Smoke Alarm Testing - Installation

SWMS · SWMS-10433

  • 16 job steps
  • Version 4
  • Fire Services
  • Reads on any phone

This SWMS covers the hazards and controls for installing hard-wired smoke alarms and for servicing and testing alarms already in place.

It takes your crew through each job step, from training, arrival on site and work area set-up to locating and isolating services, working on ladders and in ceiling spaces, running cables, mounting, testing and commissioning, servicing, completion and emergency response.

It suits electricians, safety officers and construction workers who install and maintain hard-wired smoke alarm systems, and the project managers and supervisors who oversee them.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

Preview of the Smoke Alarm Testing - Installation SWMS

Smoke Alarm Testing - Installation

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Business contact phone
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas Mains
  • Hazardous Lines
  • Energised Electrical
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor
    • Hazard

      Electrocution

      Before controls4 Acute
      Controls
      • All workers who work on or near electrical mains and apparatus must be trained and appropriately qualified with correct licence endorsements for the task

      • Only licensed electricians to install 240 V hard-wired systems

      • During the previous 12 months (where it is relevant to the work), all workers must have demonstrated competence in:

        • Approved procedures for release, rescue and resuscitation

        • Requirements of the Electrical Safety Rules.

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

15 more job steps, from Arrival on-site to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this template

Sign up free, then choose how you'd like it. Your company details fill in for you.

  • Included in paid plans

    Use template credits from your plan. This one costs 1.

    Compare plans and prices
  • Buy it once

    $89.95 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

16 job steps

  1. TrainingTrain workers on silica and electrical safety
  2. Arrival on-siteEnter the site safely and assess its hazards
  3. Work area set-upSet up an exclusion zone around the work area
  4. Locate & isolate existing servicesLocate and isolate existing services
  5. EnvironmentManage waste and protect the environment
  6. House keepingKeep the work area clean and tidy
  7. Manual tasksLift and handle loads safely
  8. Working with powered & non-powered toolsUse powered and non-powered tools safely
  9. Working at height on laddersUse ladders safely
  10. Working in ceiling spaces and utility areasWork safely in ceiling spaces and utility areas
  11. Running cables/setting up equipmentRun cables and set up equipment safely
  12. Mounting & installing components into positionMount and install components safely
  13. Test & commissionTest and commission the installed equipment
  14. Servicing/ maintenance/ testingService, maintain and test smoke alarms
  15. On completionClean up and secure the site on completion
  16. Emergency responseRespond to emergencies

Hazards it covers

Reviews

No reviews yet.

See all

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.