Low Voltage Electrical Repairs and Installations
- Company doing the work
- [Company]
- Business contact
- —
- Phone #
- —
- Responsible person (for monitoring SWMS and work)
- —
- Signature
- —
- Date
- —
- Contact phone #
- —
- Principal contractor (PC)
- [Principal contractor]
- PC address
- —
- PC phone #
- [PC phone]
- Date SWMS provided to PC
- —
- Job site address
- [Site address]
- Part of a construction project
- —
Site management plan
If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.
High-risk construction work
This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)
- Mobile Plant
- Gas MainsPressurised gas distribution mains or piping
- Hazardous Lineschemical, fuel or refrigerant lines
- Energised Electricalenergised electrical installations or services
- Work in a ceiling space (W.A. Only)
Planning and preparation
Planning/Preparation
Liaise with Principal Contractor to identify on-site safety systems and procedures
Establish supervisory and communication arrangements
Principal contractor to confirm emergency response procedures are in place.
Hold points
Hold points identified and signed off before continuing work. (specify the hold points)
Training and licences
All workers to have a General Construction Induction Card
Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.
Trained First Aider on site
All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.
Worker duties and responsibilities
Fit condition for work, i.e., no signs of fatigue, alcohol or drugs
Attend all site inductions/briefings
Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)
Only carry out work related to the contract
Inspect completed work and report possible safety, environmental and quality matters to the supervisor.
Monitoring and review
All people involved in the task must have this SWMS communicated to them before work commences
SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident
If additional site hazards identified, review this SWMS and amend control measures to suit
People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP
Give the principal contractor a copy of the revised SWMS
The site supervisor to monitor works against the controls stated in this SWMS
SWMS must be kept on-site and made available for inspection or review
Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident
Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.
Site-specific notes
Legislation and codes of practice
None listed.
Personal protective equipment
- Foot Protection
- High Visibility
Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.
Job steps, hazards and controls
- Work activity
Planning
- Hazard
Electrocution
Before controls4 AcuteControlsAll workers who work on or near electrical mains and apparatus must be trained and appropriately qualified with correct licence endorsements for the task
During the previous 12 months (where it is relevant to the work), all workers must have demonstrated competence in approved procedures for release, rescue and resuscitation:
Requirements of the Electrical Safety Rules
After controls2 ModerateResponsible- Supervisor
- Hazard
Atmospheric hazard - poor air quality/ chemical exposures
Before controls4 AcuteControlsEnsure a Confined Space Entry Permit is issued, as required, if work involves a Confined Space. If work involves an identified Confined Space, a separate, dedicated ‘Confined Spaces SWMS’ is required in conjunction with this SWMS.
Note: A confined space is as an enclosed or partially enclosed space that is likely to be a risk to health and safety because of:
An atmosphere that does not have a safe oxygen level, or
Contaminants, including airborne gases, vapours and dust that may cause injury from fire or explosion, or
Harmful concentrations of any airborne contaminants
Examples of confined spaces involved with installing insulation batts might include ceilings or wall cavities when these examples meet the definition of a confined space
Ensure a confined space entry permit issued for each confined space entry.
After controls2 ModerateResponsible- Supervisor
- Hazard
Out-of-hours / night work - Fatigue
Before controls3 HighControlsAllow adequate meal breaks for workers
Do not schedule full double shifts for workers as worker fatigue increases the risk of incidents
Commercial premises:
Additional Security personnel on-site to ensure no unauthorised access by the general public while work is being performed
Workers have access to:
Suitable amenities (toilets/wash facilities/drinking water)
Sufficient lighting including parking areas
Air conditioning and heating
Mechanical ventilation if required
Emergency exits lit and unblocked
Safe area for parking/unloading equipment – protected from the rain.
After controls2 ModerateResponsible- Supervisor
- Hazard
Working alone - Emergency
Before controls3 HighControlsAvoid people working alone, use a buddy system to provide immediate support
Have a reliable communication system in place and test regularly
All workers trained in communication protocol:
Mobile phones are to be kept on the worker at all times and switched on
Lone workers must call the supervisor upon arrival and departure, and regular call-ins made
Call-in times must be agreed with relevant worker and supervisor and based on the risk level expected at the site
Supervisor must have address details, expected arrival/departure & visit duration times
Supervisors have details of the worker’s vehicle (registration, colour make, model)
Workers only attend the site as directed by supervisor
Code words established to indicate if the worker is in a threatening situation
Emergency procedures in place if call-ins not followed, or communication lost with the worker.
After controls2 ModerateResponsible- Supervisor
IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute
Overall risk after controls2 MModeratethe highest rating after controls