抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 17 个模板

Working at Height Combo

超值套装 · PACK-50355

Working at Height Combo 超值套装模板预览
  • 17 个模板
  • 17 份,只需 14 的价钱
  • 全部放入一个模板库文件夹

A set of nine SWMS, seven SOPs and one plan for contractors who work at height.

The SWMS cover ladders, scaffolds, roof edge protection, rope access, safety harnesses and elevating work platforms. The SOPs include Handheld Power Tools, Trestle Scaffold and Manual Handling. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 14 template credits instead of 17.

Ladders SWMS 预览

Ladders

SWMSVersion 7
Company doing the work
[Company]
Business contact
—
Business contact phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following "High-Risk Construction Work" (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures.

  • Establish supervisory and communication arrangements.

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card for construction work.

  • Relevant workers have relevant certificates of competency, licenses, and training. (specify on the SWMS sign-off for each worker)

  • Trained First Aider on site.

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs.

  • Attend all site inductions/briefings.

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended, if necessary, in consultation with relevant people after any near miss or incident.

  • If additional site hazards identified, review this SWMS and amend control measures to suit.

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP.

  • Give the principal contractor a copy of the revised SWMS.

  • The site supervisor to monitor works against the controls stated in this SWMS.

  • SWMS must be kept on-site and made available for inspection or review.

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident.

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add notes specific to this site)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

Inherent risk-rating (IR) before controls – residual risk-rating (RR) after controls.

  • Work activity

    Training

    • Hazard

      Lack of knowledge or training on safe ladder use

      Before controls3 High
      Controls
      • Provide training for all workers on safe ladder use, including choosing the right ladder, correct setup, and safe climbing practices.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 9 个工作步骤,从“Manual Handling”到“Incident Management”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 14 个额度,而不是 17 个。

    比较套餐和价格
  • 单独购买

    $1,259.30 $1,529.15 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Ladders

    SWMS · 10 个工作步骤

    Ladders SWMS: 10 job steps covering transport, set-up, safe use, electrical hazards, emergencies and incident reporting for step, extension and platform ladders.

    也可单独购买
  2. Roof Edge Protection

    SWMS · 16 个工作步骤

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    也可单独购买
  3. Falls Emergency Rescue Plan

    管理计划 · 14 个章节

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    也可单独购买
  4. Handheld Power Tools

    SOP · 9 个章节

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    也可单独购买
  5. Erecting Fixed Scaffold

    SWMS · 14 个工作步骤

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    也可单独购买
  6. Trestle Scaffold

    SOP · 7 个章节

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    也可单独购买
  7. Mobile Scaffold

    SWMS · 11 个工作步骤

    A Mobile Scaffold SWMS covering the hazards and controls for erecting, using, moving and dismantling mobile scaffolds, from training to incident management.

    也可单独购买
  8. Manual Handling

    SOP · 5 个章节

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    也可单独购买
  9. Rope Access

    SWMS · 13 个工作步骤

    Rope Access SWMS: 13 job steps covering rigging plans, falls rescue planning, inspecting harnesses and anchor points, and working on the ropes.

    也可单独购买
  10. Safety Harness

    SWMS · 10 个工作步骤

    Safety harness SWMS: 10 job steps from anchor point set-up and harness inspection to fall rescue, incident management and departure.

    也可单独购买
  11. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  12. Platform Ladder

    SOP · 7 个章节

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    也可单独购买
  13. Hand Tools

    SOP · 9 个章节

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    也可单独购买
  14. Cherry Picker

    SOP · 10 个章节

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    也可单独购买
  15. Scissor Lift

    SOP · 10 个章节

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    也可单独购买
  16. Trestles

    SWMS · 10 个工作步骤

    Trestles SWMS: 10 job steps covering trestle handling, set-up, work at height, electric shock, wet weather and emergencies.

    也可单独购买
  17. Working on Scaffolds

    SWMS · 7 个工作步骤

    Working on Scaffolds SWMS: 7 job steps covering scaffold inspection, general use, mobile scaffolds, trestles, emergencies and incidents.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Ladders10$89.95 · 1 个额度
Roof Edge Protection16$89.95 · 1 个额度
Falls Emergency Rescue Plan0$89.95 · 1 个额度
Handheld Power Tools0$89.95 · 1 个额度
Erecting Fixed Scaffold14$89.95 · 1 个额度
Trestle Scaffold0$89.95 · 1 个额度
Mobile Scaffold11$89.95 · 1 个额度
Manual Handling0$89.95 · 1 个额度
Rope Access13$89.95 · 1 个额度
Safety Harness10$89.95 · 1 个额度
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Platform Ladder0$89.95 · 1 个额度
Hand Tools0$89.95 · 1 个额度
Cherry Picker0$89.95 · 1 个额度
Scissor Lift0$89.95 · 1 个额度
Trestles10$89.95 · 1 个额度
Working on Scaffolds7$89.95 · 1 个额度
逐个购买$1,529.15 · 17 个额度
在本套装中$1,259.30 · 14 个额度 节省 $269.85

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。