抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

超值套装 · 24 个模板

HVAC-Refrigeration

超值套装 · PACK-50321

HVAC-Refrigeration 超值套装模板预览
  • 24 个模板
  • 24 份,只需 13 的价钱
  • 全部放入一个模板库文件夹

A set of 24 SWMS for HVAC and refrigeration contractors: duct work, air conditioning installation and repairs, refrigerant gas, cool rooms, welding and confined spaces.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 13 template credits instead of 24.

Silica Dust SWMS 预览

Silica Dust

SWMSVersion 8
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the requirements of the site management plan in place for the project.

High-risk construction work (HRCW)

This work involves the following high-risk construction work (HRCW), identified in the job steps:

  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with the principal contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • The principal contractor confirms that emergency response procedures are in place

Hold points

  • Hold points identified and signed off before continuing work: (specify the hold points)

Training and licences

  • All workers have a general construction induction card (White Card)

  • Relevant workers have relevant certificates of competency, licences and training. Specify them for each worker on the SWMS sign-off.

  • A trained first aider is on site

  • All workers are trained in site-specific emergency and evacuation procedures, this SWMS, safe work procedures and safety data sheets

Worker duties and responsibilities

  • Be in a fit condition for work, i.e. no signs of fatigue, alcohol or drugs

  • Attend all site inductions and briefings

  • Comply with all site requirements, e.g. PPE, traffic management plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work starts

  • Review this SWMS and amend it if necessary, in consultation with relevant people, after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend the control measures to suit

  • People affected by revisions to this SWMS, including workers, contractors and subcontractors, must be informed as soon as possible

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor monitors the work against the controls in this SWMS

  • This SWMS must be kept on site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete, or for two years if it was involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually

Site-specific notes

(add any notes specific to this site)

Acts, regulations and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011.

Codes of practice

  • Work Health and Safety (Managing Risks of Hazardous Chemicals in the Workplace) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (Managing Risks of Hazardous Chemicals in the Workplace Code of Practice) Approval 2022
  • Work Health and Safety (Managing the Risks of Airborne Crystalline Silica (Silica Dust) in the Workplace Code of Practice) 2024

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025
  • Work Health and Safety Amendment (Silica Worker Register) Regulation 2025
  • Work Health and Safety Amendment (Crystalline Silica Substances) Regulation 2024

Codes of practice

  • Managing risks of hazardous chemicals in the workplace code of practice 2022
  • Managing risks of respirable crystalline silica in the workplace Code of Practice 2026

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • Managing risks of hazardous chemicals in the workplace Code of Practice 2020
  • Managing risks of respirable crystalline silica in the workplace Code of Practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • Managing Risks of Hazardous Chemicals in the Workplace: Code of practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • Managing Risks of Hazardous Chemicals in the Workplace - Code of practice 2018

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • Managing risks of hazardous chemicals in the workplace – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Eye Protection
  • Face Protection
  • Hand ProtectionDisposable gloves
  • Protective ClothingDisposable or washable coveralls
  • Breathing ProtectionHalf-face respirator (P1 or P2, disposable or cartridge), fit-tested

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Exposure to respirable crystalline silica (RCS)

      Before controls4 Acute
      Controls
      • Training and information provided to workers on respirable crystalline silica (RCS) should include the following:

        • Information on RCS through safety data sheet (SDS) or labels

        • Risk management process

        • Work practices, procedures and control measures

        • How to fit, use, maintain and clean personal protective equipment (PPE)

        • Emergency procedures, including any special decontamination procedures or PPE failures

        • First aid and incident reporting procedures

        • The purpose and results of air monitoring, including the types of health tests that may be required

        • Checking controls are working and using them

        • Waste collection and disposal.

        • Explanation of the 30-day trigger: If a worker uses RPE for 30 or more days within a 12-month period for tasks involving RCS, they are required to undergo health monitoring.

      After controls2 Moderate
      Responsible
      • Organisation
      • Supervisor
    • Hazard

      Inexperienced worker

      Before controls3 High
      Controls
      • Supervision provided to inexperienced or new workers, e.g. cutting stone or concrete for the first time or using new machinery.

      After controls2 Moderate
      Responsible
      • Organisation
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 13 个工作步骤,从“Worker consultation”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 13 个额度,而不是 24 个。

    比较套餐和价格
  • 单独购买

    $1,169.35 $2,158.80 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. Silica Dust

    SWMS · 14 个工作步骤

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    也可单独购买
  2. Refrigerant Gas

    SWMS · 9 个工作步骤

    SWMS for the safe use of fluorocarbon refrigerants: licensing, cylinder transport and storage, refrigerant recovery, inspection and emergency response.

    也可单独购买
  3. Materials Duct Lifter

    SWMS · 6 个工作步骤

    Materials Duct Lifter SWMS: 6 job steps covering site set-up, power line clearances, lifter pre-inspection, operation and emergency response.

    也可单独购买
  4. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  5. Duct Work Installation

    SWMS · 11 个工作步骤

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    也可单独购买
  6. Air Conditioning Installation

    SWMS · 16 个工作步骤

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    也可单独购买
  7. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  8. Cool Room Construction

    SWMS · 18 个工作步骤

    SWMS for building insulated cool room and freezer panels: set-up, working at height, cutting and lifting panels, mobile plant, completion and emergencies.

    也可单独购买
  9. Risers Working In

    SWMS · 12 个工作步骤

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    也可单独购买
  10. Welding

    SWMS · 10 个工作步骤

    Welding SWMS: 10 job steps covering fire and explosion, gas cylinders, fumes, electrical equipment, burns, heat stress, angle grinders and emergencies.

    也可单独购买
  11. Air Conditioning Service and Repairs

    SWMS · 14 个工作步骤

    SWMS for air conditioning service and repairs: refrigerants, indoor and outdoor unit maintenance, energised electrical work, testing and emergencies.

    也可单独购买
  12. Confined Space Work

    SWMS · 10 个工作步骤

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    也可单独购买
  13. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  14. Asbestos Awareness

    SWMS · 4 个工作步骤

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    也可单独购买
  15. Hazardous Chemicals

    SWMS · 12 个工作步骤

    SWMS for hazardous chemicals work: purchasing, storage, labelling, handling, confined spaces, completion and emergency response.

    也可单独购买
  16. Working in Roof Spaces

    SWMS · 8 个工作步骤

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    也可单独购买
  17. Working On/Near Telecommunications Towers

    SWMS · 8 个工作步骤

    Working on or near telecommunications towers SWMS: 8 job steps covering tower climbing, falls, RF exposure, completion and emergencies.

    也可单独购买
  18. Height Access Equipment

    SWMS · 17 个工作步骤

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    也可单独购买
  19. Mechanical Ventilation System

    SWMS · 15 个工作步骤

    Mechanical Ventilation System SWMS: 15 job steps for installing a commercial kitchen exhaust canopy or hood, from set-up to emergency response.

    也可单独购买
  20. Concrete Chasing

    SWMS · 13 个工作步骤

    Concrete chasing SWMS with 13 job steps, covering silica dust, working at height, tools, noise, vibration and emergency response.

    也可单独购买
  21. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  22. Refrigeration

    SWMS · 18 个工作步骤

    SWMS for refrigeration work: cylinder handling, system evacuation, flushing and charging, working at height, testing and emergency response.

    也可单独购买
  23. Cool Room Repair

    SWMS · 16 个工作步骤

    A SWMS for repairing cool rooms and freezer rooms from an elevated work platform (EWP): the hazards and controls for each job step.

    也可单独购买
  24. Pipework Mechanical

    SWMS · 19 个工作步骤

    SWMS for mechanical pipework installation: fire system, condenser water and chilled water pipework, from site set-up to commissioning.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
Silica Dust14$89.95 · 1 个额度
Refrigerant Gas9$89.95 · 1 个额度
Materials Duct Lifter6$89.95 · 1 个额度
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Duct Work Installation11$89.95 · 1 个额度
Air Conditioning Installation16$89.95 · 1 个额度
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Cool Room Construction18$89.95 · 1 个额度
Risers Working In12$89.95 · 1 个额度
Welding10$89.95 · 1 个额度
Air Conditioning Service and Repairs14$89.95 · 1 个额度
Confined Space Work10$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Asbestos Awareness4$89.95 · 1 个额度
Hazardous Chemicals12$89.95 · 1 个额度
Working in Roof Spaces8$89.95 · 1 个额度
Working On/Near Telecommunications Towers8$89.95 · 1 个额度
Height Access Equipment17$89.95 · 1 个额度
Mechanical Ventilation System15$89.95 · 1 个额度
Concrete Chasing13$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Refrigeration18$89.95 · 1 个额度
Cool Room Repair16$89.95 · 1 个额度
Pipework Mechanical19$89.95 · 1 个额度
逐个购买$2,158.80 · 24 个额度
在本套装中$1,169.35 · 13 个额度 节省 $989.45

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。