Timber Floor Laying

SWMS · SWMS-10182

  • 13 job steps
  • Version 7

This SWMS covers the hazards and controls for installing timber flooring, from out-of-hours work, working alone and arriving on site to laying plywood underlay and timber boards, using adhesives, completion and emergency response.

It takes your crew through each job step with its hazards and controls, including materials delivery by truck, power tool and nail gun use, silica and wood dust, and housekeeping.

It suits construction managers, site supervisors, installation teams and safety officers working in the construction industry.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

See its own page

Preview of the Timber Floor Laying SWMS

Timber Floor Laying

SWMSVersion 7
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Out-of-hours / night work

    • Hazard

      Fatigue; Unauthorised access

      Before controls3 High
      Controls
      • Allow adequate meal breaks for workers; particularly if they have worked during part of the day, Allow time to rest & recover sufficiently to work safely into the evening/night

      • Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents

      • Workers have access to:

        • Suitable amenities (toilets/wash facilities/drinking water)

        • Sufficient lighting (including parking areas)

        • Air conditioning and heating

        • Mechanical ventilation if required

        • Emergency exits

        • Safe area for parking/unloading equipment – protected from rain

      • Additional security personnel on-site to ensure no unauthorised access by the general public while work is being performed

      • Ensure that adequate lighting is available

      • No worker should work alone on the site at night.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

12 more job steps, from Working alone to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 8 instead of 10.

    Compare plans and prices
  • Buy it once

    $719.60 $899.50 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

13 job steps

  1. Out-of-hours / night workManage fatigue and keep the site secure during out-of-hours work
  2. Working aloneUse a buddy system and agreed call-ins when working alone
  3. Arrival on-site & assess onsite conditionsPark safely, report in and assess the site on arrival
  4. Work area set-upSet up an exclusion zone, protect the public and handle materials safely
  5. Materials delivery by truckFollow the traffic plan and keep clear of reversing trucks when unloading
  6. EnvironmentControl noise, dust, waste, chemicals and vehicle movement
  7. House keepingKeep the work area clean and clear of trip hazards
  8. Working with powered & non-powered toolsInspect and use tools safely on RCD-protected power
  9. Cutting & laying underlayCut underlay safely with sharp retractable knives
  10. Laying plywood underlay & timber boardsLay ply and boards while controlling trips, dust, silica, saw cuts and nail gun use
  11. Using adhesivesUse adhesives as the SDS directs and contain spills
  12. On completionRemove barricades, pack up leads, clean up silica and sign out
  13. Emergency responseCall 000, follow emergency procedures and give first aid

Hazards it covers

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.