抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 37 个模板

Shop-fitting Combo

超值套装 · PACK-50354

Shop-fitting Combo 超值套装模板预览
  • 37 个模板
  • 37 份,只需 28 的价钱
  • 全部放入一个模板库文件夹

A set of 15 SWMS and 22 SOPs for shop-fitters and fit-out contractors.

The SWMS cover site establishment, partitioning, plasterboard, suspended ceilings, glazing and soft demolition. The SOPs include Table Saw, Reciprocating Saw and Handheld Circular Saw.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 37.

Height Access Equipment SWMS 预览

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 16 个工作步骤,从“Work area set-up”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 28 个额度,而不是 37 个。

    比较套餐和价格
  • 单独购买

    $2,518.60 $3,328.15 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Height Access Equipment

    SWMS · 17 个工作步骤

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    也可单独购买
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 个工作步骤

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    也可单独购买
  3. Battery Charging and Handling

    SOP · 7 个章节

    Safe operating procedure for charging and handling batteries: hazards, emergency response to acid splashes, PPE, precautions, recharging area and battery movement.

    也可单独购买
  4. Painting and Decorating

    SWMS · 15 个工作步骤

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    也可单独购买
  5. Glazing

    SWMS · 15 个工作步骤

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    也可单独购买
  6. Table Saw

    SOP · 9 个章节

    Safe operating procedure for a table saw: hazards, PPE, precautions, pre-operational inspection, operation, kickback prevention and a hazard checklist.

    也可单独购买
  7. Soft Demolition

    SWMS · 20 个工作步骤

    SWMS for soft demolition and strip-out: asbestos, silica dust, glass removal, working at height, tools, waste and emergency response.

    也可单独购买
  8. Reciprocating Saw

    SOP · 9 个章节

    Safe operating procedure for a reciprocating saw: hazards, PPE, training, pre-operational inspection, maintenance, operation, first aid and a hazard checklist.

    也可单独购买
  9. Trestle Scaffold

    SOP · 7 个章节

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    也可单独购买
  10. Plasterboard

    SWMS · 16 个工作步骤

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    也可单独购买
  11. Electric Air Compressor

    SOP · 9 个章节

    Safe operating procedure for an electric air compressor: hazards, PPE, inspection, operation, cleaning and a hazard checklist.

    也可单独购买
  12. Manual Handling

    SOP · 5 个章节

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    也可单独购买
  13. Site Establishment Shop Fit-out

    SWMS · 10 个工作步骤

    Site Establishment Shop Fit-out SWMS: 10 job steps from planning and arrival to powered tools, completion and emergency response.

    也可单独购买
  14. Handheld Circular Saw

    SOP · 8 个章节

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    也可单独购买
  15. Nail Gun - Battery Operated -

    SOP · 8 个章节

    Safe operating procedure for a battery-operated nail gun: hazards, PPE, battery charging, operation, jammed nails and a training register.

    也可单独购买
  16. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  17. Silica Dust

    SWMS · 14 个工作步骤

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    也可单独购买
  18. Platform Ladder

    SOP · 7 个章节

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    也可单独购买
  19. Docking Saw

    SOP · 10 个章节

    Safe operating procedure for a docking saw: hazards, PPE, pre-operational inspection, maintenance, step-by-step operation and a hazard checklist.

    也可单独购买
  20. V Cut Mitre Saw

    SOP · 10 个章节

    Safe operating procedure for a V cut mitre saw: hazards, PPE, training, inspection, blade replacement, operation, maintenance and a hazard checklist.

    也可单独购买
  21. Angle Grinder

    SOP · 9 个章节

    Safe operating procedure for an angle grinder: hazards, PPE, inspection, precautions, operation, changing discs, maintenance and a hazard checklist.

    也可单独购买
  22. Pneumatic Tools

    SOP · 8 个章节

    Safe operating procedure for pneumatic tools: hazards, PPE, precautions, maintenance, pre-operational inspection, operation and a hazard checklist.

    也可单独购买
  23. Jigsaw

    SOP · 9 个章节

    Safe operating procedure for a jigsaw: hazards, PPE, training, pre-operational inspection, operation, blade replacement, maintenance and a hazard checklist.

    也可单独购买
  24. Mitre/Drop Saw

    SOP · 8 个章节

    Safe operating procedure for a mitre or drop saw: hazards, PPE, precautions, inspection, maintenance, operation, blade replacement and a hazard checklist.

    也可单独购买
  25. Hand Tools

    SOP · 9 个章节

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    也可单独购买
  26. Handheld Router

    SOP · 9 个章节

    Safe operating procedure for a handheld router: hazards, PPE, training, inspection, maintenance, operating steps and a hazard checklist.

    也可单独购买
  27. Cabinet Installation

    SWMS · 12 个工作步骤

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    也可单独购买
  28. Suspended Grid System Ceiling Installation

    SWMS · 12 个工作步骤

    Suspended grid system ceiling installation SWMS: 12 job steps covering ladders and trestles, silica dust, falling objects, mobile plant and emergencies.

    也可单独购买
  29. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  30. Scissor Lift

    SOP · 10 个章节

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    也可单独购买
  31. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  32. Tiling

    SWMS · 14 个工作步骤

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    也可单独购买
  33. Partitioning Steel-Stud-Track

    SWMS · 12 个工作步骤

    Covers installing steel, stud and track partitioning in commercial premises, with the risks and controls for each job step from silica training to emergency response.

    也可单独购买
  34. Nail Gun - Pneumatic -

    SOP · 8 个章节

    Safe operating procedure for a pneumatic nail gun: hazards, PPE, training, inspection, maintenance, operation, jammed nails and a hazard checklist.

    也可单独购买
  35. Working with Guarded Machinery

    SOP · 12 个章节

    Safe operating procedure for working with or near guarded machinery: hazards, PPE, maintenance and LOTO, cleaning, reporting and a hazard checklist.

    也可单独购买
  36. Mobile Scaffolding

    SOP · 8 个章节

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    也可单独购买
  37. Handheld Drill

    SOP · 9 个章节

    Safe operating procedure for a handheld drill: hazards, PPE, precautions, pre-operational inspection, operation, maintenance and a hazard checklist.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Height Access Equipment17$89.95 · 1 个额度
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 个额度
Battery Charging and Handling0$89.95 · 1 个额度
Painting and Decorating15$89.95 · 1 个额度
Glazing15$89.95 · 1 个额度
Table Saw0$89.95 · 1 个额度
Soft Demolition20$89.95 · 1 个额度
Reciprocating Saw0$89.95 · 1 个额度
Trestle Scaffold0$89.95 · 1 个额度
Plasterboard16$89.95 · 1 个额度
Electric Air Compressor0$89.95 · 1 个额度
Manual Handling0$89.95 · 1 个额度
Site Establishment Shop Fit-out10$89.95 · 1 个额度
Handheld Circular Saw0$89.95 · 1 个额度
Nail Gun - Battery Operated -0$89.95 · 1 个额度
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Silica Dust14$89.95 · 1 个额度
Platform Ladder0$89.95 · 1 个额度
Docking Saw0$89.95 · 1 个额度
V Cut Mitre Saw0$89.95 · 1 个额度
Angle Grinder0$89.95 · 1 个额度
Pneumatic Tools0$89.95 · 1 个额度
Jigsaw0$89.95 · 1 个额度
Mitre/Drop Saw0$89.95 · 1 个额度
Hand Tools0$89.95 · 1 个额度
Handheld Router0$89.95 · 1 个额度
Cabinet Installation12$89.95 · 1 个额度
Suspended Grid System Ceiling Installation12$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Scissor Lift0$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Tiling14$89.95 · 1 个额度
Partitioning Steel-Stud-Track12$89.95 · 1 个额度
Nail Gun - Pneumatic -0$89.95 · 1 个额度
Working with Guarded Machinery0$89.95 · 1 个额度
Mobile Scaffolding0$89.95 · 1 个额度
Handheld Drill0$89.95 · 1 个额度
逐个购买$3,328.15 · 37 个额度
在本套装中$2,518.60 · 28 个额度 节省 $809.55

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。