Mobile Scaffold

SWMS · SWMS-10386

  • 11 job steps
  • Version 6

This Mobile Scaffold Safe Work Method Statement (SWMS) outlines the general safety steps, hazards and controls for erecting, using, moving and dismantling mobile scaffolds.

It takes your crew through 11 job steps, from training, planning, manual handling and transport, to assessing the site, erecting the scaffold, working on it, moving it, breaking it down, emergency response and incident management.

It does not cover the specific setup of height access equipment. Unless this SWMS says otherwise, a separate, dedicated SWMS is needed to set up or erect height access equipment such as mobile elevated work platforms.

It suits businesses and workers in construction, maintenance and any activity that needs mobile scaffolds, including construction managers, safety officers and scaffolding specialists. Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

See its own page

Preview of the Mobile Scaffold SWMS

Mobile Scaffold

SWMSVersion 6
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—

Site management plan

Is the work associated with a Construction Project?

  • Yes

  • No

If the work is part of a construction project, this SWMS must align with the requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following "High-Risk Construction Work" (HRCW – identified in the Job Task column)

  • Gas MainsWork on or near pressurised gas distribution mains or piping
  • Hazardous LinesWork on or near chemical, fuel or refrigerant lines
  • Energised ElectricalWork on or near energised electrical installations or services
  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures.

  • Establish supervisory and communication arrangements.

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card for construction work.

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site.

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs.

  • Attend all site inductions/briefings.

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident.

  • If additional site hazards are identified, review this SWMS and amend control measures to suit.

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP.

  • Give the principal contractor a copy of the revised SWMS.

  • The site supervisor to monitor works against the controls stated in this SWMS.

  • SWMS must be kept on-site and made available for inspection or review.

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident.

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Lack of knowledge or training on safe mobile scaffold use

      Before controls3 High
      Controls
      • Train all workers on safe mobile scaffold use, including choosing the right scaffold, correct setup, and safe climbing practices.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

10 more job steps, from Planning to Incident management

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 7 instead of 9.

    Compare plans and prices
  • Buy it once

    $629.65 $809.55 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

11 job steps

  1. TrainingTrain workers in safe mobile scaffold use
  2. PlanningChoose the right scaffold, get permits and use a licensed scaffolder
  3. Manual HandlingLift and carry scaffold components safely
  4. Transporting mobile scaffoldingSecure and transport mobile scaffolds safely
  5. Arrival on-site & assess on-site conditionsAssess the site and run pre-start checks
  6. Erecting mobile scaffoldErect the scaffold to the manufacturer's guidelines
  7. Working on mobile scaffoldsWork safely on the scaffold
  8. Moving mobile scaffoldMove the scaffold safely, including lifting by crane
  9. Breaking down the scaffoldDismantle and store the scaffold
  10. Emergency responseFollow emergency procedures and call for help
  11. Incident managementReport incidents and learn from them

Hazards it covers

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.