Cleaning Public Park Amenities
- Company doing the work
- [Company]
- Business contact and phone
- —
- Responsible person (for monitoring SWMS and work)
- —
- Responsible person's phone
- —
- Responsible person's signature
- —
- Date signed
- —
- Principal Contractor (PC)
- —
- PC Address
- —
- PC phone
- —
- Date SWMS provided to PC
- —
- Job Site Address
- —
- Part of a construction project
- —
Site management plan
If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.
High-risk construction work
This work activity involves the following "High-Risk Construction Work" (HRCW - identified in the Job Task column)
- Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
Planning and preparation
Planning/Preparation
Liaise with Principal Contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
Principal contractor to confirm emergency response procedures are in place.
Hold points
Hold points identified and signed off before continuing work. (specify the hold points)
Training and licences
All workers to have a General Construction Induction Card
Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.
Trained First Aider on site
All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.
Worker duties and responsibilities
Fit condition for work, i.e., no signs of fatigue, alcohol or drugs
Attend all site inductions/briefings
Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor.
Monitoring and review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.
Site-specific notes
Site-Specific Notes:
Legislation and codes of practice
None listed.
Personal protective equipment (PPE)
- Foot Protection
- Hearing Protection
- Eye Protection
- Hand Protection
- Protective Clothing
- Breathing Protection
- Sun Protection
Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.
Job steps, hazards and controls
- Work activity
Planning
- Hazard
Infection; disease; allergic reaction
Before controls3 HighControlsEnsure vaccinations (such as Hepatitis B, tetanus.) are offered to staff.
people with known allergic responses should consult a doctor and ensure appropriate kit is available at all times (Including EpiPen - in date).
After controls2 ModerateResponsible- Supervisorto ensure all planning and scheduling is followed
- Hazard
Emergency
Before controls4 AcuteControlsEnsure a second person knows your location and expected time of return
Use mobile phone, telephone or radio to periodically check-in
Communication equipment within easy reach at all times
Take extra care to work safely and methodically
Have a first aid kit readily available and stocked appropriately.
After controls2 ModerateResponsible- Supervisorto ensure all planning and scheduling is followed
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls
14 more job steps, from Check weather conditions & prepare to Emergency response
Each with its hazards, risk ratings and controls, plus your crew's sign-on.