Oferta de acceso anticipado:Acceso anticipado: 30% de descuento, mientras sigas suscrito.

Aprovechar la oferta

Las plantillas están escritas en inglés.

Prueba el editor gratis
Paquete ahorro · 32 plantillas

Civil Water and Sewerage Systems

Paquete ahorro · PACK-50318

Vista previa de la plantilla Paquete ahorro Civil Water and Sewerage Systems
  • 32 plantillas
  • 32 por el precio de 21
  • Llega en una carpeta de la Biblioteca

A set of 32 SWMS for civil contractors building water and sewerage systems: trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 21 template credits instead of 32.

Vista previa de SWMS Soil Testing

Soil Testing

SWMSVersion 1
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following 'High-Risk Construction Work' (HRCW – identified in the Job Task column)

  • Mobile PlantMobile plant movement
  • Traffic CorridorsWork carried out adjacent to a road, railway or shipping lane, traffic corridor

Planning and preparation

Planning/preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. Specify?

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Planning

    • Hazard

      Remote area emergency

      Before controls4 Acute
      Controls
      • Prepare a Remote / Isolated Work Plan. A signed copy must be taken by workers to the Remote/Isolated workplace each day, and the responsible supervisor must keep a copy at home base or head office

      • All relevant workers scheduled to work in the remote area are supplied with Personal Location Beacons (PLB)

      • All vehicles used to transport crew to remote locations are carrying Emergency Position Indicating Radio Beacon (EPIRB) onboard vehicle:

        • Cabin roof is marked with a specific identification number (for aerial identification.)

      • Complete a Departure Checklist (refer to Remote / Isolated Work Plan).

      After controls2 Moderate
      Responsible
      • The Organisationwill ensure 'Remote and Isolated Plan' is in place & check the site amenities are in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

10 pasos más del trabajo, de Travel to/from remote worksite a Emergency response

Cada uno con sus peligros, niveles de riesgo y controles, además de las firmas de tu equipo.

Ver como

Cómo se ve en un navegador

Consigue este paquete ahorro

Regístrate gratis y luego elige cómo lo quieres. Cada documento va a tu Biblioteca, en una carpeta con el nombre del paquete.

  • Incluido en los planes de pago

    Usa créditos de plantilla de tu plan. Este paquete cuesta 21 en vez de 32.

    Comparar planes y precios
  • Cómprala una sola vez

    $1,888.95 $2,878.40 pago único, y es tuya para siempre. También sirve con el plan Gratis.

No necesitas tarjeta para registrarte. Los miembros con acceso anticipado tienen un 30% de descuento en cualquier plan.

Qué incluye

  1. Soil Testing

    SWMS · 11 pasos del trabajo

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    También se vende por separado
  2. Pipeline Disinfecting

    SWMS · 12 pasos del trabajo

    SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.

    También se vende por separado
  3. Vehicle Mounted Borehole Drilling

    SWMS · 14 pasos del trabajo

    Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.

    También se vende por separado
  4. Mobile Plant Working Near-Around

    SWMS · 8 pasos del trabajo

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    También se vende por separado
  5. Spotter

    SWMS · 11 pasos del trabajo

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    También se vende por separado
  6. Bulk Excavations

    SWMS · 13 pasos del trabajo

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    También se vende por separado
  7. Trench Excavation

    SWMS · 15 pasos del trabajo

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    También se vende por separado
  8. Plumbing Drainage

    SWMS · 18 pasos del trabajo

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    También se vende por separado
  9. Mobile Crane

    SWMS · 16 pasos del trabajo

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    También se vende por separado
  10. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 pasos del trabajo

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    También se vende por separado
  11. Tipper and Dog

    SWMS · 16 pasos del trabajo

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    También se vende por separado
  12. Culvert-Tank Installation

    SWMS · 12 pasos del trabajo

    Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.

    También se vende por separado
  13. Confined Space Work

    SWMS · 10 pasos del trabajo

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    También se vende por separado
  14. Lasers

    SWMS · 9 pasos del trabajo

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    También se vende por separado
  15. Sediment Fencing

    SWMS · 18 pasos del trabajo

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    También se vende por separado
  16. Guided Boring Pipe Jacking Works

    SWMS · 17 pasos del trabajo

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    También se vende por separado
  17. Silica Dust

    SWMS · 14 pasos del trabajo

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    También se vende por separado
  18. Construction Night Works

    SWMS · 4 pasos del trabajo

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    También se vende por separado
  19. Overhead Electric Lines - Working Near

    SWMS · 6 pasos del trabajo

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    También se vende por separado
  20. Earthmoving Equipment

    SWMS · 23 pasos del trabajo

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    También se vende por separado
  21. Nuclear Densometer

    SWMS · 12 pasos del trabajo

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    También se vende por separado
  22. Dogman

    SWMS · 12 pasos del trabajo

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    También se vende por separado
  23. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 pasos del trabajo

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    También se vende por separado
  24. Manual Handling

    SWMS · 18 pasos del trabajo

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    También se vende por separado
  25. Horizontal Directional Boring

    SWMS · 16 pasos del trabajo

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    También se vende por separado
  26. Excavation Near Assets

    SWMS · 13 pasos del trabajo

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    También se vende por separado
  27. Plumbing - Water Meter Installation

    SWMS · 16 pasos del trabajo

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    También se vende por separado
  28. Geofabric Installation

    SWMS · 17 pasos del trabajo

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    También se vende por separado
  29. Light Vehicle on Construction

    SWMS · 16 pasos del trabajo

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    También se vende por separado
  30. Soil Compactor

    SWMS · 19 pasos del trabajo

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    También se vende por separado
  31. Site Establishment

    SWMS · 11 pasos del trabajo

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    También se vende por separado
  32. Remote Control Trench Roller

    SWMS · 15 pasos del trabajo

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    También se vende por separado

Qué cubre

Peligros que cubre

Legislación y normas que cita

Cada SWMS incluye nuestra lista de referencia de legislación y códigos de práctica.

Lo que ahorras

PlantillaPasos del trabajoPor separado
Soil Testing11$89.95 · 1 crédito
Pipeline Disinfecting12$89.95 · 1 crédito
Vehicle Mounted Borehole Drilling14$89.95 · 1 crédito
Mobile Plant Working Near-Around8$89.95 · 1 crédito
Spotter11$89.95 · 1 crédito
Bulk Excavations13$89.95 · 1 crédito
Trench Excavation15$89.95 · 1 crédito
Plumbing Drainage18$89.95 · 1 crédito
Mobile Crane16$89.95 · 1 crédito
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 crédito
Tipper and Dog16$89.95 · 1 crédito
Culvert-Tank Installation12$89.95 · 1 crédito
Confined Space Work10$89.95 · 1 crédito
Lasers9$89.95 · 1 crédito
Sediment Fencing18$89.95 · 1 crédito
Guided Boring Pipe Jacking Works17$89.95 · 1 crédito
Silica Dust14$89.95 · 1 crédito
Construction Night Works4$89.95 · 1 crédito
Overhead Electric Lines - Working Near6$89.95 · 1 crédito
Earthmoving Equipment23$89.95 · 1 crédito
Nuclear Densometer12$89.95 · 1 crédito
Dogman12$89.95 · 1 crédito
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1 crédito
Manual Handling18$89.95 · 1 crédito
Horizontal Directional Boring16$89.95 · 1 crédito
Excavation Near Assets13$89.95 · 1 crédito
Plumbing - Water Meter Installation16$89.95 · 1 crédito
Geofabric Installation17$89.95 · 1 crédito
Light Vehicle on Construction16$89.95 · 1 crédito
Soil Compactor19$89.95 · 1 crédito
Site Establishment11$89.95 · 1 crédito
Remote Control Trench Roller15$89.95 · 1 crédito
Comprando uno por uno$2,878.40 · 32 créditos
En este paquete$1,888.95 · 21 créditos Ahorras $989.45

Opiniones

Todavía no hay opiniones.

Cómo funcionan las plantillas

Pruébalo antes de pagar.

  1. Vista previa gratis

    Los pasos del trabajo, los peligros y la primera tarea de cada plantilla se pueden leer. Sin registrarte.

  2. Prueba el editor

    Adapta un SWMS de demostración con tu empresa, tu trabajo y tu obra, en una computadora o en tu teléfono.

  3. Regístrate gratis

    Tus datos y tu logo se pasan. Esta plantilla se abre ya rellenada.

  4. Usa un crédito o compra una sola vez

    Los planes de pago incluyen créditos de plantilla cada mes. O compra esta para quedártela.