抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器

体系 · 127 份文件属于Boilermaker OHS-WHS Industry Suite

Rail Corridor

SWMS · SWMS-10589

  • 15 个工作步骤
  • 版本 4

This SWMS covers the hazards and controls for preparing, planning and carrying out work in a rail corridor. It is meant as an attachment, used alongside the SWMS for the specific work being done in the corridor.

It takes your crew through each step, from training and planning to work area set-up, deliveries, tools, hazardous substances, roadside work, completion and emergency response.

It suits contractors, site supervisors and safety officers on construction or maintenance work in rail corridors.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

查看单独页面

Rail Corridor SWMS 预览

Rail Corridor

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Struck by train, electrocution

      Before controls4 Acute
      Controls
      • Ensure all people working within rail corridor (15m from outer tracks or between track and fence line) have undergone formal Rail Industry Safety Induction and certificate of competencies as required

      • All people who are required or may be required for their work to enter a part of the Rail Corridor deemed to be an Electrical Traction Corridor must have successfully completed Electrical Safety Awareness training.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 14 个工作步骤,从“Planning”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个体系

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。这一份需要 20 个额度。

    比较套餐和价格
  • 单独购买

    $999.90 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

涵盖内容

15 个工作步骤

  1. TrainingInduct personnel and make them aware of rail-specific hazards.
  2. PlanningPlan the work to minimise disruption and meet rail network requirements.
  3. Check weather conditions & prepareCheck the weather and take weather-related precautions.
  4. Arrival on-site & assess onsite conditionsAssess the site and identify risks on arrival.
  5. Work area set-upSet up safe zones and agree communication with network control.
  6. House keepingKeep the work environment clean and safe.
  7. Manual tasksPrevent musculoskeletal injuries.
  8. Materials deliveryDeliver materials safely to avoid accidents.
  9. Working with powered & non-powered toolsFollow electrical safety and tool operation protocols.
  10. Hazardous substance / chemical useHandle and use hazardous materials safely.
  11. Working & delivery of materials & equipmentWork and deliver materials safely within the rail corridor.
  12. Working roadside (crossings etc.)Manage traffic and keep the public safe.
  13. Hazardous atmospheres / materialsManage the risks from asbestos and lead.
  14. On completionSecure the site and keep it safe after completion.
  15. Emergency responseRespond to emergencies and incidents.

涵盖的危险

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。