Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Paquete ahorro · 34 plantillas

Plumbing Combo

Paquete ahorro · PACK-50346

Vista previa de la plantilla Paquete ahorro Plumbing Combo
  • 34 plantillas
  • 34 por el precio de 24
  • Llega en una carpeta de la Biblioteca

A set of 23 SWMS, nine SOPs and two plans for plumbers.

The SWMS cover drainage, rough-in and final fit-out, trench excavation, water jetting, CCTV drain inspection and pumps and valves. The SOPs include Oxy-Acetylene Welding, HDPE Butt Fusion and Extension Ladder. It also includes Falls Emergency Rescue Plan and Confined Space Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 24 template credits instead of 34.

Vista previa de SWMS Height Access Equipment

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 pasos más del trabajo, de Work area set-up a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 24 en vez de 34.

    Comparar planes y precios
  • Cómprala una sola vez

    $2,158.80 $3,058.30 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Height Access Equipment

    SWMS · 17 pasos del trabajo

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    También se vende por separado
  2. Extension Ladder

    SOP · 7 secciones

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    También se vende por separado
  3. Roof Work

    SWMS · 14 pasos del trabajo

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    También se vende por separado
  4. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  5. Falls Emergency Rescue Plan

    Plan de gestión · 14 secciones

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    También se vende por separado
  6. Handheld Power Tools

    SOP · 9 secciones

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    También se vende por separado
  7. Trench Excavation

    SWMS · 15 pasos del trabajo

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    También se vende por separado
  8. Plumbing Drainage

    SWMS · 18 pasos del trabajo

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    También se vende por separado
  9. CCTV Drain Inspection

    SWMS · 12 pasos del trabajo

    Covers the hazards and controls for inspecting drains using CCTV technology, with the risks and controls for each job step from weather checks to emergency response.

    También se vende por separado
  10. Rough-in Final Fit-out Plumbing

    SWMS · 18 pasos del trabajo

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    También se vende por separado
  11. Manual Handling

    SOP · 5 secciones

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    También se vende por separado
  12. Water Jetting Drains

    SWMS · 16 pasos del trabajo

    Hazards and controls for clearing blocked sewers and drains with a truck-mounted hydro-jet, from site set-up and pump use to emergency response.

    También se vende por separado
  13. Plumbing Suspended Pipework

    SWMS · 18 pasos del trabajo

    A SWMS for installing suspended pipework from elevating work platforms, covering 18 job steps with their hazards and controls.

    También se vende por separado
  14. Risers Working In

    SWMS · 12 pasos del trabajo

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    También se vende por separado
  15. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 pasos del trabajo

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    También se vende por separado
  16. Platform Ladder

    SOP · 7 secciones

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    También se vende por separado
  17. Plumbing Pump-Valve Installation

    SWMS · 20 pasos del trabajo

    A SWMS for removing and installing industrial pumps and valves: lock-out, disconnection, lifting, fitting and pressure testing.

    También se vende por separado
  18. Oxy-Acetylene Welding

    SOP · 9 secciones

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    También se vende por separado
  19. Plumbing Temporary Services Connection

    SWMS · 17 pasos del trabajo

    Plumbing Temporary Services Connection SWMS: 17 job steps for temporary water and sewerage connections on construction sites.

    También se vende por separado
  20. Hand Tools

    SOP · 9 secciones

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    También se vende por separado
  21. Earthmoving Equipment

    SWMS · 23 pasos del trabajo

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    También se vende por separado
  22. Fire Sprinkler System Installation

    SWMS · 19 pasos del trabajo

    A SWMS for installing fire sprinkler systems from elevating work platforms: EWP operation, working at height, hot work, silica dust and commissioning.

    También se vende por separado
  23. Cherry Picker

    SOP · 10 secciones

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    También se vende por separado
  24. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 pasos del trabajo

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    También se vende por separado
  25. Powered Non-powered Tools

    SWMS · 12 pasos del trabajo

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    También se vende por separado
  26. Scissor Lift

    SOP · 10 secciones

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    También se vende por separado
  27. Plumbing Gas Fitting

    SWMS · 21 pasos del trabajo

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    También se vende por separado
  28. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  29. Confined Space Work

    SWMS · 10 pasos del trabajo

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    También se vende por separado
  30. Plumbing - Water Meter Installation

    SWMS · 16 pasos del trabajo

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    También se vende por separado
  31. Plumbing Drain Re-lining

    SWMS · 14 pasos del trabajo

    SWMS for drain re-lining: silica dust, confined spaces, mobile plant, resins and air compressors, with controls for 14 job steps.

    También se vende por separado
  32. Confined Space Emergency Rescue Plan

    Plan de gestión · 11 secciones

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    También se vende por separado
  33. Plumbing Call-out

    SWMS · 20 pasos del trabajo

    Plumbing call-out SWMS: 20 job steps covering general repairs, hot water systems and boilers, gas, hot work, asbestos and working at height.

    También se vende por separado
  34. HDPE Butt Fusion

    SOP · 8 secciones

    Safe operating procedure for HDPE butt fusion welding: hazards, PPE, inspection, step-by-step operation, maintenance and a hazard checklist.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Height Access Equipment17$89.95 · 1 crédito
Extension Ladder0$89.95 · 1 crédito
Roof Work14$89.95 · 1 crédito
Mobile Plant Working Near-Around8$89.95 · 1 crédito
Falls Emergency Rescue Plan0$89.95 · 1 crédito
Handheld Power Tools0$89.95 · 1 crédito
Trench Excavation15$89.95 · 1 crédito
Plumbing Drainage18$89.95 · 1 crédito
CCTV Drain Inspection12$89.95 · 1 crédito
Rough-in Final Fit-out Plumbing18$89.95 · 1 crédito
Manual Handling0$89.95 · 1 crédito
Water Jetting Drains16$89.95 · 1 crédito
Plumbing Suspended Pipework18$89.95 · 1 crédito
Risers Working In12$89.95 · 1 crédito
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 crédito
Platform Ladder0$89.95 · 1 crédito
Plumbing Pump-Valve Installation20$89.95 · 1 crédito
Oxy-Acetylene Welding0$89.95 · 1 crédito
Plumbing Temporary Services Connection17$89.95 · 1 crédito
Hand Tools0$89.95 · 1 crédito
Earthmoving Equipment23$89.95 · 1 crédito
Fire Sprinkler System Installation19$89.95 · 1 crédito
Cherry Picker0$89.95 · 1 crédito
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1 crédito
Powered Non-powered Tools12$89.95 · 1 crédito
Scissor Lift0$89.95 · 1 crédito
Plumbing Gas Fitting21$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Confined Space Work10$89.95 · 1 crédito
Plumbing - Water Meter Installation16$89.95 · 1 crédito
Plumbing Drain Re-lining14$89.95 · 1 crédito
Confined Space Emergency Rescue Plan0$89.95 · 1 crédito
Plumbing Call-out20$89.95 · 1 crédito
HDPE Butt Fusion0$89.95 · 1 crédito
Comprando uno por uno$3,058.30 · 34 créditos
En este paquete$2,158.80 · 24 créditos Ahorras $899.50

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.