抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器
超值套装 · 15 个模板

Concrete Tilt-up Construction

超值套装 · PACK-50319

Concrete Tilt-up Construction 超值套装模板预览
  • 15 个模板
  • 15 份,只需 11 的价钱
  • 全部放入一个模板库文件夹

A set of 15 SWMS for tilt-up and precast panel contractors: tilt-up panels, panel lifting, concrete placement, foundations, dogging and spotters.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 11 template credits instead of 15.

Pre-cast Tilt-up Panels SWMS 预览

Pre-cast Tilt-up Panels

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Is the work associated with a construction project?
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to silica dust

      Before controls4 Acute
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 18 个工作步骤,从“Temporary casting bed-design”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 11 个额度,而不是 15 个。

    比较套餐和价格
  • 单独购买

    $989.45 $1,349.25 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Pre-cast Tilt-up Panels

    SWMS · 19 个工作步骤

    Pre-cast Tilt-up Panels SWMS: nineteen job steps covering casting beds, formwork, steel reinforcement, concrete placing, stripping and emergency response.

    也可单独购买
  2. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  3. Spotter

    SWMS · 11 个工作步骤

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    也可单独购买
  4. Concrete Placement and Finishing

    SWMS · 13 个工作步骤

    SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.

    也可单独购买
  5. Concrete Boom or Line Pumping

    SWMS · 15 个工作步骤

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    也可单独购买
  6. Concrete Foundations Excavating - Pouring

    SWMS · 17 个工作步骤

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    也可单独购买
  7. Silica Dust

    SWMS · 14 个工作步骤

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    也可单独购买
  8. Dogman

    SWMS · 12 个工作步骤

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    也可单独购买
  9. Tilt-up Panel Lifting

    SWMS · 18 个工作步骤

    Tilt-up Panel Lifting SWMS: 18 job steps covering the lifting and bracing of tilt-up and precast concrete panels, from site set-up to emergency response.

    也可单独购买
  10. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  11. Caulking Grouting Patching

    SWMS · 12 个工作步骤

    SWMS for caulking, grouting and patching concrete panels, block and brick work, paving tiles and other building components.

    也可单独购买
  12. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  13. Concrete Sawing and Core Drilling

    SWMS · 13 个工作步骤

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    也可单独购买
  14. Air Compressor

    SWMS · 9 个工作步骤

    SWMS for portable air compressor work: transport, set-up, operation, fuel and electrical hazards, noise, housekeeping, shut-down and emergencies.

    也可单独购买
  15. Concrete Slab on Ground

    SWMS · 17 个工作步骤

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Pre-cast Tilt-up Panels19$89.95 · 1 个额度
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Spotter11$89.95 · 1 个额度
Concrete Placement and Finishing13$89.95 · 1 个额度
Concrete Boom or Line Pumping15$89.95 · 1 个额度
Concrete Foundations Excavating - Pouring17$89.95 · 1 个额度
Silica Dust14$89.95 · 1 个额度
Dogman12$89.95 · 1 个额度
Tilt-up Panel Lifting18$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Caulking Grouting Patching12$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Concrete Sawing and Core Drilling13$89.95 · 1 个额度
Air Compressor9$89.95 · 1 个额度
Concrete Slab on Ground17$89.95 · 1 个额度
逐个购买$1,349.25 · 15 个额度
在本套装中$989.45 · 11 个额度 节省 $359.80

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。