Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free
Value pack · 15 templates

Fibreglass Pool Installation

Value pack · PACK-50314

  • 15 templates
  • 15 for the price of 11
  • Arrives in one Library folder

A set of 15 SWMS for fibreglass pool installers: pool covers and rollers, pool heating, earthmoving, fencing, paving and mini loader operation.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 11 template credits instead of 15.

Preview of the Pool Covers - Rollers SWMS

Pool Covers - Rollers

SWMSVersion 3
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
—
PC Address
—
PC phone
—
Date SWMS provided to PC
—
Job Site Address
—
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous Lineschemical, fuel or refrigerant lines
  • Energised Electricalenergised electrical installations or services
  • Water & DrowningIn or near water or other liquid that involves the risk of drowning

Planning and preparation

Planning/Preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold Points

Hold points identified and signed off before continuing work. (specify the hold points)

Training/Licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Breathing Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include:

        • Identification of RCS dust through Safety Datasheet (SDS) or labels

        • Dust exposure prevention strategies

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes).

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

13 more job steps, from Check weather conditions & prepare to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 11 instead of 15.

    Compare plans and prices
  • Buy it once

    $989.45 $1,349.25 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Pool Covers - Rollers

    SWMS · 14 job steps

    SWMS for installing pool covers and rollers: silica dust, drilling near services, working at height, mounting covers near water and emergencies.

    Also sold on its own
  2. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  3. Pool Solar Heating

    SWMS · 16 job steps

    Pool Solar Heating SWMS: 16 job steps covering roof access, panel and pump installation, silica dust, tools and emergency response.

    Also sold on its own
  4. Temporary Fencing

    SWMS · 11 job steps

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    Also sold on its own
  5. Paving

    SWMS · 19 job steps

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    Also sold on its own
  6. Fencing

    SWMS · 16 job steps

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    Also sold on its own
  7. Earthmoving Equipment

    SWMS · 23 job steps

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Also sold on its own
  8. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  9. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  10. Mini Loader Operation

    SWMS · 20 job steps

    SWMS for mini loader operation: site set-up, working alone, delivery, lifting, trenching, underground services, attachments, refuelling and emergencies.

    Also sold on its own
  11. Pool Gas Heater-Heat Pump

    SWMS · 17 job steps

    Pool Gas Heater-Heat Pump SWMS: 17 job steps for positioning, installing and testing swimming pool gas heaters and heat pumps.

    Also sold on its own
  12. Tipper and Dog

    SWMS · 16 job steps

    Hazards and controls for operating a tip truck and dog trailer, including side tippers, from coupling trailers to tipping, refuelling and emergency response.

    Also sold on its own
  13. Concrete Slab on Ground

    SWMS · 17 job steps

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    Also sold on its own
  14. Crane Truck Mounted

    SWMS · 16 job steps

    SWMS for truck-mounted cranes such as Hiabs: 16 job steps from training and road operation to pre-lift checks, loading and unloading, and emergency response.

    Also sold on its own
  15. Fibreglass Pool Installation

    SWMS · 17 job steps

    Fibreglass pool installation SWMS: 17 job steps covering excavation, lifting the pool into position, pipework, concrete and emergencies.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Pool Covers - Rollers14$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Pool Solar Heating16$89.95 · 1 credit
Temporary Fencing11$89.95 · 1 credit
Paving19$89.95 · 1 credit
Fencing16$89.95 · 1 credit
Earthmoving Equipment23$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Mini Loader Operation20$89.95 · 1 credit
Pool Gas Heater-Heat Pump17$89.95 · 1 credit
Tipper and Dog16$89.95 · 1 credit
Concrete Slab on Ground17$89.95 · 1 credit
Crane Truck Mounted16$89.95 · 1 credit
Fibreglass Pool Installation17$89.95 · 1 credit
Bought one by one$1,349.25 · 15 credits
In this pack$989.45 · 11 credits You save $359.80

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.