抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 14 个模板

Flooring Combo

超值套装 · PACK-50352

Flooring Combo 超值套装模板预览
  • 14 个模板
  • 14 份,只需 11 的价钱
  • 全部放入一个模板库文件夹

A set of ten SWMS and four SOPs for floor layers and floor covering contractors.

The SWMS cover timber floors, vinyl floors, carpet, floating floors, floor covering removal and concrete grinding and polishing. The SOPs include Handheld Power Tools, Manual Handling and Hand Tools.

Each document is the same one sold on its own, so you get every update to it. Together they cost 11 template credits instead of 14.

Asbestos Awareness SWMS 预览

Asbestos Awareness

SWMSVersion 2
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • AsbestosAsbestos disturbance
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Planning and preparation

Planning / preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. Specify?

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 3 个工作步骤,从“Assess for the presence of asbestos”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 11 个额度,而不是 14 个。

    比较套餐和价格
  • 单独购买

    $989.45 $1,259.30 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Asbestos Awareness

    SWMS · 4 个工作步骤

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    也可单独购买
  2. Handheld Power Tools

    SOP · 9 个章节

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    也可单独购买
  3. Timber Floor Laying

    SWMS · 13 个工作步骤

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    也可单独购买
  4. Manual Handling

    SOP · 5 个章节

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    也可单独购买
  5. Hand Tools

    SOP · 9 个章节

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    也可单独购买
  6. Vinyl Floor Laying

    SWMS · 15 个工作步骤

    A vinyl floor laying SWMS covering the hazards and controls of laying vinyl sheet and tiles, from night work and delivery to welding and emergency response.

    也可单独购买
  7. Floor Covering Removal

    SWMS · 16 个工作步骤

    Floor Covering Removal SWMS: 16 job steps covering tile, concrete, carpet, timber and vinyl removal, silica dust, asbestos and emergencies.

    也可单独购买
  8. Utility-Box Cutter Knife

    SOP · 7 个章节

    Safe operating procedure for a utility-box cutter knife: hazards, PPE, precautions, operation, emergency response and a training register.

    也可单独购买
  9. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  10. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  11. Concrete Grinding and Polishing

    SWMS · 14 个工作步骤

    SWMS for floor grinding and polishing on concrete: site set-up, silica dust, chemicals, fuelling, electrical hazards and emergency response.

    也可单独购买
  12. Carpet Laying

    SWMS · 14 个工作步骤

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    也可单独购买
  13. Floating Floor Laying

    SWMS · 14 个工作步骤

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    也可单独购买
  14. Concrete Floor Preparation

    SWMS · 14 个工作步骤

    Concrete Floor Preparation SWMS: 14 job steps covering silica dust, grinding, patching and levelling compounds, fuelling and emergencies.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Asbestos Awareness4$89.95 · 1 个额度
Handheld Power Tools0$89.95 · 1 个额度
Timber Floor Laying13$89.95 · 1 个额度
Manual Handling0$89.95 · 1 个额度
Hand Tools0$89.95 · 1 个额度
Vinyl Floor Laying15$89.95 · 1 个额度
Floor Covering Removal16$89.95 · 1 个额度
Utility-Box Cutter Knife0$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Concrete Grinding and Polishing14$89.95 · 1 个额度
Carpet Laying14$89.95 · 1 个额度
Floating Floor Laying14$89.95 · 1 个额度
Concrete Floor Preparation14$89.95 · 1 个额度
逐个购买$1,259.30 · 14 个额度
在本套装中$989.45 · 11 个额度 节省 $269.85

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。