Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free
Value pack · 17 templates

Playground Construction

Value pack · PACK-50313

  • 17 templates
  • 17 for the price of 13
  • Arrives in one Library folder

A set of 17 SWMS for playground builders and installers: play equipment installation, soft-fall surfaces, paving, landscape planting, earthmoving and brick and block laying.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 13 template credits instead of 17.

Preview of the Internal External Lock-Up Fix Stage Carpentry SWMS

Internal External Lock-Up Fix Stage Carpentry

SWMSVersion 10
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal Contractor (PC)
[Principal contractor]
PC Address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job Site Address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work

This work activity involves the following “High-Risk Construction Work” (HRCW – identified in the Job Task column):

  • Mobile PlantMobile plant movement
  • Gas MainsPressurised gas distribution mains or piping
  • Hazardous LinesChemical, fuel or refrigerant lines
  • Energised ElectricalEnergised electrical installations or services
  • FallsInvolves a risk of a person falling from 2m or more
  • Telecom TowersIncluding work on telecommunications towers

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

Planning

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training and licences

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers are trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract.

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work commences.

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

(add site-specific notes)

Legislation and codes of practice

None listed.

Personal protective equipment (PPE)

  • Foot Protection
  • Hearing Protection
  • High Visibility
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Sun Protection

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Provide training on the health effects associated with RCS

    • Hazard

      Exposure to respirable crystalline silica (RCS) – dust inhalation

      Before controls3 High
      Controls
      • Training and Information provided to workers on RCS should include the following:

        • Identification of RCS dust through Material/Safety Datasheet (M/SDS) or labels

        • Dust exposure prevention

        • Checking controls are working and using them

        • When and how to use any respiratory protective equipment provided and what to do if something goes wrong (Including worker respirator fit and check processes)

      After controls2 Moderate
      Responsible
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

14 more job steps, from Check weather conditions & prepare to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 13 instead of 17.

    Compare plans and prices
  • Buy it once

    $1,169.35 $1,529.15 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 job steps

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    Also sold on its own
  2. Plumbing Drainage

    SWMS · 18 job steps

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    Also sold on its own
  3. Rough-in Final Fit-out Plumbing

    SWMS · 18 job steps

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    Also sold on its own
  4. Mobile Crane

    SWMS · 16 job steps

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    Also sold on its own
  5. Landscape Planting

    SWMS · 18 job steps

    SWMS for landscape planting on roadsides and public sites: traffic, mobile plant, tools, soil and mulch, slopes, weather and emergencies.

    Also sold on its own
  6. Paving

    SWMS · 19 job steps

    Paving SWMS: 19 job steps covering subgrade preparation, cutting and laying pavers, silica dust, cement, acid washing and emergencies.

    Also sold on its own
  7. Brick and Block Laying

    SWMS · 22 job steps

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    Also sold on its own
  8. Aquatic Play Equipment Installation

    SWMS · 16 job steps

    SWMS for installing aquatic play equipment such as slides, fountains and ground sprays in public areas, from site set-up to emergency response.

    Also sold on its own
  9. Earthmoving Equipment

    SWMS · 23 job steps

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Also sold on its own
  10. Electrical New Installation

    SWMS · 20 job steps

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    Also sold on its own
  11. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  12. Sport-Playground Equipment

    SWMS · 10 job steps

    SWMS for installing sporting and playground equipment such as basketball hoops, goal posts and play structures that need excavation and assembly.

    Also sold on its own
  13. Tiling

    SWMS · 14 job steps

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    Also sold on its own
  14. Shade Sail Installation

    SWMS · 18 job steps

    SWMS for shade sail installation: site set-up, materials delivery, post holes, cutting concrete, setting posts, fixing sails at height, fuelling and emergencies.

    Also sold on its own
  15. Concrete Slab on Ground

    SWMS · 17 job steps

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    Also sold on its own
  16. Soft-fall Surface Removal and Installation

    SWMS · 14 job steps

    SWMS for removing and installing soft-fall surfacing: site set-up, removal, wet pour rubber mixing and laying, refuelling and emergencies.

    Also sold on its own
  17. Roofing Sheeting

    SWMS · 14 job steps

    A Roofing Sheeting SWMS covering the hazards and controls for installing a corrugated iron roof and fixing and dismantling roof edge protection.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 credit
Plumbing Drainage18$89.95 · 1 credit
Rough-in Final Fit-out Plumbing18$89.95 · 1 credit
Mobile Crane16$89.95 · 1 credit
Landscape Planting18$89.95 · 1 credit
Paving19$89.95 · 1 credit
Brick and Block Laying22$89.95 · 1 credit
Aquatic Play Equipment Installation16$89.95 · 1 credit
Earthmoving Equipment23$89.95 · 1 credit
Electrical New Installation20$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Sport-Playground Equipment10$89.95 · 1 credit
Tiling14$89.95 · 1 credit
Shade Sail Installation18$89.95 · 1 credit
Concrete Slab on Ground17$89.95 · 1 credit
Soft-fall Surface Removal and Installation14$89.95 · 1 credit
Roofing Sheeting14$89.95 · 1 credit
Bought one by one$1,529.15 · 17 credits
In this pack$1,169.35 · 13 credits You save $359.80

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.