얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

알뜰 팩 · 템플릿 54개

Builders OHS-WHS Combo

알뜰 팩 · PACK-50443

Builders OHS-WHS Combo 알뜰 팩 템플릿 미리보기
  • 템플릿 54개
  • 28 가격에 54개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of 53 SWMS and one plan for builders and building contractors.

The SWMS cover site establishment, carpentry, roofing, scaffolding, plumbing and drainage, glazing and painting. It also includes Construction OHS/WHS Project Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 54.

Height Access Equipment SWMS 미리 보기

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

작업 단계 16개 더: Work area set-up부터 Emergency response까지

단계마다 위험 요소, 위험도 평가, 관리 조치가 있고, 작업자 서명란도 포함됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 54 대신 28입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $2,518.60 $4,857.30 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Height Access Equipment

    SWMS · 작업 단계 17개

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    단독으로도 판매
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 작업 단계 15개

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    단독으로도 판매
  3. Painting and Decorating

    SWMS · 작업 단계 15개

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    단독으로도 판매
  4. Roof Work

    SWMS · 작업 단계 14개

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    단독으로도 판매
  5. Glazing

    SWMS · 작업 단계 15개

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    단독으로도 판매
  6. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  7. Retaining Wall

    SWMS · 작업 단계 19개

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    단독으로도 판매
  8. Roof Edge Protection

    SWMS · 작업 단계 16개

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    단독으로도 판매
  9. Garage Door Installation

    SWMS · 작업 단계 14개

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    단독으로도 판매
  10. Insulation - Batts Installation

    SWMS · 작업 단계 12개

    SWMS for installing insulation batts in ceilings and walls: planning, delivery, ceiling space access, electricity, falls, asbestos, heat stress and fire.

    단독으로도 판매
  11. Erecting Fixed Scaffold

    SWMS · 작업 단계 14개

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    단독으로도 판매
  12. Plumbing Drainage

    SWMS · 작업 단계 18개

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    단독으로도 판매
  13. Final Building Clean Before Handover to Client

    SWMS · 작업 단계 10개

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    단독으로도 판매
  14. Rough-in Final Fit-out Plumbing

    SWMS · 작업 단계 18개

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    단독으로도 판매
  15. Timber Floor Laying

    SWMS · 작업 단계 13개

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    단독으로도 판매
  16. Skip Bin

    SWMS · 작업 단계 11개

    Skip Bin SWMS: eleven job steps for skip bin delivery and pick-up with a truck-mounted skip lifter, from travel and set-up to emergency response.

    단독으로도 판매
  17. Concrete Boom or Line Pumping

    SWMS · 작업 단계 15개

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    단독으로도 판매
  18. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 작업 단계 8개

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    단독으로도 판매
  19. Construction Labourer

    SWMS · 작업 단계 16개

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    단독으로도 판매
  20. Temporary Fencing

    SWMS · 작업 단계 11개

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    단독으로도 판매
  21. Plasterboard

    SWMS · 작업 단계 16개

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    단독으로도 판매
  22. Decking

    SWMS · 작업 단계 19개

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    단독으로도 판매
  23. Brick and Block Laying

    SWMS · 작업 단계 22개

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    단독으로도 판매
  24. Concrete Foundations Excavating - Pouring

    SWMS · 작업 단계 17개

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    단독으로도 판매
  25. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 작업 단계 12개

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    단독으로도 판매
  26. Fencing

    SWMS · 작업 단계 16개

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    단독으로도 판매
  27. Duct Work Installation

    SWMS · 작업 단계 11개

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    단독으로도 판매
  28. Working in Roof Spaces

    SWMS · 작업 단계 8개

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    단독으로도 판매
  29. Construction Site Visitor

    SWMS · 작업 단계 7개

    Construction Site Visitor SWMS: 7 job steps covering weather, site arrival, manual tasks, navigating the site and emergencies.

    단독으로도 판매
  30. Overhead Electric Lines - Working Near

    SWMS · 작업 단계 6개

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    단독으로도 판매
  31. Construction OHS/WHS Project Management Plan

    관리 계획서 · 섹션 28개

    A construction OHS/WHS site management plan covering site rules, risk management, contractors, incidents and the forms and registers a project needs.

    단독으로도 판매
  32. Earthmoving Equipment

    SWMS · 작업 단계 23개

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    단독으로도 판매
  33. Timber Floor Sanding and Finishing

    SWMS · 작업 단계 14개

    SWMS for sanding indoor timber floors and applying varnish or similar coatings: set-up, tools, dust, chemicals, refuelling and emergencies.

    단독으로도 판매
  34. Cladding

    SWMS · 작업 단계 12개

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    단독으로도 판매
  35. Cabinet Installation

    SWMS · 작업 단계 12개

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    단독으로도 판매
  36. Air Conditioning Installation

    SWMS · 작업 단계 16개

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    단독으로도 판매
  37. Dogman

    SWMS · 작업 단계 12개

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    단독으로도 판매
  38. Rendering

    SWMS · 작업 단계 14개

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    단독으로도 판매
  39. Electrical New Installation

    SWMS · 작업 단계 20개

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    단독으로도 판매
  40. Powered Non-powered Tools

    SWMS · 작업 단계 12개

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    단독으로도 판매
  41. Plumbing Gas Fitting

    SWMS · 작업 단계 21개

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    단독으로도 판매
  42. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  43. Carpet Laying

    SWMS · 작업 단계 14개

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    단독으로도 판매
  44. Tiling

    SWMS · 작업 단계 14개

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    단독으로도 판매
  45. Awnings Blinds Curtains Installation

    SWMS · 작업 단계 14개

    SWMS for installing awnings, blinds and curtains: site set-up, tools, working at height on ladders and trestles, drilling brackets, mounting and emergencies.

    단독으로도 판매
  46. Excavation Near Assets

    SWMS · 작업 단계 13개

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    단독으로도 판매
  47. Plumbing - Water Meter Installation

    SWMS · 작업 단계 16개

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    단독으로도 판매
  48. Concrete Slab on Ground

    SWMS · 작업 단계 17개

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    단독으로도 판매
  49. Waterproofing

    SWMS · 작업 단계 12개

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    단독으로도 판매
  50. Floating Floor Laying

    SWMS · 작업 단계 14개

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    단독으로도 판매
  51. Aluminium Window Door Frame Installation

    SWMS · 작업 단계 15개

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    단독으로도 판매
  52. Framing and Trusses - Timber-Steel

    SWMS · 작업 단계 15개

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    단독으로도 판매
  53. Site Establishment

    SWMS · 작업 단계 11개

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    단독으로도 판매
  54. Port-a-loo Service

    SWMS · 작업 단계 8개

    Covers servicing a port-a-loo: cleaning, pump-out of the sewage tank and adding deodorising chemicals, with the hazards and controls for each job step.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Height Access Equipment17$89.95 · 1크레딧
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1크레딧
Painting and Decorating15$89.95 · 1크레딧
Roof Work14$89.95 · 1크레딧
Glazing15$89.95 · 1크레딧
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Retaining Wall19$89.95 · 1크레딧
Roof Edge Protection16$89.95 · 1크레딧
Garage Door Installation14$89.95 · 1크레딧
Insulation - Batts Installation12$89.95 · 1크레딧
Erecting Fixed Scaffold14$89.95 · 1크레딧
Plumbing Drainage18$89.95 · 1크레딧
Final Building Clean Before Handover to Client10$89.95 · 1크레딧
Rough-in Final Fit-out Plumbing18$89.95 · 1크레딧
Timber Floor Laying13$89.95 · 1크레딧
Skip Bin11$89.95 · 1크레딧
Concrete Boom or Line Pumping15$89.95 · 1크레딧
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1크레딧
Construction Labourer16$89.95 · 1크레딧
Temporary Fencing11$89.95 · 1크레딧
Plasterboard16$89.95 · 1크레딧
Decking19$89.95 · 1크레딧
Brick and Block Laying22$89.95 · 1크레딧
Concrete Foundations Excavating - Pouring17$89.95 · 1크레딧
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1크레딧
Fencing16$89.95 · 1크레딧
Duct Work Installation11$89.95 · 1크레딧
Working in Roof Spaces8$89.95 · 1크레딧
Construction Site Visitor7$89.95 · 1크레딧
Overhead Electric Lines - Working Near6$89.95 · 1크레딧
Construction OHS/WHS Project Management Plan0$89.95 · 1크레딧
Earthmoving Equipment23$89.95 · 1크레딧
Timber Floor Sanding and Finishing14$89.95 · 1크레딧
Cladding12$89.95 · 1크레딧
Cabinet Installation12$89.95 · 1크레딧
Air Conditioning Installation16$89.95 · 1크레딧
Dogman12$89.95 · 1크레딧
Rendering14$89.95 · 1크레딧
Electrical New Installation20$89.95 · 1크레딧
Powered Non-powered Tools12$89.95 · 1크레딧
Plumbing Gas Fitting21$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Carpet Laying14$89.95 · 1크레딧
Tiling14$89.95 · 1크레딧
Awnings Blinds Curtains Installation14$89.95 · 1크레딧
Excavation Near Assets13$89.95 · 1크레딧
Plumbing - Water Meter Installation16$89.95 · 1크레딧
Concrete Slab on Ground17$89.95 · 1크레딧
Waterproofing12$89.95 · 1크레딧
Floating Floor Laying14$89.95 · 1크레딧
Aluminium Window Door Frame Installation15$89.95 · 1크레딧
Framing and Trusses - Timber-Steel15$89.95 · 1크레딧
Site Establishment11$89.95 · 1크레딧
Port-a-loo Service8$89.95 · 1크레딧
하나씩 구매 시$4,857.30 · 54크레딧
이 팩으로 구매 시$2,518.60 · 28크레딧 $2,338.70 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.