Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Value pack · 34 templates

Plumbing Combo

Value pack · PACK-50346

  • 34 templates
  • 34 for the price of 24
  • Arrives in one Library folder

A set of 23 SWMS, nine SOPs and two plans for plumbers.

The SWMS cover drainage, rough-in and final fit-out, trench excavation, water jetting, CCTV drain inspection and pumps and valves. The SOPs include Oxy-Acetylene Welding, HDPE Butt Fusion and Extension Ladder. It also includes Falls Emergency Rescue Plan and Confined Space Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 24 template credits instead of 34.

Preview of the Height Access Equipment SWMS

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 more job steps, from Work area set-up to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 24 instead of 34.

    Compare plans and prices
  • Buy it once

    $2,158.80 $3,058.30 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Height Access Equipment

    SWMS · 17 job steps

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    Also sold on its own
  2. Extension Ladder

    SOP · 7 sections

    Extension ladder safe operating procedure: hazards, pre-use inspection, transporting, set-up, use and carrying, with a training register.

    Also sold on its own
  3. Roof Work

    SWMS · 14 job steps

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    Also sold on its own
  4. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  5. Falls Emergency Rescue Plan

    Management plan · 14 sections

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    Also sold on its own
  6. Handheld Power Tools

    SOP · 9 sections

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Also sold on its own
  7. Trench Excavation

    SWMS · 15 job steps

    Trench Excavation SWMS: 15 job steps covering excavating and working in trenches over 1.5 m deep, from planning to emergency response.

    Also sold on its own
  8. Plumbing Drainage

    SWMS · 18 job steps

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    Also sold on its own
  9. CCTV Drain Inspection

    SWMS · 12 job steps

    Covers the hazards and controls for inspecting drains using CCTV technology, with the risks and controls for each job step from weather checks to emergency response.

    Also sold on its own
  10. Rough-in Final Fit-out Plumbing

    SWMS · 18 job steps

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    Also sold on its own
  11. Manual Handling

    SOP · 5 sections

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Also sold on its own
  12. Water Jetting Drains

    SWMS · 16 job steps

    Hazards and controls for clearing blocked sewers and drains with a truck-mounted hydro-jet, from site set-up and pump use to emergency response.

    Also sold on its own
  13. Plumbing Suspended Pipework

    SWMS · 18 job steps

    A SWMS for installing suspended pipework from elevating work platforms, covering 18 job steps with their hazards and controls.

    Also sold on its own
  14. Risers Working In

    SWMS · 12 job steps

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    Also sold on its own
  15. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 job steps

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Also sold on its own
  16. Platform Ladder

    SOP · 7 sections

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    Also sold on its own
  17. Plumbing Pump-Valve Installation

    SWMS · 20 job steps

    A SWMS for removing and installing industrial pumps and valves: lock-out, disconnection, lifting, fitting and pressure testing.

    Also sold on its own
  18. Oxy-Acetylene Welding

    SOP · 9 sections

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    Also sold on its own
  19. Plumbing Temporary Services Connection

    SWMS · 17 job steps

    Plumbing Temporary Services Connection SWMS: 17 job steps for temporary water and sewerage connections on construction sites.

    Also sold on its own
  20. Hand Tools

    SOP · 9 sections

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Also sold on its own
  21. Earthmoving Equipment

    SWMS · 23 job steps

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Also sold on its own
  22. Fire Sprinkler System Installation

    SWMS · 19 job steps

    A SWMS for installing fire sprinkler systems from elevating work platforms: EWP operation, working at height, hot work, silica dust and commissioning.

    Also sold on its own
  23. Cherry Picker

    SOP · 10 sections

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    Also sold on its own
  24. Electric Fusion - Poly Pipe Butt Welding (PPW)

    SWMS · 11 job steps

    Electric fusion poly pipe butt welding SWMS: 11 job steps covering mobile plant, hazardous atmospheres, hot plate and facer use, and emergencies.

    Also sold on its own
  25. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  26. Scissor Lift

    SOP · 10 sections

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    Also sold on its own
  27. Plumbing Gas Fitting

    SWMS · 21 job steps

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    Also sold on its own
  28. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  29. Confined Space Work

    SWMS · 10 job steps

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    Also sold on its own
  30. Plumbing - Water Meter Installation

    SWMS · 16 job steps

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    Also sold on its own
  31. Plumbing Drain Re-lining

    SWMS · 14 job steps

    SWMS for drain re-lining: silica dust, confined spaces, mobile plant, resins and air compressors, with controls for 14 job steps.

    Also sold on its own
  32. Confined Space Emergency Rescue Plan

    Management plan · 11 sections

    A seven-step emergency rescue plan for confined spaces, with site details, assembly points, first aid officers and rescue equipment.

    Also sold on its own
  33. Plumbing Call-out

    SWMS · 20 job steps

    Plumbing call-out SWMS: 20 job steps covering general repairs, hot water systems and boilers, gas, hot work, asbestos and working at height.

    Also sold on its own
  34. HDPE Butt Fusion

    SOP · 8 sections

    Safe operating procedure for HDPE butt fusion welding: hazards, PPE, inspection, step-by-step operation, maintenance and a hazard checklist.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Height Access Equipment17$89.95 · 1 credit
Extension Ladder0$89.95 · 1 credit
Roof Work14$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Falls Emergency Rescue Plan0$89.95 · 1 credit
Handheld Power Tools0$89.95 · 1 credit
Trench Excavation15$89.95 · 1 credit
Plumbing Drainage18$89.95 · 1 credit
CCTV Drain Inspection12$89.95 · 1 credit
Rough-in Final Fit-out Plumbing18$89.95 · 1 credit
Manual Handling0$89.95 · 1 credit
Water Jetting Drains16$89.95 · 1 credit
Plumbing Suspended Pipework18$89.95 · 1 credit
Risers Working In12$89.95 · 1 credit
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 credit
Platform Ladder0$89.95 · 1 credit
Plumbing Pump-Valve Installation20$89.95 · 1 credit
Oxy-Acetylene Welding0$89.95 · 1 credit
Plumbing Temporary Services Connection17$89.95 · 1 credit
Hand Tools0$89.95 · 1 credit
Earthmoving Equipment23$89.95 · 1 credit
Fire Sprinkler System Installation19$89.95 · 1 credit
Cherry Picker0$89.95 · 1 credit
Electric Fusion - Poly Pipe Butt Welding (PPW)11$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Scissor Lift0$89.95 · 1 credit
Plumbing Gas Fitting21$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Confined Space Work10$89.95 · 1 credit
Plumbing - Water Meter Installation16$89.95 · 1 credit
Plumbing Drain Re-lining14$89.95 · 1 credit
Confined Space Emergency Rescue Plan0$89.95 · 1 credit
Plumbing Call-out20$89.95 · 1 credit
HDPE Butt Fusion0$89.95 · 1 credit
Bought one by one$3,058.30 · 34 credits
In this pack$2,158.80 · 24 credits You save $899.50

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.