Structural Steel Construction Combo

Value pack · PACK-50356

  • 25 templates
  • 25 for the price of 19
  • Arrives in one Library folder

A set of 13 SWMS, 11 SOPs and one plan for structural steel erectors and fabricators.

The SWMS cover structural steel construction, mobile and tower cranes, welding, dogging, spotters and core drilling. The SOPs include Dogman, Oxy-Acetylene Welding and Tower Crane. It also includes Falls Emergency Rescue Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 19 template credits instead of 25.

Preview of the Height Access Equipment SWMS

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 more job steps, from Work area set-up to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 19 instead of 25.

    Compare plans and prices
  • Buy it once

    $1,709.05 $2,248.75 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Height Access Equipment

    SWMS · 17 job steps

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    Also sold on its own
  2. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  3. Falls Emergency Rescue Plan

    Management plan · 14 sections

    A pre-planned procedure for rescuing a worker who has fallen and is suspended in a harness, with a pre-planning checklist and a site-specific rescue plan.

    Also sold on its own
  4. Handheld Power Tools

    SOP · 9 sections

    Safe operating procedure for handheld power tools: hazards, precautions, pre-operational inspection, work environment, operation, maintenance and a hazard checklist.

    Also sold on its own
  5. Dogman

    SOP · 8 sections

    Safe operating procedure for dogmen: hazards, PPE, responsibilities, pre-operational inspections, rigging, lifting and landing loads.

    Also sold on its own
  6. Spotter

    SWMS · 11 job steps

    SWMS for spotters and safety observers: traffic and mobile plant, work near overhead and underground assets, scaffolding and EWPs, roll-over and first aid.

    Also sold on its own
  7. Trestle Scaffold

    SOP · 7 sections

    Safe operating procedure for trestle scaffolds: hazards, PPE, training, pre-operational inspection, step-by-step operation and a training register.

    Also sold on its own
  8. Mobile Crane

    SWMS · 16 job steps

    Mobile Crane SWMS: 16 job steps covering power lines, set-up, load equipment checks, lifting, maintenance, refuelling and emergencies.

    Also sold on its own
  9. Manual Handling

    SOP · 5 sections

    Safe operating procedure for manual handling: hazards, precautions, standard and team lifts, and a manual handling risk assessment form.

    Also sold on its own
  10. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 job steps

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Also sold on its own
  11. Platform Ladder

    SOP · 7 sections

    Safe operating procedure for platform ladders: hazards, PPE, pre-operational inspection, transporting, set-up and use, and a training register.

    Also sold on its own
  12. Oxy-Acetylene Welding

    SOP · 9 sections

    Safe operating procedure for oxy-acetylene welding: hazards, PPE, training, pre-operational inspection, step-by-step operation and a register.

    Also sold on its own
  13. Hand Tools

    SOP · 9 sections

    Safe operating procedure for using hand tools: hazards, PPE, inspection, training, work environment, manual handling and storage.

    Also sold on its own
  14. Tower Crane

    SWMS · 13 job steps

    SWMS for tower crane work: planning, work area set-up, climbing the tower, pre-start checks, crane operation, re-fuelling and emergency response.

    Also sold on its own
  15. Earthmoving Equipment

    SWMS · 23 job steps

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Also sold on its own
  16. Tower Crane

    SOP · 9 sections

    Safe operating procedure for a tower crane: hazards, inspection, climbing, operation, rigging, emergencies and a hazard checklist.

    Also sold on its own
  17. Dogman

    SWMS · 12 job steps

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Also sold on its own
  18. Cherry Picker

    SOP · 10 sections

    Safe operating procedure for a cherry picker: hazards, PPE, inspection, function tests, operation, emergency response and a hazard checklist.

    Also sold on its own
  19. Concrete Sawing and Core Drilling

    SWMS · 13 job steps

    SWMS for using a hand-held, electric or petrol/diesel-powered concrete saw and core drill, with silica dust, fuel and electrical controls.

    Also sold on its own
  20. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  21. Scissor Lift

    SOP · 10 sections

    Safe operating procedure for an EWP scissor lift: hazards, PPE, precautions, inspection, operation, maintenance, emergency response and a hazard checklist.

    Also sold on its own
  22. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  23. Structural Steel Construction

    SWMS · 17 job steps

    SWMS for structural steel erection: planning, deliveries, working at height, crane work, steel erection, hot work, completion and emergencies.

    Also sold on its own
  24. Excavator

    SOP · 9 sections

    Safe operating procedure for an excavator: hazards, PPE, licensing, clearances, maintenance, step-by-step operation and a hazard checklist.

    Also sold on its own
  25. Welding

    SWMS · 10 job steps

    Welding SWMS: 10 job steps covering fire and explosion, gas cylinders, fumes, electrical equipment, burns, heat stress, angle grinders and emergencies.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Height Access Equipment17$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Falls Emergency Rescue Plan0$89.95 · 1 credit
Handheld Power Tools0$89.95 · 1 credit
Dogman0$89.95 · 1 credit
Spotter11$89.95 · 1 credit
Trestle Scaffold0$89.95 · 1 credit
Mobile Crane16$89.95 · 1 credit
Manual Handling0$89.95 · 1 credit
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 credit
Platform Ladder0$89.95 · 1 credit
Oxy-Acetylene Welding0$89.95 · 1 credit
Hand Tools0$89.95 · 1 credit
Tower Crane13$89.95 · 1 credit
Earthmoving Equipment23$89.95 · 1 credit
Tower Crane0$89.95 · 1 credit
Dogman12$89.95 · 1 credit
Cherry Picker0$89.95 · 1 credit
Concrete Sawing and Core Drilling13$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Scissor Lift0$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Structural Steel Construction17$89.95 · 1 credit
Excavator0$89.95 · 1 credit
Welding10$89.95 · 1 credit
Bought one by one$2,248.75 · 25 credits
In this pack$1,709.05 · 19 credits You save $539.70

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.