Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Value pack · 5 templates

Window Cleaning

Value pack · PACK-50326

  • 5 templates
  • 5 for the price of 4
  • Arrives in one Library folder

Five SWMS for window cleaning contractors: working from elevating work platforms and rope access, cleaning with a water-fed pole, manual handling, and heat stress.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost four template credits instead of five.

Preview of the EWP, Boom, Cherry Picker and Scissor Lift SWMS

EWP, Boom, Cherry Picker and Scissor Lift

SWMSVersion 8
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the site management plan in place for the project.

High-risk construction work (HRCW)

This work involves the following high-risk construction work. The job steps that involve it are marked HRCW.

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Energised ElectricalWork on or near energised electrical installations or services
  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with the principal contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • The principal contractor confirms emergency response procedures are in place

Hold points

  • Hold points are identified and signed off before work continues: (specify the hold points)

Training and licences

  • All workers have a General Construction Induction Card (White Card)

  • Relevant workers hold the relevant certificates of competency, licences and training, recorded for each worker in the SWMS sign-off

  • A trained first aider is on site

  • All workers are trained in site-specific emergency and evacuation procedures, this SWMS, safe work procedures and safety data sheets

Worker duties and responsibilities

  • Be fit for work, with no signs of fatigue, alcohol or drugs

  • Attend all site inductions and briefings

  • Comply with all site requirements, e.g. PPE and traffic management plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People affected by revisions to this SWMS, including workers, contractors and sub-contractors, must be informed as soon as possible

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually

Site-specific notes

(add any notes specific to this site)

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011.

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (Managing the Risk of Falls at Workplaces) Code of Practice 2015
  • Work Health and Safety (Managing Risks of Plant in the Workplace) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (Managing the Risk of Falls at Workplaces Code of Practice) Approval 2020
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025
  • Work Health and Safety (Managing Risks of Plant in the Workplace Code of Practice) 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • Managing the Risk of Falls at Workplaces Code of Practice 2021
  • Managing Risks of Plant in the Workplace Code of Practice 2021
  • Working near overhead and underground electric lines Electrical Safety Code of Practice 2020

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • Managing the risk of falls at workplace code of practice 2019
  • Managing the risks of plant in the workplace code of practice 2022
  • Construction work code of practice 2019
  • Elevating work platforms code of practice 2026
  • Work near overhead and underground electric lines code of practice 2026

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • Managing risks of plant in the workplace Code of Practice 2026
  • Managing the risk of falls at workplaces- Code of practice 2020
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • Managing the Risks of Plant in the Workplace: Code of practice 2020
  • Managing the Risk of Falls at Workplaces: Code of practice 2020
  • Construction work Code of Practice 2024
  • Elevating work platforms: Code of practice 2025

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • Managing the Risk of Falls at Workplaces - Code of practice 2018
  • Construction Work - Code of practice 2024
  • Managing the Risks of Plant in the Workplace - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • Managing risks of plant in the workplace – Code of practice 2022
  • Managing the risk of falls at workplaces – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Codes of practice

  • First Aid in the Workplace: Compliance code 2021
  • Prevention of falls in general construction: Compliance code 2019

Personal protective equipment (PPE)

  • Foot Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Face Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Tie back long and loose hair.

Job steps, hazards and controls

  • Work activity

    Implement a falls emergency rescue plan

    • Hazard

      Personal injury from a fall

      Before controls4 Acute
      Controls
      • Ensure a falls rescue plan completed for every job

      • Amend the plan if conditions of the work change in a way that could affect a rescue/response

      • Trained first aid providers must be available on site

      • Ensure a reliable means to contact emergency services is available

      After controls2 Moderate
      Responsible
      • SupervisorEnsure the plan is in place

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

11 more job steps, from Arrival on site and site assessment to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 4 instead of 5.

    Compare plans and prices
  • Buy it once

    $359.80 $449.75 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 job steps

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Also sold on its own
  2. Rope Access

    SWMS · 13 job steps

    Rope Access SWMS: 13 job steps covering rigging plans, falls rescue planning, inspecting harnesses and anchor points, and working on the ropes.

    Also sold on its own
  3. Waterfed Pole System

    SWMS · 12 job steps

    SWMS for cleaning with a water-fed pole system: overhead power lines, set-up beside traffic, tools, fuelling small engines and emergency response.

    Also sold on its own
  4. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  5. Heat Stress

    SWMS · 8 job steps

    Heat Stress SWMS: 8 job steps covering heat stress symptoms, acclimatisation, hydration, shade, working alone and emergency response.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 credit
Rope Access13$89.95 · 1 credit
Waterfed Pole System12$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Heat Stress8$89.95 · 1 credit
Bought one by one$449.75 · 5 credits
In this pack$359.80 · 4 credits You save $89.95

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.