A set of 19 SWMS for electricians: switchboard installation, cable ladder, tray and conduit, electrical renovations, appliance and equipment repair, trenching and confined spaces.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 13 template credits instead of 19.

Height Access Equipment SWMS 预览

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 16 个工作步骤,从“Work area set-up”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 13 个额度,而不是 19 个。

    比较套餐和价格
  • 单独购买

    $1,169.35 $1,709.05 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Height Access Equipment

    SWMS · 17 个工作步骤

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    也可单独购买
  2. Switchboard Installation

    SWMS · 14 个工作步骤

    SWMS for installing switchboards, covering energised electrical work, arc flash, silica and asbestos controls, ladders and emergency response.

    也可单独购买
  3. Asbestos Awareness

    SWMS · 4 个工作步骤

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    也可单独购买
  4. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  5. Cable Ladder Tray-Conduit Installation

    SWMS · 12 个工作步骤

    Cable ladder, tray and conduit installation SWMS: 12 job steps covering services, ladders and scaffold, tools, silica dust, hot work and emergencies.

    也可单独购买
  6. Electrical Renovations

    SWMS · 20 个工作步骤

    Electrical Renovations SWMS: 20 job steps covering power isolation, switchboards, rough-in, fitting appliances, commissioning and emergencies.

    也可单独购买
  7. Trench Excavation

    SWMS · 15 个工作步骤

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    也可单独购买
  8. Appliances-Equipment Electrical Repair

    SWMS · 14 个工作步骤

    Appliances-Equipment Electrical Repair SWMS: 14 job steps for de-energised repair of appliances and equipment, from LOTO and hot work to testing and return to service.

    也可单独购买
  9. Confined Space Work

    SWMS · 10 个工作步骤

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    也可单独购买
  10. Risers Working In

    SWMS · 12 个工作步骤

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    也可单独购买
  11. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  12. Silica Dust

    SWMS · 14 个工作步骤

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    也可单独购买
  13. Working in Roof Spaces

    SWMS · 8 个工作步骤

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    也可单独购买
  14. Electrical New Installation

    SWMS · 20 个工作步骤

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    也可单独购买
  15. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  16. Cable Hauling

    SWMS · 16 个工作步骤

    A SWMS for cable hauling near roads and in pits or manholes: the hazards and controls from training and planning to pulling cable and emergency response.

    也可单独购买
  17. Electrical Temporary Connections

    SWMS · 14 个工作步骤

    Electrical Temporary Connections SWMS: 14 job steps from silica training and set-up to live electrical work, leads and emergency response.

    也可单独购买
  18. Low Voltage Electrical Repairs and Installations

    SWMS · 20 个工作步骤

    SWMS for low voltage electrical repairs, maintenance and installations, including isolation, working near live parts, testing and appliances.

    也可单独购买
  19. Electrical Demolition

    SWMS · 13 个工作步骤

    Electrical Demolition SWMS: 13 job steps covering power shutdown, removing fixtures and cabling, asbestos, ceiling spaces and working at height.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Height Access Equipment17$89.95 · 1 个额度
Switchboard Installation14$89.95 · 1 个额度
Asbestos Awareness4$89.95 · 1 个额度
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Cable Ladder Tray-Conduit Installation12$89.95 · 1 个额度
Electrical Renovations20$89.95 · 1 个额度
Trench Excavation15$89.95 · 1 个额度
Appliances-Equipment Electrical Repair14$89.95 · 1 个额度
Confined Space Work10$89.95 · 1 个额度
Risers Working In12$89.95 · 1 个额度
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Silica Dust14$89.95 · 1 个额度
Working in Roof Spaces8$89.95 · 1 个额度
Electrical New Installation20$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Cable Hauling16$89.95 · 1 个额度
Electrical Temporary Connections14$89.95 · 1 个额度
Low Voltage Electrical Repairs and Installations20$89.95 · 1 个额度
Electrical Demolition13$89.95 · 1 个额度
逐个购买$1,709.05 · 19 个额度
在本套装中$1,169.35 · 13 个额度 节省 $539.70

评价

  • Documents are thoroughly detailed and clear to read. The only downfall is the inability to set the company and project details as the header and then copy/paste this throughout the entire list - in our case, roughly 20 SWMS. This is a little time consuming and creates a chance for human error.

    Xavier Waters已验证购买

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。