A set of 15 SWMS and 22 SOPs for shop-fitters and fit-out contractors.

The SWMS cover site establishment, partitioning, plasterboard, suspended ceilings, glazing and soft demolition. The SOPs include Table Saw, Reciprocating Saw and Handheld Circular Saw.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 37.

Preview of the Height Access Equipment SWMS

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 more job steps, from Work area set-up to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 28 instead of 37.

    Compare plans and prices
  • Buy it once

    $2,518.60 $3,328.15 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Height Access Equipment

    SWMS · 17 job steps

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    Also sold on its own
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 job steps

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    Also sold on its own
  3. Battery Charging and Handling

    SOP · 7 sections

    Safe operating procedure for charging and handling batteries: hazards, emergency response to acid splashes, PPE, precautions, recharging area and battery movement.

    Also sold on its own
  4. Painting and Decorating

    SWMS · 15 job steps

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    Also sold on its own
  5. Glazing

    SWMS · 15 job steps

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    Also sold on its own
  6. Table Saw

    SOP · 9 sections

    Safe operating procedure for a table saw: hazards, PPE, precautions, pre-operational inspection, operation, kickback prevention and a hazard checklist.

    Also sold on its own
  7. Soft Demolition

    SWMS · 20 job steps

    SWMS for soft demolition and strip-out: asbestos, silica dust, glass removal, working at height, tools, waste and emergency response.

    Also sold on its own
  8. Reciprocating Saw

    SOP · 9 sections

    Safe operating procedure for a reciprocating saw: hazards, PPE, training, pre-operational inspection, maintenance, operation, first aid and a hazard checklist.

    Also sold on its own
  9. Trestle Scaffold

    SOP · 7 sections

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    Also sold on its own
  10. Plasterboard

    SWMS · 16 job steps

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    Also sold on its own
  11. Electric Air Compressor

    SOP · 9 sections

    Safe operating procedure for an electric air compressor: hazards, PPE, inspection, operation, cleaning and a hazard checklist.

    Also sold on its own
  12. Manual Handling

    SOP · 5 sections

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Also sold on its own
  13. Site Establishment Shop Fit-out

    SWMS · 10 job steps

    Site Establishment Shop Fit-out SWMS: 10 job steps from planning and arrival to powered tools, completion and emergency response.

    Also sold on its own
  14. Handheld Circular Saw

    SOP · 8 sections

    Safe operating procedure for a handheld circular saw: hazards, PPE, precautions, inspection, operation, kickback and a hazard checklist.

    Also sold on its own
  15. Nail Gun - Battery Operated -

    SOP · 8 sections

    Safe operating procedure for a battery-operated nail gun: hazards, PPE, battery charging, operation, jammed nails and a training register.

    Also sold on its own
  16. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 job steps

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Also sold on its own
  17. Silica Dust

    SWMS · 14 job steps

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Also sold on its own
  18. Platform Ladder

    SOP · 7 sections

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    Also sold on its own
  19. Docking Saw

    SOP · 10 sections

    Safe operating procedure for a docking saw: hazards, PPE, pre-operational inspection, maintenance, step-by-step operation and a hazard checklist.

    Also sold on its own
  20. V Cut Mitre Saw

    SOP · 10 sections

    Safe operating procedure for a V cut mitre saw: hazards, PPE, training, inspection, blade replacement, operation, maintenance and a hazard checklist.

    Also sold on its own
  21. Angle Grinder

    SOP · 9 sections

    Safe operating procedure for an angle grinder: hazards, PPE, inspection, precautions, operation, changing discs, maintenance and a hazard checklist.

    Also sold on its own
  22. Pneumatic Tools

    SOP · 8 sections

    Safe operating procedure for pneumatic tools: hazards, PPE, precautions, maintenance, pre-operational inspection, operation and a hazard checklist.

    Also sold on its own
  23. Jigsaw

    SOP · 9 sections

    Safe operating procedure for a jigsaw: hazards, PPE, training, pre-operational inspection, operation, blade replacement, maintenance and a hazard checklist.

    Also sold on its own
  24. Mitre/Drop Saw

    SOP · 8 sections

    Safe operating procedure for a mitre or drop saw: hazards, PPE, precautions, inspection, maintenance, operation, blade replacement and a hazard checklist.

    Also sold on its own
  25. Hand Tools

    SOP · 9 sections

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Also sold on its own
  26. Handheld Router

    SOP · 9 sections

    Safe operating procedure for a handheld router: hazards, PPE, training, inspection, maintenance, operating steps and a hazard checklist.

    Also sold on its own
  27. Cabinet Installation

    SWMS · 12 job steps

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    Also sold on its own
  28. Suspended Grid System Ceiling Installation

    SWMS · 12 job steps

    Suspended grid system ceiling installation SWMS: 12 job steps covering ladders and trestles, silica dust, falling objects, mobile plant and emergencies.

    Also sold on its own
  29. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  30. Scissor Lift

    SOP · 10 sections

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    Also sold on its own
  31. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  32. Tiling

    SWMS · 14 job steps

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    Also sold on its own
  33. Partitioning Steel-Stud-Track

    SWMS · 12 job steps

    Covers installing steel, stud and track partitioning in commercial premises, with the risks and controls for each job step from silica training to emergency response.

    Also sold on its own
  34. Nail Gun - Pneumatic -

    SOP · 8 sections

    Safe operating procedure for a pneumatic nail gun: hazards, PPE, training, inspection, maintenance, operation, jammed nails and a hazard checklist.

    Also sold on its own
  35. Working with Guarded Machinery

    SOP · 12 sections

    Safe operating procedure for working with or near guarded machinery: hazards, PPE, maintenance and LOTO, cleaning, reporting and a hazard checklist.

    Also sold on its own
  36. Mobile Scaffolding

    SOP · 8 sections

    Safe operating procedure for mobile scaffolding: hazards, PPE, inspection, erecting, moving and dismantling, and a working at height checklist.

    Also sold on its own
  37. Handheld Drill

    SOP · 9 sections

    Safe operating procedure for a handheld drill: hazards, PPE, precautions, pre-operational inspection, operation, maintenance and a hazard checklist.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Height Access Equipment17$89.95 · 1 credit
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 credit
Battery Charging and Handling0$89.95 · 1 credit
Painting and Decorating15$89.95 · 1 credit
Glazing15$89.95 · 1 credit
Table Saw0$89.95 · 1 credit
Soft Demolition20$89.95 · 1 credit
Reciprocating Saw0$89.95 · 1 credit
Trestle Scaffold0$89.95 · 1 credit
Plasterboard16$89.95 · 1 credit
Electric Air Compressor0$89.95 · 1 credit
Manual Handling0$89.95 · 1 credit
Site Establishment Shop Fit-out10$89.95 · 1 credit
Handheld Circular Saw0$89.95 · 1 credit
Nail Gun - Battery Operated -0$89.95 · 1 credit
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 credit
Silica Dust14$89.95 · 1 credit
Platform Ladder0$89.95 · 1 credit
Docking Saw0$89.95 · 1 credit
V Cut Mitre Saw0$89.95 · 1 credit
Angle Grinder0$89.95 · 1 credit
Pneumatic Tools0$89.95 · 1 credit
Jigsaw0$89.95 · 1 credit
Mitre/Drop Saw0$89.95 · 1 credit
Hand Tools0$89.95 · 1 credit
Handheld Router0$89.95 · 1 credit
Cabinet Installation12$89.95 · 1 credit
Suspended Grid System Ceiling Installation12$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Scissor Lift0$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Tiling14$89.95 · 1 credit
Partitioning Steel-Stud-Track12$89.95 · 1 credit
Nail Gun - Pneumatic -0$89.95 · 1 credit
Working with Guarded Machinery0$89.95 · 1 credit
Mobile Scaffolding0$89.95 · 1 credit
Handheld Drill0$89.95 · 1 credit
Bought one by one$3,328.15 · 37 credits
In this pack$2,518.60 · 28 credits You save $809.55

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.