抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 12 个模板

Shed Construction

超值套装 · PACK-50076

Shed Construction 超值套装模板预览
  • 12 个模板
  • 12 份,只需 9 的价钱
  • 全部放入一个模板库文件夹

A set of 12 SWMS for shed builders and steel frame erectors: mobile cranes, concrete slabs, framing and trusses, roof sheeting, garage doors and window and door frames.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost nine template credits instead of 12.

Mobile Plant Working Near-Around SWMS 预览

Mobile Plant Working Near-Around

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Undertake a site-specific induction, including training in communication with plant operators:

        • Groundworkers instructed on:

          • The UHF channel to communicate with plant operators

          • Not to approach mobile plant until the operator has agreed to their request to approach

          • On set distances to maintain from the mobile plant while in operation

          • Groundworkers and mobile plant operators are aware of any traffic management plan and no go zones

          • Are made familiar with the blind spots of the mobile plant

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures unanticipated hazards.

      After controls2 Moderate
      Responsible
      • Supervisorto check the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 7 个工作步骤,从“Housekeeping”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 9 个额度,而不是 12 个。

    比较套餐和价格
  • 单独购买

    $809.55 $1,079.40 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  2. Garage Door Installation

    SWMS · 14 个工作步骤

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    也可单独购买
  3. Mobile Crane

    SWMS · 16 个工作步骤

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    也可单独购买
  4. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  5. Electrical New Installation

    SWMS · 20 个工作步骤

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    也可单独购买
  6. Concrete Sawing and Core Drilling

    SWMS · 13 个工作步骤

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    也可单独购买
  7. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  8. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  9. Concrete Slab on Ground

    SWMS · 17 个工作步骤

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    也可单独购买
  10. Roofing Sheeting

    SWMS · 14 个工作步骤

    A Roofing Sheeting SWMS covering the hazards and controls for installing a corrugated iron roof and fixing and dismantling roof edge protection.

    也可单独购买
  11. Aluminium Window Door Frame Installation

    SWMS · 15 个工作步骤

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    也可单独购买
  12. Framing and Trusses - Timber-Steel

    SWMS · 15 个工作步骤

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Garage Door Installation14$89.95 · 1 个额度
Mobile Crane16$89.95 · 1 个额度
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Electrical New Installation20$89.95 · 1 个额度
Concrete Sawing and Core Drilling13$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Concrete Slab on Ground17$89.95 · 1 个额度
Roofing Sheeting14$89.95 · 1 个额度
Aluminium Window Door Frame Installation15$89.95 · 1 个额度
Framing and Trusses - Timber-Steel15$89.95 · 1 个额度
逐个购买$1,079.40 · 12 个额度
在本套装中$809.55 · 9 个额度 节省 $269.85

评价

  • Good product

    Mick Muir已验证购买

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。