抢先体验优惠:抢先体验: 30% 折扣,只要保持订阅就一直有效.

领取优惠

模板文件为英文。

免费试用编辑器
超值套装 · 13 个模板

Structural Steel Construction

超值套装 · PACK-50325

Structural Steel Construction 超值套装模板预览
  • 13 个模板
  • 13 份,只需 10 的价钱
  • 全部放入一个模板库文件夹

A set of 13 SWMS for structural steel erectors and fabricators: structural steel construction, mobile and tower cranes, welding, dogging, spotters and core drilling.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost ten template credits instead of 13.

EWP, Boom, Cherry Picker and Scissor Lift SWMS 预览

EWP, Boom, Cherry Picker and Scissor Lift

SWMSVersion 9
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the site management plan in place for the project.

High-risk construction work (HRCW)

This work involves the following high-risk construction work. The job steps that involve it are marked HRCW.

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Energised ElectricalWork on or near energised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with the principal contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • The principal contractor confirms emergency response procedures are in place

Hold points

  • Hold points are identified and signed off before work continues: (specify the hold points)

Training and licences

  • All workers have a General Construction Induction Card (White Card)

  • Relevant workers hold the relevant certificates of competency, licences and training, recorded for each worker in the SWMS sign-off

  • A trained first aider is on site

  • All workers are trained in site-specific emergency and evacuation procedures, this SWMS, safe work procedures and safety data sheets

Worker duties and responsibilities

  • Be fit for work, with no signs of fatigue, alcohol or drugs

  • Attend all site inductions and briefings

  • Comply with all site requirements, e.g. PPE and traffic management plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People affected by revisions to this SWMS, including workers, contractors and sub-contractors, must be informed as soon as possible

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually

Site-specific notes

(add any notes specific to this site)

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011.

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (Managing the Risk of Falls at Workplaces) Code of Practice 2015
  • Work Health and Safety (Managing Risks of Plant in the Workplace) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (Managing the Risk of Falls at Workplaces Code of Practice) Approval 2020
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025
  • Work Health and Safety (Managing Risks of Plant in the Workplace Code of Practice) 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Working near overhead and underground electric lines Electrical Safety Code of Practice 2020

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • Managing the risk of falls at workplace code of practice 2019
  • Managing the risks of plant in the workplace code of practice 2022
  • Construction work code of practice 2019
  • Elevating work platforms code of practice 2026
  • Work near overhead and underground electric lines code of practice 2026

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • Managing risks of plant in the workplace Code of Practice 2026
  • Managing the risk of falls at workplaces- Code of practice 2020
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • Managing the Risks of Plant in the Workplace: Code of practice 2020
  • Managing the Risk of Falls at Workplaces: Code of practice 2020
  • Construction work Code of Practice 2024
  • Elevating work platforms: Code of practice 2025

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • Managing the Risk of Falls at Workplaces - Code of practice 2018
  • Construction Work - Code of practice 2024
  • Managing the Risks of Plant in the Workplace - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • Managing risks of plant in the workplace – Code of practice 2022
  • Managing the risk of falls at workplaces – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Codes of practice

  • First Aid in the Workplace: Compliance code 2021
  • Prevention of falls in general construction: Compliance code 2019

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Face Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Tie back long and loose hair.

Job steps, hazards and controls

  • Work activity

    Implement a falls emergency rescue plan

    • Hazard

      Personal injury from a fall

      Before controls4 Acute
      Controls
      • Ensure a falls rescue plan completed for every job

      • Amend the plan if conditions of the work change in a way that could affect a rescue/response

      • Trained first aid providers must be available on site

      • Ensure a reliable means to contact emergency services is available

      After controls2 Moderate
      Responsible
      • SupervisorEnsure the plan is in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

还有 11 个工作步骤,从“Arrival on site and site assessment”到“Emergency response”

每一步都有危险、风险等级和控制措施,另附工人签到。

预览方式

在浏览器中的样子

获取这个超值套装

免费注册,然后选择获取方式。每份文件都会放进你的模板库,存在以套装命名的文件夹里。

  • 付费套餐包含

    使用套餐中的模板额度。本套装只需 10 个额度,而不是 13 个。

    比较套餐和价格
  • 单独购买

    $899.50 $1,169.35 一次付清,永久归你。免费套餐也能用。

注册无需银行卡。抢先体验会员购买任何套餐都可享 30% 折扣。

包含内容

  1. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 个工作步骤

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    也可单独购买
  2. Powered Non-powered Tools

    SWMS · 12 个工作步骤

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    也可单独购买
  3. Mobile Plant Working Near-Around

    SWMS · 8 个工作步骤

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    也可单独购买
  4. Mobile Crane

    SWMS · 16 个工作步骤

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    也可单独购买
  5. Structural Steel Construction

    SWMS · 17 个工作步骤

    SWMS for structural steel erection: planning, deliveries, working at height, crane work, steel erection, hot work, completion and emergencies.

    也可单独购买
  6. Spotter

    SWMS · 11 个工作步骤

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    也可单独购买
  7. Concrete Sawing and Core Drilling

    SWMS · 13 个工作步骤

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    也可单独购买
  8. Manual Handling

    SWMS · 18 个工作步骤

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    也可单独购买
  9. Height Access Equipment

    SWMS · 17 个工作步骤

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    也可单独购买
  10. Tower Crane

    SWMS · 13 个工作步骤

    SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.

    也可单独购买
  11. Welding

    SWMS · 10 个工作步骤

    Welding SWMS: 10 job steps covering fire and explosion, gas cylinders, fumes, electrical equipment, burns, heat stress, angle grinders and emergencies.

    也可单独购买
  12. Dogman

    SWMS · 12 个工作步骤

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    也可单独购买
  13. Earthmoving Equipment

    SWMS · 23 个工作步骤

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    也可单独购买

涵盖内容

涵盖的危险

引用的法规和标准

每份 SWMS 都附有我们的法规和实施规程参考清单。

你能省多少

模板工作步骤单独购买
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 个额度
Powered Non-powered Tools12$89.95 · 1 个额度
Mobile Plant Working Near-Around8$89.95 · 1 个额度
Mobile Crane16$89.95 · 1 个额度
Structural Steel Construction17$89.95 · 1 个额度
Spotter11$89.95 · 1 个额度
Concrete Sawing and Core Drilling13$89.95 · 1 个额度
Manual Handling18$89.95 · 1 个额度
Height Access Equipment17$89.95 · 1 个额度
Tower Crane13$89.95 · 1 个额度
Welding10$89.95 · 1 个额度
Dogman12$89.95 · 1 个额度
Earthmoving Equipment23$89.95 · 1 个额度
逐个购买$1,169.35 · 13 个额度
在本套装中$899.50 · 10 个额度 节省 $269.85

评价

暂无评价。

模板如何使用

在付款前先试用。

  1. 免费预览

    每个模板的工作步骤、危险和第一项任务都可以直接阅读,无需注册。

  2. 试用编辑器

    在电脑或手机上,用你的公司、工作和工地信息修改一份演示 SWMS。

  3. 免费注册

    你的信息和标志都会带过去。这个模板打开时已经填好。

  4. 使用额度或单独购买

    付费套餐每月都包含模板额度。也可以单独购买这一份,永久保留。