얼리 액세스 혜택:얼리 액세스: 30% 할인, 구독을 유지하는 동안 계속.

혜택 받기

템플릿 문서는 영어로 작성되어 있습니다.

에디터 무료로 써 보기
알뜰 팩 · 템플릿 46개

Civil Water and Sewerage Systems Combo

알뜰 팩 · PACK-50333

Civil Water and Sewerage Systems Combo 알뜰 팩 템플릿 미리보기
  • 템플릿 46개
  • 31 가격에 46개
  • 라이브러리 폴더 하나에 모두 담겨 제공

A set of 32 SWMS and 14 SOPs for civil contractors building water and sewerage systems.

The SWMS cover trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation. The SOPs include Grader, Front-end Loader and Plant Attachment Maintenance.

Each document is the same one sold on its own, so you get every update to it. Together they cost 31 template credits instead of 46.

Driver Posture & Responsibilities SOP 미리 보기

Driver Posture & Responsibilities

SOPVersion 4

Acronyms

  • PPE - Personal Protective Equipment

  • SOP - Safe Operating Procedure

섹션 8개 더

  1. Hazards
  2. Pre-operational inspection
  3. Precautions
  4. Driver responsibility
  5. Vehicle ergonomic principles
  6. 외 3개

전체 내용이 작성되어 있어 사업장 정보만 넣으면 됩니다.

미리 보기 방식

브라우저에서 보이는 모습

이 알뜰 팩 받기

무료로 가입한 뒤 받는 방법을 선택하세요. 모든 문서가 팩 이름으로 된 폴더에 담겨 라이브러리에 들어갑니다.

  • 유료 요금제에 포함

    요금제의 템플릿 크레딧을 사용하세요. 이 팩은 46 대신 31입니다.

    요금제와 가격 비교
  • 한 번 구매하기

    $2,788.45 $4,137.70 한 번 결제로 계속 소유합니다. 무료 요금제에서도 사용할 수 있습니다.

가입에 카드가 필요 없습니다. 얼리 액세스 회원은 모든 요금제에서 30% 할인을 받습니다.

포함 내용

  1. Driver Posture & Responsibilities

    SOP · 섹션 9개

    Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.

    단독으로도 판매
  2. Soil Testing

    SWMS · 작업 단계 11개

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    단독으로도 판매
  3. Pipeline Disinfecting

    SWMS · 작업 단계 12개

    SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.

    단독으로도 판매
  4. Vehicle Mounted Borehole Drilling

    SWMS · 작업 단계 14개

    Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.

    단독으로도 판매
  5. Mobile Plant Working Near-Around

    SWMS · 작업 단계 8개

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    단독으로도 판매
  6. Handheld Power Tools

    SOP · 섹션 9개

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    단독으로도 판매
  7. Spotter

    SWMS · 작업 단계 11개

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    단독으로도 판매
  8. Bulk Excavations

    SWMS · 작업 단계 13개

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    단독으로도 판매
  9. Trench Excavation

    SWMS · 작업 단계 15개

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    단독으로도 판매
  10. Grader

    SOP · 섹션 7개

    Safe operating procedure for a grader: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    단독으로도 판매
  11. Plumbing Drainage

    SWMS · 작업 단계 18개

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    단독으로도 판매
  12. Mobile Crane

    SWMS · 작업 단계 16개

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    단독으로도 판매
  13. Front-end Loader

    SOP · 섹션 7개

    Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.

    단독으로도 판매
  14. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 작업 단계 8개

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    단독으로도 판매
  15. Plant Attachment Maintenance

    SOP · 섹션 10개

    Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.

    단독으로도 판매
  16. Tipper and Dog

    SWMS · 작업 단계 16개

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    단독으로도 판매
  17. Culvert-Tank Installation

    SWMS · 작업 단계 12개

    Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.

    단독으로도 판매
  18. Manual Handling

    SOP · 섹션 5개

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    단독으로도 판매
  19. Confined Space Work

    SWMS · 작업 단계 10개

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    단독으로도 판매
  20. Lasers

    SWMS · 작업 단계 9개

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    단독으로도 판매
  21. Sediment Fencing

    SWMS · 작업 단계 18개

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    단독으로도 판매
  22. Guided Boring Pipe Jacking Works

    SWMS · 작업 단계 17개

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    단독으로도 판매
  23. Silica Dust

    SWMS · 작업 단계 14개

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    단독으로도 판매
  24. Backhoe Loader

    SOP · 섹션 9개

    A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.

    단독으로도 판매
  25. Construction Night Works

    SWMS · 작업 단계 4개

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    단독으로도 판매
  26. Hand Tools

    SOP · 섹션 9개

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    단독으로도 판매
  27. Overhead Electric Lines - Working Near

    SWMS · 작업 단계 6개

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    단독으로도 판매
  28. Asphalt Patcher

    SOP · 섹션 7개

    Safe operating procedure for an asphalt patcher: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    단독으로도 판매
  29. Earthmoving Equipment

    SWMS · 작업 단계 23개

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    단독으로도 판매
  30. Falls from Heavy Vehicles

    SOP · 섹션 7개

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    단독으로도 판매
  31. Nuclear Densometer

    SWMS · 작업 단계 12개

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    단독으로도 판매
  32. Outdoor Work

    SOP · 섹션 11개

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    단독으로도 판매
  33. Dogman

    SWMS · 작업 단계 12개

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    단독으로도 판매
  34. Skid Steer

    SOP · 섹션 9개

    Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.

    단독으로도 판매
  35. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 작업 단계 11개

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    단독으로도 판매
  36. Manual Handling

    SWMS · 작업 단계 18개

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    단독으로도 판매
  37. Excavator

    SOP · 섹션 9개

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    단독으로도 판매
  38. Horizontal Directional Boring

    SWMS · 작업 단계 16개

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    단독으로도 판매
  39. Excavation Near Assets

    SWMS · 작업 단계 13개

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    단독으로도 판매
  40. Roller

    SOP · 섹션 8개

    Safe operating procedure for a roller: hazards, PPE, precautions, transporting, maintenance, step-by-step operation and a hazard checklist.

    단독으로도 판매
  41. Plumbing - Water Meter Installation

    SWMS · 작업 단계 16개

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    단독으로도 판매
  42. Geofabric Installation

    SWMS · 작업 단계 17개

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    단독으로도 판매
  43. Light Vehicle on Construction

    SWMS · 작업 단계 16개

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    단독으로도 판매
  44. Soil Compactor

    SWMS · 작업 단계 19개

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    단독으로도 판매
  45. Site Establishment

    SWMS · 작업 단계 11개

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    단독으로도 판매
  46. Remote Control Trench Roller

    SWMS · 작업 단계 15개

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    단독으로도 판매

다루는 내용

다루는 위험 요소

참조하는 법령 및 표준

모든 SWMS에는 관련 법령 및 실무 규정(code of practice) 참조 목록이 포함됩니다.

절약 금액

템플릿작업 단계단독 구매
Driver Posture & Responsibilities0$89.95 · 1크레딧
Soil Testing11$89.95 · 1크레딧
Pipeline Disinfecting12$89.95 · 1크레딧
Vehicle Mounted Borehole Drilling14$89.95 · 1크레딧
Mobile Plant Working Near-Around8$89.95 · 1크레딧
Handheld Power Tools0$89.95 · 1크레딧
Spotter11$89.95 · 1크레딧
Bulk Excavations13$89.95 · 1크레딧
Trench Excavation15$89.95 · 1크레딧
Grader0$89.95 · 1크레딧
Plumbing Drainage18$89.95 · 1크레딧
Mobile Crane16$89.95 · 1크레딧
Front-end Loader0$89.95 · 1크레딧
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1크레딧
Plant Attachment Maintenance0$89.95 · 1크레딧
Tipper and Dog16$89.95 · 1크레딧
Culvert-Tank Installation12$89.95 · 1크레딧
Manual Handling0$89.95 · 1크레딧
Confined Space Work10$89.95 · 1크레딧
Lasers9$89.95 · 1크레딧
Sediment Fencing18$89.95 · 1크레딧
Guided Boring Pipe Jacking Works17$89.95 · 1크레딧
Silica Dust14$89.95 · 1크레딧
Backhoe Loader0$89.95 · 1크레딧
Construction Night Works4$89.95 · 1크레딧
Hand Tools0$89.95 · 1크레딧
Overhead Electric Lines - Working Near6$89.95 · 1크레딧
Asphalt Patcher0$89.95 · 1크레딧
Earthmoving Equipment23$89.95 · 1크레딧
Falls from Heavy Vehicles0$89.95 · 1크레딧
Nuclear Densometer12$89.95 · 1크레딧
Outdoor Work0$89.95 · 1크레딧
Dogman12$89.95 · 1크레딧
Skid Steer0$89.95 · 1크레딧
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1크레딧
Manual Handling18$89.95 · 1크레딧
Excavator0$89.95 · 1크레딧
Horizontal Directional Boring16$89.95 · 1크레딧
Excavation Near Assets13$89.95 · 1크레딧
Roller0$89.95 · 1크레딧
Plumbing - Water Meter Installation16$89.95 · 1크레딧
Geofabric Installation17$89.95 · 1크레딧
Light Vehicle on Construction16$89.95 · 1크레딧
Soil Compactor19$89.95 · 1크레딧
Site Establishment11$89.95 · 1크레딧
Remote Control Trench Roller15$89.95 · 1크레딧
하나씩 구매 시$4,137.70 · 46크레딧
이 팩으로 구매 시$2,788.45 · 31크레딧 $1,349.25 절약

리뷰

아직 리뷰가 없습니다.

템플릿 이용 방법

먼저 써 보고 결제하세요.

  1. 무료 미리 보기

    모든 템플릿의 작업 단계, 위험 요소, 첫 번째 작업 내용을 자유롭게 볼 수 있습니다. 가입이 필요 없습니다.

  2. 에디터 써 보기

    컴퓨터나 휴대폰에서 데모 SWMS에 회사, 작업, 현장 정보를 넣어 보세요.

  3. 무료 가입

    입력한 정보와 로고가 그대로 옮겨집니다. 이 템플릿이 정보가 채워진 상태로 열립니다.

  4. 크레딧 사용 또는 한 번 구매

    유료 요금제에는 매달 템플릿 크레딧이 포함됩니다. 또는 이 템플릿만 구매해 계속 소유하세요.