Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Paquete ahorro · 54 plantillas

Builders OHS-WHS Combo

Paquete ahorro · PACK-50443

Vista previa de la plantilla Paquete ahorro Builders OHS-WHS Combo
  • 54 plantillas
  • 54 por el precio de 28
  • Llega en una carpeta de la Biblioteca

A set of 53 SWMS and one plan for builders and building contractors.

The SWMS cover site establishment, carpentry, roofing, scaffolding, plumbing and drainage, glazing and painting. It also includes Construction OHS/WHS Project Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 54.

Vista previa de SWMS Height Access Equipment

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 pasos más del trabajo, de Work area set-up a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 28 en vez de 54.

    Comparar planes y precios
  • Cómprala una sola vez

    $2,518.60 $4,857.30 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Height Access Equipment

    SWMS · 17 pasos del trabajo

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    También se vende por separado
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 pasos del trabajo

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    También se vende por separado
  3. Painting and Decorating

    SWMS · 15 pasos del trabajo

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    También se vende por separado
  4. Roof Work

    SWMS · 14 pasos del trabajo

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    También se vende por separado
  5. Glazing

    SWMS · 15 pasos del trabajo

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    También se vende por separado
  6. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  7. Retaining Wall

    SWMS · 19 pasos del trabajo

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    También se vende por separado
  8. Roof Edge Protection

    SWMS · 16 pasos del trabajo

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    También se vende por separado
  9. Garage Door Installation

    SWMS · 14 pasos del trabajo

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    También se vende por separado
  10. Insulation - Batts Installation

    SWMS · 12 pasos del trabajo

    SWMS for installing insulation batts in ceilings and walls: planning, delivery, ceiling space access, electricity, falls, asbestos, heat stress and fire.

    También se vende por separado
  11. Erecting Fixed Scaffold

    SWMS · 14 pasos del trabajo

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    También se vende por separado
  12. Plumbing Drainage

    SWMS · 18 pasos del trabajo

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    También se vende por separado
  13. Final Building Clean Before Handover to Client

    SWMS · 10 pasos del trabajo

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    También se vende por separado
  14. Rough-in Final Fit-out Plumbing

    SWMS · 18 pasos del trabajo

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    También se vende por separado
  15. Timber Floor Laying

    SWMS · 13 pasos del trabajo

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    También se vende por separado
  16. Skip Bin

    SWMS · 11 pasos del trabajo

    Skip Bin SWMS: eleven job steps for skip bin delivery and pick-up with a truck-mounted skip lifter, from travel and set-up to emergency response.

    También se vende por separado
  17. Concrete Boom or Line Pumping

    SWMS · 15 pasos del trabajo

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    También se vende por separado
  18. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 pasos del trabajo

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    También se vende por separado
  19. Construction Labourer

    SWMS · 16 pasos del trabajo

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    También se vende por separado
  20. Temporary Fencing

    SWMS · 11 pasos del trabajo

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    También se vende por separado
  21. Plasterboard

    SWMS · 16 pasos del trabajo

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    También se vende por separado
  22. Decking

    SWMS · 19 pasos del trabajo

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    También se vende por separado
  23. Brick and Block Laying

    SWMS · 22 pasos del trabajo

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    También se vende por separado
  24. Concrete Foundations Excavating - Pouring

    SWMS · 17 pasos del trabajo

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    También se vende por separado
  25. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  26. Fencing

    SWMS · 16 pasos del trabajo

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    También se vende por separado
  27. Duct Work Installation

    SWMS · 11 pasos del trabajo

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    También se vende por separado
  28. Working in Roof Spaces

    SWMS · 8 pasos del trabajo

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    También se vende por separado
  29. Construction Site Visitor

    SWMS · 7 pasos del trabajo

    Construction Site Visitor SWMS: 7 job steps covering weather, site arrival, manual tasks, navigating the site and emergencies.

    También se vende por separado
  30. Overhead Electric Lines - Working Near

    SWMS · 6 pasos del trabajo

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    También se vende por separado
  31. Construction OHS/WHS Project Management Plan

    Plan de gestión · 28 secciones

    A construction OHS/WHS site management plan covering site rules, risk management, contractors, incidents and the forms and registers a project needs.

    También se vende por separado
  32. Earthmoving Equipment

    SWMS · 23 pasos del trabajo

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    También se vende por separado
  33. Timber Floor Sanding and Finishing

    SWMS · 14 pasos del trabajo

    SWMS for sanding indoor timber floors and applying varnish or similar coatings: set-up, tools, dust, chemicals, refuelling and emergencies.

    También se vende por separado
  34. Cladding

    SWMS · 12 pasos del trabajo

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    También se vende por separado
  35. Cabinet Installation

    SWMS · 12 pasos del trabajo

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    También se vende por separado
  36. Air Conditioning Installation

    SWMS · 16 pasos del trabajo

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    También se vende por separado
  37. Dogman

    SWMS · 12 pasos del trabajo

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    También se vende por separado
  38. Rendering

    SWMS · 14 pasos del trabajo

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    También se vende por separado
  39. Electrical New Installation

    SWMS · 20 pasos del trabajo

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    También se vende por separado
  40. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  41. Plumbing Gas Fitting

    SWMS · 21 pasos del trabajo

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    También se vende por separado
  42. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  43. Carpet Laying

    SWMS · 14 pasos del trabajo

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    También se vende por separado
  44. Tiling

    SWMS · 14 pasos del trabajo

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    También se vende por separado
  45. Awnings Blinds Curtains Installation

    SWMS · 14 pasos del trabajo

    SWMS for installing awnings, blinds and curtains: site set-up, tools, working at height on ladders and trestles, drilling brackets, mounting and emergencies.

    También se vende por separado
  46. Excavation Near Assets

    SWMS · 13 pasos del trabajo

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    También se vende por separado
  47. Plumbing - Water Meter Installation

    SWMS · 16 pasos del trabajo

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    También se vende por separado
  48. Concrete Slab on Ground

    SWMS · 17 pasos del trabajo

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    También se vende por separado
  49. Waterproofing

    SWMS · 12 pasos del trabajo

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    También se vende por separado
  50. Floating Floor Laying

    SWMS · 14 pasos del trabajo

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    También se vende por separado
  51. Aluminium Window Door Frame Installation

    SWMS · 15 pasos del trabajo

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    También se vende por separado
  52. Framing and Trusses - Timber-Steel

    SWMS · 15 pasos del trabajo

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    También se vende por separado
  53. Site Establishment

    SWMS · 11 pasos del trabajo

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    También se vende por separado
  54. Port-a-loo Service

    SWMS · 8 pasos del trabajo

    Covers servicing a port-a-loo: cleaning, pump-out of the sewage tank and adding deodorising chemicals, with the hazards and controls for each job step.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Height Access Equipment17$89.95 · 1 crédito
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 crédito
Painting and Decorating15$89.95 · 1 crédito
Roof Work14$89.95 · 1 crédito
Glazing15$89.95 · 1 crédito
Mobile Plant Working Near-Around8$89.95 · 1 crédito
Retaining Wall19$89.95 · 1 crédito
Roof Edge Protection16$89.95 · 1 crédito
Garage Door Installation14$89.95 · 1 crédito
Insulation - Batts Installation12$89.95 · 1 crédito
Erecting Fixed Scaffold14$89.95 · 1 crédito
Plumbing Drainage18$89.95 · 1 crédito
Final Building Clean Before Handover to Client10$89.95 · 1 crédito
Rough-in Final Fit-out Plumbing18$89.95 · 1 crédito
Timber Floor Laying13$89.95 · 1 crédito
Skip Bin11$89.95 · 1 crédito
Concrete Boom or Line Pumping15$89.95 · 1 crédito
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 crédito
Construction Labourer16$89.95 · 1 crédito
Temporary Fencing11$89.95 · 1 crédito
Plasterboard16$89.95 · 1 crédito
Decking19$89.95 · 1 crédito
Brick and Block Laying22$89.95 · 1 crédito
Concrete Foundations Excavating - Pouring17$89.95 · 1 crédito
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 crédito
Fencing16$89.95 · 1 crédito
Duct Work Installation11$89.95 · 1 crédito
Working in Roof Spaces8$89.95 · 1 crédito
Construction Site Visitor7$89.95 · 1 crédito
Overhead Electric Lines - Working Near6$89.95 · 1 crédito
Construction OHS/WHS Project Management Plan0$89.95 · 1 crédito
Earthmoving Equipment23$89.95 · 1 crédito
Timber Floor Sanding and Finishing14$89.95 · 1 crédito
Cladding12$89.95 · 1 crédito
Cabinet Installation12$89.95 · 1 crédito
Air Conditioning Installation16$89.95 · 1 crédito
Dogman12$89.95 · 1 crédito
Rendering14$89.95 · 1 crédito
Electrical New Installation20$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Plumbing Gas Fitting21$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Carpet Laying14$89.95 · 1 crédito
Tiling14$89.95 · 1 crédito
Awnings Blinds Curtains Installation14$89.95 · 1 crédito
Excavation Near Assets13$89.95 · 1 crédito
Plumbing - Water Meter Installation16$89.95 · 1 crédito
Concrete Slab on Ground17$89.95 · 1 crédito
Waterproofing12$89.95 · 1 crédito
Floating Floor Laying14$89.95 · 1 crédito
Aluminium Window Door Frame Installation15$89.95 · 1 crédito
Framing and Trusses - Timber-Steel15$89.95 · 1 crédito
Site Establishment11$89.95 · 1 crédito
Port-a-loo Service8$89.95 · 1 crédito
Comprando uno por uno$4,857.30 · 54 créditos
En este paquete$2,518.60 · 28 créditos Ahorras $2,338.70

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.