Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free
Value pack · 15 templates

Concrete Tilt-up Construction

Value pack · PACK-50319

  • 15 templates
  • 15 for the price of 11
  • Arrives in one Library folder

A set of 15 SWMS for tilt-up and precast panel contractors: tilt-up panels, panel lifting, concrete placement, foundations, dogging and spotters.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 11 template credits instead of 15.

Preview of the Pre-cast Tilt-up Panels SWMS

Pre-cast Tilt-up Panels

SWMSVersion 8
Company doing the work
[Company]
Business contact
—
Phone #
—
Responsible person (for monitoring SWMS and work)
—
Signature
—
Date
—
Contact phone #
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone #
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Is the work associated with a construction project?
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Mobile Plant

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/Review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

None listed.

Personal protective equipment

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to silica dust

      Before controls4 Acute
      Controls
      • Training and information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

18 more job steps, from Temporary casting bed-design to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 11 instead of 15.

    Compare plans and prices
  • Buy it once

    $989.45 $1,349.25 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Pre-cast Tilt-up Panels

    SWMS · 19 job steps

    Pre-cast Tilt-up Panels SWMS: nineteen job steps covering casting beds, formwork, steel reinforcement, concrete placing, stripping and emergency response.

    Also sold on its own
  2. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  3. Spotter

    SWMS · 11 job steps

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Also sold on its own
  4. Concrete Placement and Finishing

    SWMS · 13 job steps

    SWMS for concrete placement and finishing: delivery, pumping and pouring, power lines, mobile plant, cement burns, trowelling machines and emergencies.

    Also sold on its own
  5. Concrete Boom or Line Pumping

    SWMS · 15 job steps

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    Also sold on its own
  6. Concrete Foundations Excavating - Pouring

    SWMS · 17 job steps

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    Also sold on its own
  7. Silica Dust

    SWMS · 14 job steps

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Also sold on its own
  8. Dogman

    SWMS · 12 job steps

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Also sold on its own
  9. Tilt-up Panel Lifting

    SWMS · 18 job steps

    Tilt-up Panel Lifting SWMS: 18 job steps covering the lifting and bracing of tilt-up and precast concrete panels, from site set-up to emergency response.

    Also sold on its own
  10. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  11. Caulking Grouting Patching

    SWMS · 12 job steps

    SWMS for caulking, grouting and patching concrete panels, block and brick work, paving tiles and other building components.

    Also sold on its own
  12. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  13. Concrete Sawing and Core Drilling

    SWMS · 13 job steps

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    Also sold on its own
  14. Air Compressor

    SWMS · 9 job steps

    SWMS for portable air compressor work: transport, set-up, operation, fuel and electrical hazards, noise, housekeeping, shut-down and emergencies.

    Also sold on its own
  15. Concrete Slab on Ground

    SWMS · 17 job steps

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Pre-cast Tilt-up Panels19$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Spotter11$89.95 · 1 credit
Concrete Placement and Finishing13$89.95 · 1 credit
Concrete Boom or Line Pumping15$89.95 · 1 credit
Concrete Foundations Excavating - Pouring17$89.95 · 1 credit
Silica Dust14$89.95 · 1 credit
Dogman12$89.95 · 1 credit
Tilt-up Panel Lifting18$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Caulking Grouting Patching12$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Concrete Sawing and Core Drilling13$89.95 · 1 credit
Air Compressor9$89.95 · 1 credit
Concrete Slab on Ground17$89.95 · 1 credit
Bought one by one$1,349.25 · 15 credits
In this pack$989.45 · 11 credits You save $359.80

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.