Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free
Value pack · 46 templates

Civil Water and Sewerage Systems Combo

Value pack · PACK-50333

  • 46 templates
  • 46 for the price of 31
  • Arrives in one Library folder

A set of 32 SWMS and 14 SOPs for civil contractors building water and sewerage systems.

The SWMS cover trench excavation, pipeline disinfecting, borehole drilling, drainage, soil testing and culvert and tank installation. The SOPs include Grader, Front-end Loader and Plant Attachment Maintenance.

Each document is the same one sold on its own, so you get every update to it. Together they cost 31 template credits instead of 46.

Preview of the Driver Posture & Responsibilities SOP

Driver Posture & Responsibilities

SOPVersion 4

Acronyms

  • PPE - Personal Protective Equipment

  • SOP - Safe Operating Procedure

8 more sections

  1. Hazards
  2. Pre-operational inspection
  3. Precautions
  4. Driver responsibility
  5. Vehicle ergonomic principles
  6. and 3 more

Written in full, ready for your business's details.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 31 instead of 46.

    Compare plans and prices
  • Buy it once

    $2,788.45 $4,137.70 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Driver Posture & Responsibilities

    SOP · 9 sections

    Safe operating procedure for driver posture and responsibilities: hazards, ergonomics, fuelling, accident procedure and a vehicle pre-operational checklist.

    Also sold on its own
  2. Soil Testing

    SWMS · 11 job steps

    Soil Testing SWMS: 11 job steps from remote travel and set-up to soil testing, mobile plant, completion and emergency response.

    Also sold on its own
  3. Pipeline Disinfecting

    SWMS · 12 job steps

    SWMS for disinfecting pipelines that carry potable water: chlorine handling, water testing, injecting the mains, refuelling, environment and emergencies.

    Also sold on its own
  4. Vehicle Mounted Borehole Drilling

    SWMS · 14 job steps

    Vehicle Mounted Borehole Drilling SWMS: 14 job steps covering travel, work area set-up, drilling, maintenance, fuelling and emergencies.

    Also sold on its own
  5. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  6. Handheld Power Tools

    SOP · 9 sections

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Also sold on its own
  7. Spotter

    SWMS · 11 job steps

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Also sold on its own
  8. Bulk Excavations

    SWMS · 13 job steps

    SWMS for bulk excavation work: planning, plant operation, shoring, water-charged ground, silica dust, re-fuelling, environmental controls and emergencies.

    Also sold on its own
  9. Trench Excavation

    SWMS · 15 job steps

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    Also sold on its own
  10. Grader

    SOP · 7 sections

    Safe operating procedure for a grader: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    Also sold on its own
  11. Plumbing Drainage

    SWMS · 18 job steps

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    Also sold on its own
  12. Mobile Crane

    SWMS · 16 job steps

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    Also sold on its own
  13. Front-end Loader

    SOP · 7 sections

    Safe operating procedure for a front-end loader: hazards, precautions, operation, maintenance and a hazard checklist for powered mobile machinery.

    Also sold on its own
  14. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 job steps

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    Also sold on its own
  15. Plant Attachment Maintenance

    SOP · 10 sections

    Safe operating procedure for plant attachment maintenance: hazards, PPE, training, isolation under LOTO, and cleaning, welding and hydraulics safety.

    Also sold on its own
  16. Tipper and Dog

    SWMS · 16 job steps

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    Also sold on its own
  17. Culvert-Tank Installation

    SWMS · 12 job steps

    Culvert-Tank Installation SWMS: 12 job steps for installing culverts, tanks and similar structures, from planning to emergency response.

    Also sold on its own
  18. Manual Handling

    SOP · 5 sections

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Also sold on its own
  19. Confined Space Work

    SWMS · 10 job steps

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    Also sold on its own
  20. Lasers

    SWMS · 9 job steps

    Lasers SWMS: 9 job steps covering Class 1, 2 and 3R construction lasers, beam set-up, eye injury, mobile plant, roadside work and emergencies.

    Also sold on its own
  21. Sediment Fencing

    SWMS · 18 job steps

    SWMS for installing sediment and safety fencing: machine set-up, wire straining, nail and staple guns, refuelling and emergency response.

    Also sold on its own
  22. Guided Boring Pipe Jacking Works

    SWMS · 17 job steps

    A SWMS for guided boring and pipe jacking works: the hazards and controls for excavating launch and retrieval pits, hoisting and running the machine.

    Also sold on its own
  23. Silica Dust

    SWMS · 14 job steps

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Also sold on its own
  24. Backhoe Loader

    SOP · 9 sections

    A safe operating procedure for backhoe loaders: hazards, PPE, clearances, operation steps, maintenance and a hazard checklist.

    Also sold on its own
  25. Construction Night Works

    SWMS · 4 job steps

    SWMS for general construction work at night: planning, work area set-up, night works and emergency response, with lighting, plant and fatigue controls.

    Also sold on its own
  26. Hand Tools

    SOP · 9 sections

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Also sold on its own
  27. Overhead Electric Lines - Working Near

    SWMS · 6 job steps

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    Also sold on its own
  28. Asphalt Patcher

    SOP · 7 sections

    Safe operating procedure for an asphalt patcher: hazards, PPE, training, maintenance, step-by-step operation and a hazard checklist.

    Also sold on its own
  29. Earthmoving Equipment

    SWMS · 23 job steps

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Also sold on its own
  30. Falls from Heavy Vehicles

    SOP · 7 sections

    Safe operating procedure to prevent falls from heavy vehicles: worker training, maintenance, cab access, trailers and a training register.

    Also sold on its own
  31. Nuclear Densometer

    SWMS · 12 job steps

    Nuclear Densometer SWMS: 12 job steps covering storage, transport, radiation exposure, mobile plant, trenches and emergencies.

    Also sold on its own
  32. Outdoor Work

    SOP · 11 sections

    Safe operating procedure for outdoor work: hazards, PPE, hot and cold conditions, poisonous plants, animals, first aid and a training register.

    Also sold on its own
  33. Dogman

    SWMS · 12 job steps

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Also sold on its own
  34. Skid Steer

    SOP · 9 sections

    Safe operating procedure for a skid steer: hazards, PPE, precautions, step-by-step operation, fuelling, maintenance and a hazard checklist.

    Also sold on its own
  35. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 job steps

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    Also sold on its own
  36. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  37. Excavator

    SOP · 9 sections

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    Also sold on its own
  38. Horizontal Directional Boring

    SWMS · 16 job steps

    SWMS for horizontal directional boring: locating underground services, drilling, service strikes, rig maintenance, refuelling and emergencies.

    Also sold on its own
  39. Excavation Near Assets

    SWMS · 13 job steps

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    Also sold on its own
  40. Roller

    SOP · 8 sections

    Safe operating procedure for a roller: hazards, PPE, precautions, transporting, maintenance, step-by-step operation and a hazard checklist.

    Also sold on its own
  41. Plumbing - Water Meter Installation

    SWMS · 16 job steps

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    Also sold on its own
  42. Geofabric Installation

    SWMS · 17 job steps

    Geofabric Installation SWMS: 17 job steps covering delivery, crane placement, rolling out, seaming and securing geomembrane on dams and landfills.

    Also sold on its own
  43. Light Vehicle on Construction

    SWMS · 16 job steps

    Light Vehicle on Construction SWMS: 16 job steps covering travel, loading, fuelling, breakdowns, accidents, mobile plant and emergencies.

    Also sold on its own
  44. Soil Compactor

    SWMS · 19 job steps

    SWMS for soil compactor work: weather, site set-up, overhead lines, slopes, silica dust, refuelling, ground workers and emergency response.

    Also sold on its own
  45. Site Establishment

    SWMS · 11 job steps

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    Also sold on its own
  46. Remote Control Trench Roller

    SWMS · 15 job steps

    SWMS for operating a remote control trench roller: transport, set-up, trench work, mobile plant, hydraulics, environment and emergencies.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Driver Posture & Responsibilities0$89.95 · 1 credit
Soil Testing11$89.95 · 1 credit
Pipeline Disinfecting12$89.95 · 1 credit
Vehicle Mounted Borehole Drilling14$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Handheld Power Tools0$89.95 · 1 credit
Spotter11$89.95 · 1 credit
Bulk Excavations13$89.95 · 1 credit
Trench Excavation15$89.95 · 1 credit
Grader0$89.95 · 1 credit
Plumbing Drainage18$89.95 · 1 credit
Mobile Crane16$89.95 · 1 credit
Front-end Loader0$89.95 · 1 credit
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 credit
Plant Attachment Maintenance0$89.95 · 1 credit
Tipper and Dog16$89.95 · 1 credit
Culvert-Tank Installation12$89.95 · 1 credit
Manual Handling0$89.95 · 1 credit
Confined Space Work10$89.95 · 1 credit
Lasers9$89.95 · 1 credit
Sediment Fencing18$89.95 · 1 credit
Guided Boring Pipe Jacking Works17$89.95 · 1 credit
Silica Dust14$89.95 · 1 credit
Backhoe Loader0$89.95 · 1 credit
Construction Night Works4$89.95 · 1 credit
Hand Tools0$89.95 · 1 credit
Overhead Electric Lines - Working Near6$89.95 · 1 credit
Asphalt Patcher0$89.95 · 1 credit
Earthmoving Equipment23$89.95 · 1 credit
Falls from Heavy Vehicles0$89.95 · 1 credit
Nuclear Densometer12$89.95 · 1 credit
Outdoor Work0$89.95 · 1 credit
Dogman12$89.95 · 1 credit
Skid Steer0$89.95 · 1 credit
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Excavator0$89.95 · 1 credit
Horizontal Directional Boring16$89.95 · 1 credit
Excavation Near Assets13$89.95 · 1 credit
Roller0$89.95 · 1 credit
Plumbing - Water Meter Installation16$89.95 · 1 credit
Geofabric Installation17$89.95 · 1 credit
Light Vehicle on Construction16$89.95 · 1 credit
Soil Compactor19$89.95 · 1 credit
Site Establishment11$89.95 · 1 credit
Remote Control Trench Roller15$89.95 · 1 credit
Bought one by one$4,137.70 · 46 credits
In this pack$2,788.45 · 31 credits You save $1,349.25

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.