Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free

System · 121 documentsPart of Electrician-HVAC-Solar OHS-WHS Industry Suite

Electrical Renovations

SWMS · SWMS-10465

  • 20 job steps
  • Version 4

This SWMS covers the hazards and controls for electrical renovations, including power isolation before demolition, switchboard installation, electrical and data rough-in, fitting appliances, fixtures and points, and testing and commissioning for shop and office fit-outs.

It takes your crew through each job step, from respirable crystalline silica training, planning and arriving on site to working near energised electrical installations, ladders, completion and emergency response.

It suits electricians, contractors and construction workers on shop and office fit-outs and renovations, and the safety officers and project managers who oversee them.

Written by SafetyDocs safety experts, who have been writing safety documents since 2004.

See its own page

Preview of the Electrical Renovations SWMS

Electrical Renovations

SWMSVersion 4
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

  • AsbestosAsbestos disturbance
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more, including work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • High Visibility

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

19 more job steps, from Planning to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this system

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This one costs 20.

    Compare plans and prices
  • Buy it once

    $999.90 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What it covers

20 job steps

  1. Provide training on the health effects associated with RCSProvide RCS health training to workers
  2. PlanningUse qualified, licensed personnel
  3. Obtain supply authority certificatesComply with AS/NZS 3000 and keep plans on site
  4. Arrival on-site & assess onsite conditionsAssess the site and its conditions
  5. Check weather conditions & prepareCheck the weather and prepare for hot or cold conditions
  6. Work area set-upSet up an exclusion zone and barricades
  7. EnvironmentControl noise, waste, chemicals, vehicles and fauna
  8. House keepingKeep the work area clean and clear of trip hazards
  9. Manual tasksUse safe manual handling methods
  10. Working with powered & non-powered toolsUse powered and non-powered tools safely
  11. Hazardous substance/chemical useUse hazardous chemicals as the SDS directs
  12. Working at height on laddersUse ladders safely and prevent falls
  13. Working on or near Energised Electrical Installations or ServicesWork safely near energised electrical installations
  14. Isolation of electric power before demolitionIsolate electrical power before demolition
  15. Switchboard installation, test and commissionInstall and check switchboards
  16. Electrical & data rough-inInstall electrical and data cabling safely
  17. Fitting appliances, fixtures, electrical & data pointsFit appliances, fixtures and electrical and data points
  18. Test & commissionTest and commission the installed work
  19. On completionComplete final checks and secure the area
  20. Emergency responseFollow the emergency response steps

Hazards it covers

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.