抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 37 个模板

Landscaping Combo

超值套装 · PACK-50343

Landscaping Combo 超值套装模板预览
  • 37 个模板
  • 37 份,只需 27 的价钱
  • 全部放入一个模板库文件夹

A set of 22 SWMS and 15 SOPs for landscaping contractors.

The SWMS cover retaining walls, paving, decking, turf laying, tree felling and fencing. The SOPs include Lawn Mower, Brush Cutter and Chain Saw.

Each document is the same one sold on its own, so you get every update to it. Together they cost 27 template credits instead of 37.

Mobile Plant Working Near-Around SWMS 预览

Mobile Plant Working Near-Around

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Undertake a site-specific induction, including training in communication with plant operators:

        • Groundworkers instructed on:

          • The UHF channel to communicate with plant operators

          • Not to approach mobile plant until the operator has agreed to their request to approach

          • On set distances to maintain from the mobile plant while in operation

          • Groundworkers and mobile plant operators are aware of any traffic management plan and no go zones

          • Are made familiar with the blind spots of the mobile plant

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 7 个工作步骤,从“Housekeeping”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 27 个额度,而不是 37 个。

    比较套餐和价格
  • 单独购买

    $2,428.65 $3,328.15 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  2. Retaining Wall

    SWMS · 19 个工作步骤

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    也可单独购买
  3. Lawn Mower

    SOP · 11 个章节

    Safe operating procedure for a lawn mower: hazards, PPE, precautions, inspection, operation, fuelling, maintenance and a hazard checklist.

    也可单独购买
  4. Handheld Power Tools

    SOP · 9 个章节

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    也可单独购买
  5. Brush Cutter

    SOP · 8 个章节

    Safe operating procedure for a brush cutter: hazards, PPE, training, inspection, operation, fuelling, maintenance and a hazard checklist.

    也可单独购买
  6. Chain Saw

    SOP · 9 个章节

    Safe operating procedure for a chain saw: hazards, PPE, training, pre-operational inspection, operation, maintenance, first aid and a hazard checklist.

    也可单独购买
  7. Tree Felling - Manual

    SWMS · 15 个工作步骤

    SWMS for manual tree felling: training, power line permits, traffic, chainsaw use, cross-cutting, moving felled trees, fuelling and emergencies.

    也可单独购买
  8. Ride-On Mower

    SOP · 11 个章节

    Safe operating procedure for a ride-on mower: hazards, PPE, pre-operational inspection, startup and mowing steps, fuelling and a hazard checklist.

    也可单独购买
  9. Landscape Planting

    SWMS · 18 个工作步骤

    SWMS for landscape planting on roadsides and public sites: traffic, mobile plant, tools, soil and mulch, slopes, weather and emergencies.

    也可单独购买
  10. Tipper and Dog

    SWMS · 16 个工作步骤

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    也可单独购买
  11. Manual Handling

    SOP · 5 个章节

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    也可单独购买
  12. Paving

    SWMS · 19 个工作步骤

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    也可单独购买
  13. Decking

    SWMS · 19 个工作步骤

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    也可单独购买
  14. Lawn Edger

    SOP · 11 个章节

    Safe operating procedure for a lawn edger: hazards, PPE, pre-operational inspection, training, operation, fuelling, maintenance and a hazard checklist.

    也可单独购买
  15. Turf Laying

    SWMS · 13 个工作步骤

    Turf Laying SWMS: thirteen job steps covering the hazards and controls for preparing the site and laying turf, from delivery to emergency response.

    也可单独购买
  16. Lasers

    SWMS · 9 个工作步骤

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    也可单独购买
  17. Pole Pruner Saw

    SOP · 8 个章节

    Safe operating procedure for a pole pruner saw: hazards, PPE, precautions, pre-operational inspection, operation, fuelling and a hazard checklist.

    也可单独购买
  18. Bark Blower Truck

    SWMS · 13 个工作步骤

    SWMS for bark blower truck work: trailer coupling, travel between sites, loading and spreading soil, mulch and bark, traffic, refuelling and emergencies.

    也可单独购买
  19. Leaf Blower

    SOP · 9 个章节

    Safe operating procedure for a leaf blower: hazards, PPE, training, inspection, operation, fuelling, maintenance and a hazard checklist.

    也可单独购买
  20. Bites and Stings Prevention and Treatment

    SWMS · 9 个工作步骤

    Bites and Stings SWMS: nine job steps covering snake, spider, bee, wasp, tick and mosquito bite prevention, first aid and emergency response outdoors.

    也可单独购买
  21. Fencing

    SWMS · 16 个工作步骤

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    也可单独购买
  22. Hand Tools

    SOP · 9 个章节

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    也可单独购买
  23. Earthmoving Equipment

    SWMS · 23 个工作步骤

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    也可单独购买
  24. Falls from Heavy Vehicles

    SOP · 7 个章节

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    也可单独购买
  25. Outdoor Work

    SOP · 11 个章节

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    也可单独购买
  26. Hedge Trimmer

    SOP · 11 个章节

    Safe operating procedure for hedge trimmers: hazards, PPE, inspection, operation, fuelling, maintenance, first aid and a hazard checklist.

    也可单独购买
  27. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  28. Wood Chipper

    SWMS · 14 个工作步骤

    Wood Chipper SWMS: fourteen job steps covering delivery, set-up, operation, refuelling and emergency response for roadside wood chipping.

    也可单独购买
  29. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  30. Excavator

    SOP · 9 个章节

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    也可单独购买
  31. Landscaping Irrigation

    SWMS · 15 个工作步骤

    SWMS for landscaping irrigation installation: trenching, excavation, pipework, controller wiring, services, site set-up and emergency response.

    也可单独购买
  32. Pressure Cleaner

    SOP · 9 个章节

    Safe operating procedure for a water pressure cleaner: hazards, PPE, precautions, inspection, set-up, operation, storage, maintenance and a hazard checklist.

    也可单独购买
  33. Concrete Slab on Ground

    SWMS · 17 个工作步骤

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    也可单独购买
  34. Water Features

    SWMS · 18 个工作步骤

    Water Features SWMS: 18 job steps for installing water features and garden ponds, from excavation and liners to pumps and emergency response.

    也可单独购买
  35. Stump Grinder

    SWMS · 14 个工作步骤

    SWMS for stump grinder work: delivery and coupling, traffic, set-up, operation, refuelling and emergency response.

    也可单独购买
  36. Soft-fall Surface Removal and Installation

    SWMS · 14 个工作步骤

    SWMS for removing and installing soft-fall surfacing: site set-up, removal, wet pour rubber mixing and laying, refuelling and emergencies.

    也可单独购买
  37. Synthetic Grass Laying

    SWMS · 17 个工作步骤

    Synthetic Grass Laying SWMS: 17 job steps from turf removal and subgrade preparation to grass laying, seaming, re-fuelling and emergencies.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Retaining Wall19$89.95 · 1 个额度
Lawn Mower0$89.95 · 1 个额度
Handheld Power Tools0$89.95 · 1 个额度
Brush Cutter0$89.95 · 1 个额度
Chain Saw0$89.95 · 1 个额度
Tree Felling - Manual15$89.95 · 1 个额度
Ride-On Mower0$89.95 · 1 个额度
Landscape Planting18$89.95 · 1 个额度
Tipper and Dog16$89.95 · 1 个额度
Manual Handling0$89.95 · 1 个额度
Paving19$89.95 · 1 个额度
Decking19$89.95 · 1 个额度
Lawn Edger0$89.95 · 1 个额度
Turf Laying13$89.95 · 1 个额度
Lasers9$89.95 · 1 个额度
Pole Pruner Saw0$89.95 · 1 个额度
Bark Blower Truck13$89.95 · 1 个额度
Leaf Blower0$89.95 · 1 个额度
Bites and Stings Prevention and Treatment9$89.95 · 1 个额度
Fencing16$89.95 · 1 个额度
Hand Tools0$89.95 · 1 个额度
Earthmoving Equipment23$89.95 · 1 个额度
Falls from Heavy Vehicles0$89.95 · 1 个额度
Outdoor Work0$89.95 · 1 个额度
Hedge Trimmer0$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Wood Chipper14$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Excavator0$89.95 · 1 个额度
Landscaping Irrigation15$89.95 · 1 个额度
Pressure Cleaner0$89.95 · 1 个额度
Concrete Slab on Ground17$89.95 · 1 个额度
Water Features18$89.95 · 1 个额度
Stump Grinder14$89.95 · 1 个额度
Soft-fall Surface Removal and Installation14$89.95 · 1 个额度
Synthetic Grass Laying17$89.95 · 1 个额度
逐个购买$3,328.15 · 37 个额度
在本套装中$2,428.65 · 27 个额度 节省 $899.50

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。