tilt-up Panel Lifting

    SWMS · 18 pasos del trabajo

    Tilt-up Panel Lifting SWMS: 18 job steps covering the lifting and bracing of tilt-up and precast concrete panels, from site set-up to emergency response.

    También se vende por separado
  15. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  16. Caulking Grouting Patching

    SWMS · 12 pasos del trabajo

    SWMS for caulking, grouting and patching concrete panels, block and brick work, paving tiles and other building components.

    También se vende por separado
  17. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  18. Concrete Sawing and Core Drilling

    SWMS · 13 pasos del trabajo

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    También se vende por separado
  19. Air Compressor

    SWMS · 9 pasos del trabajo

    SWMS for portable air compressor work: transport, set-up, operation, fuel and electrical hazards, noise, housekeeping, shut-down and emergencies.

    También se vende por separado
  20. Concrete Slab on Ground

    SWMS · 17 pasos del trabajo

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Pre-cast Tilt-up Panels19$89.95 · 1 crédito
Mobile Plant Working Near-Around8$89.95 · 1 crédito
Handheld Power Tools0$89.95 · 1 crédito
Dogman0$89.95 · 1 crédito
Spotter11$89.95 · 1 crédito
Concrete Placement and Finishing13$89.95 · 1 crédito
Concrete Boom or Line Pumping15$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Concrete Foundations Excavating - Pouring17$89.95 · 1 crédito
Silica Dust14$89.95 · 1 crédito
Platform Ladder0$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Dogman12$89.95 · 1 crédito
Tilt-up Panel Lifting18$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Caulking Grouting Patching12$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Concrete Sawing and Core Drilling13$89.95 · 1 crédito
Air Compressor9$89.95 · 1 crédito
Concrete Slab on Ground17$89.95 · 1 crédito
Comprando uno por uno$1,799.00 · 20 créditos
En este paquete$1,349.25 · 15 créditos Ahorras $449.75

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.