Driver Posture & Responsibilities
Acronyms
PPE - Personal Protective Equipment
SOP - Safe Operating Procedure
模板文件为英文。
超值套装 · PACK-50351

A set of ten SWMS, 11 SOPs, one plan and one form for contractors who install culverts and tanks.
The SWMS cover culvert and tank installation, trench excavation, concrete placement, concrete pumping, traffic corridors and dogging. The SOPs include Front-end Loader, Plant Attachment Maintenance and Backhoe Loader. It also includes Excavation Collapse Emergency Response Plan and Excavation Safety Inspection Checklist.
Each document is the same one sold on its own, so you get every update to it. Together they cost 18 template credits instead of 23.
Driver Posture & Responsibilities
PPE - Personal Protective Equipment
SOP - Safe Operating Procedure
在浏览器中的样子
免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。
$1,619.10 $2,068.85 一次付清,永久归你。免费套餐也能用。
注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。
Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.
也可单独购买Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.
也可单独购买Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.
也可单独购买SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.
也可单独购买Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.
也可单独购买SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.
也可单独购买Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.
也可单独购买Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.
也可单独购买Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.
也可单独购买Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.
也可单独购买A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.
也可单独购买Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.
也可单独购买Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.
也可单独购买Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.
也可单独购买A seven-step emergency response plan for trench and excavation collapses, with site details, emergency contacts and a rescue equipment checklist.
也可单独购买Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.
也可单独购买A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.
也可单独购买Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.
也可单独购买Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.
也可单独购买Formwork Decks-Columns-Stairs SWMS: 21 job steps covering formwork design, tools, working at height, crane lifts, stripping and emergencies.
也可单独购买Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.
也可单独购买A checklist for inspecting excavation and trenching work: soil, utilities, protective systems, access, atmosphere, water and emergency response.
也可单独购买Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.
也可单独购买每份 SWMS 都附有我们的法规和实施规程参考清单。
| 模板 | 工作步骤 | 单独购买 |
|---|---|---|
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 15 | $89.95 · 1 个额度 | |
| 13 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 15 | $89.95 · 1 个额度 | |
| 8 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 12 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 23 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 12 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 18 | $89.95 · 1 个额度 | |
| 21 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 0 | $89.95 · 1 个额度 | |
| 17 | $89.95 · 1 个额度 | |
| 逐个购买 | ||
| 在本套装中 | $1,619.10 · 18 个额度 节省 $449.75 | |
暂无评价。
模板如何使用
每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。
在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。
你的信息和标志都会带过去。这个模板打开时已经填好。
付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。