Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer

Value pack · 20 templatesPart of Fire Services Combo

Fire Sprinkler System Installation

SWMS · SWMS-10404

  • 19 job steps
  • Version 7

This Fire Sprinkler System Installation Safe Work Method Statement (SWMS) provides guidelines for safely installing fire sprinkler systems using Elevating Work Platforms (EWPs) like boom lifts, cherry pickers, and scissor lifts.

It takes your crew through each job step, from arriving on site and delivering the EWP to materials delivery, working at height, installing pipework, welding and soldering, commissioning the system, fuelling on site and emergency response.

It sets out the hazards and risk control measures for each step, with who is responsible, and the hazards of silica dust, hot work, heat stress and mobile plant.

It suits construction companies, fire protection services, EWP operators, and safety officers and supervisors.

See its own page

Preview of the Fire Sprinkler System Installation SWMS

Fire Sprinkler System Installation

SWMSVersion 7
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—

Site management plan

Is the work associated with a Construction Project?

  • Yes

  • No

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following 'High-Risk Construction Work' (HRCW - identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • High Visibility
  • Head Protection
  • Face Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

18 more job steps, from Arrival on-site & assess onsite conditions to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 15 instead of 20.

    Compare plans and prices
  • Buy it once

    $1,349.25 $1,799.00 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

19 job steps

  1. Provide training on the health effects associated with RCSTrain workers on RCS health effects, dust controls and RPE use
  2. Arrival on-site & assess onsite conditionsPark safely, report in and check the site conditions
  3. Delivery, set-up & removal of EWPCheck the ground and transport, load and unload the EWP safely
  4. Work area set-upSet up exclusion zones and check for services before work
  5. EnvironmentControl noise, waste, fuels and impacts on waterways and fauna
  6. HousekeepingKeep the work area clean, lit and free of trip hazards
  7. Manual tasksLift and move materials safely to prevent MSD injuries
  8. Materials deliveryControl delivery vehicles and the unloading of materials
  9. Working with powered & non-powered toolsInspect and use powered and non-powered tools safely
  10. Hazardous substance / chemical useUse hazardous substances as their SDS directs
  11. Working at height on ladders & mobile scaffoldSet up and use ladders and scaffolds to prevent falls
  12. EWP - Pre-start checkInspect the EWP before use
  13. Operating EWPOperate the EWP safely and keep groundworkers clear
  14. Installing pipeworkInstall pipework, controlling falling objects, tools, cutting and silica dust
  15. Welding, solderingWeld and solder under a hot work permit, controlling fire, burns, eye injury and heat stress
  16. Commission systemPressure test and commission the system
  17. Fuelling on-siteRefuel plant on site, controlling fire and fuel exposure
  18. On completionPark and secure the EWP, clean up and sign out
  19. Emergency responseRespond to emergencies and incidents

Hazards it covers

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.