Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Try the editor free
Value pack · 54 templates

Builders Health, Safety, Environment & Quality Combo

Value pack · PACK-50442

  • 54 templates
  • 54 for the price of 28
  • Arrives in one Library folder

A set of 53 SWMS and one plan for builders and building contractors.

The SWMS cover site establishment, carpentry, roofing, scaffolding, plumbing and drainage, glazing and painting. It also includes Construction HSEQ Site Management Plan.

Each document is the same one sold on its own, so you get every update to it. Together they cost 28 template credits instead of 54.

Preview of the Height Access Equipment SWMS

Height Access Equipment

SWMSVersion 11
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with requirements of the Site Management Plan in place for the Construction Project.

High-risk construction work (HRCW)

This work activity involves the following “High-Risk Construction Work” (HRCW - identified in the Job Task column)

  • FallsRisk of a person falling more than two metres. Note: in some jurisdictions this is three metres.
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with Principal Contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • Principal contractor to confirm emergency response procedures are in place.

Hold points

  • Hold points identified and signed off before continuing work. (specify the hold points)

Training/licence

  • All workers to have a General Construction Induction Card

  • Relevant workers have relevant certificates of competency, licenses, and training. Specify on the SWMS Sign-off for each worker.

  • Trained First Aider on site

  • All workers trained in site-specific emergency and evacuation procedures, SWMS, safe work procedures, and safety data sheets.

Worker duties and responsibilities

  • Fit condition for work, i.e., no signs of fatigue, alcohol or drugs

  • Attend all site inductions/briefings

  • Comply with all site requirements, e.g. PPE, Traffic Management Plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor.

Monitor/review

  • All people involved in the task must have this SWMS communicated to them before work commences

  • SWMS to be reviewed and amended if necessary, in consultation with relevant people after any near miss or incident

  • If additional site hazards identified, review this SWMS and amend control measures to suit

  • People, including workers, contractors and sub-contractors, affected by the revisions to this SWMS, must be informed ASAP

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor to monitor works against the controls stated in this SWMS

  • SWMS must be kept on-site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete or for two years if involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually.

Site-specific notes

Legislation and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace) Code of Practice 2015
  • Work Health and Safety (How to Manage Work Health and Safety Risks) Code of Practice 2015
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2015
  • Work Health and Safety (Construction Work) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (First Aid in the Workplace Code of Practice) Approval 2020
  • Work Health and Safety (How to Manage Work Health and Safety Risks Code of Practice) Approval 2025
  • Work Health and Safety (Managing the Work Environment and Facilities) Code of Practice 2025
  • Work Health and Safety (Construction Work Code of Practice) Approval 2025

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • First Aid in the Workplace Code of Practice 2021
  • How to Manage Work Health and Safety Risks Code of Practice 2021
  • Managing the Work Environment and Facilities Code of Practice 2021

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025

Codes of practice

  • First Aid in the workplace code of practice 2020
  • How to manage work health and safety risks code of practice 2019
  • Managing the work environment and facilities code of practice 2019
  • Construction work code of practice 2019

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • First aid in the workplace – Code of practice 2022
  • How to manage work health and safety risks - Code of practice 2026
  • Managing the work environment and facilities - Code of practice 2026
  • Construction work - code of practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • First Aid in the Workplace: Code of practice 2020
  • How to Manage Work Health and Safety Risks: Code of practice 2020
  • Managing the Work Environment and Facilities: Code of practice 2020
  • Construction work Code of Practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • First Aid in the Workplace - Code of practice 2020
  • How to Manage Work Health and Safety Risks - Code of practice 2024
  • Managing the Work Environment and Facilities - Code of practice 2024
  • Construction Work - Code of practice 2024

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • First aid in the workplace - Code of Practice 2022
  • How to manage work health and safety risks – Code of practice 2022
  • Managing the work environment and facilities – Code of practice 2022
  • Construction work – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Head Protection
  • Eye Protection
  • Hand Protection
  • Protective Clothing
  • Sun Protection
  • Safety Harness

Do not wear rings, watches or jewellery that may become entangled. Long and loose hair must be tied back.

Job steps, hazards and controls

  • Work activity

    Arrival on-site & assess onsite conditions

    • Hazard

      Personal injury, property damage &/or environmental incident

      Before controls3 High
      Controls
      • The vehicle should be positioned in a safe location, clear of traffic/vehicles/pedestrians during equipment delivery and materials removal (deploy physical barriers, caution signs as necessary)

      • Do not park illegally

      • Identify and obey all safety-related signage (check site entry requirements)

      • Report to Site Supervisor

      • Ensure site-specific induction undertaken

      • Assess mobile phone reception

      • The worksite is exactly as detailed in Terms of Agreement or contract

      • Complete a JSA specifying the control measures for unanticipated hazards.

      After controls2 Moderate
      Responsible
      • SupervisorCheck the site and conduct JSA where necessary

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

16 more job steps, from Work area set-up to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 28 instead of 54.

    Compare plans and prices
  • Buy it once

    $2,518.60 $4,857.30 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Height Access Equipment

    SWMS · 17 job steps

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    Also sold on its own
  2. Internal External Lock-Up Fix Stage Carpentry

    SWMS · 15 job steps

    Covers internal and external lock-up and fix stage carpentry, with the risks and controls for each job step from site arrival to emergency response.

    Also sold on its own
  3. Painting and Decorating

    SWMS · 15 job steps

    SWMS for painting and decorating work: transport, site set-up, ladders and scaffolds, surface preparation, mixing, spraying and emergencies.

    Also sold on its own
  4. Roof Work

    SWMS · 14 job steps

    SWMS for roof work: hazards and controls for falls from height, asbestos, access by scaffold, ladder or hatch, harness use, tools and emergencies.

    Also sold on its own
  5. Glazing

    SWMS · 15 job steps

    A glazing SWMS covering cutting, drilling, grinding and installing glass balustrades, windows, doors, shower screens and mirrors.

    Also sold on its own
  6. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  7. Retaining Wall

    SWMS · 19 job steps

    SWMS for building retaining walls: post and sleeper, masonry block and rock walls, from design and excavation to completion and emergencies.

    Also sold on its own
  8. Roof Edge Protection

    SWMS · 16 job steps

    SWMS for installing and dismantling roof edge protection using extension ladders, mobile scaffolding and safety harnesses.

    Also sold on its own
  9. Garage Door Installation

    SWMS · 14 job steps

    Garage Door Installation SWMS: 14 job steps covering silica dust, ladders, manual tasks, door opener wiring, tools, chemicals and emergencies.

    Also sold on its own
  10. Insulation - Batts Installation

    SWMS · 12 job steps

    SWMS for installing insulation batts in ceilings and walls: planning, delivery, ceiling space access, electricity, falls, asbestos, heat stress and fire.

    Also sold on its own
  11. Erecting Fixed Scaffold

    SWMS · 14 job steps

    Erecting Fixed Scaffold SWMS: 14 job steps from unloading and erecting to handover, dismantling and emergency response.

    Also sold on its own
  12. Plumbing Drainage

    SWMS · 18 job steps

    Plumbing drainage SWMS for installing pipes, stormwater tanks and polyethylene pipe welding, and for sewage and stormwater drainage on civil works.

    Also sold on its own
  13. Final Building Clean Before Handover to Client

    SWMS · 10 job steps

    SWMS for the final clean of a building before handover: site set-up, mobile plant, trestles and ladders, cleaning chemicals, manual tasks, dust and sharps.

    Also sold on its own
  14. Rough-in Final Fit-out Plumbing

    SWMS · 18 job steps

    Rough-in Final Fit-out Plumbing SWMS: 18 job steps covering pipework, appliances and fixtures, excavation, hot work, silica dust and emergencies.

    Also sold on its own
  15. Timber Floor Laying

    SWMS · 13 job steps

    Timber Floor Laying SWMS: 13 job steps covering delivery, underlay, timber boards, silica and wood dust, nail guns, adhesives and emergencies.

    Also sold on its own
  16. Skip Bin

    SWMS · 11 job steps

    Skip Bin SWMS: eleven job steps for skip bin delivery and pick-up with a truck-mounted skip lifter, from travel and set-up to emergency response.

    Also sold on its own
  17. Concrete Boom or Line Pumping

    SWMS · 15 job steps

    SWMS for truck-mounted concrete boom and line pumping: road travel, pump set-up, the pour, clearing line blockages, line cleaning and emergencies.

    Also sold on its own
  18. Traffic Corridor - Establishing a Safe Work Zone

    SWMS · 8 job steps

    Traffic corridor SWMS: 8 job steps covering the traffic management plan, safe work zone set-up, traffic controllers, pedestrians and zone takeouts.

    Also sold on its own
  19. Construction Labourer

    SWMS · 16 job steps

    Construction Labourer SWMS: 16 job steps for labourers on construction sites, from silica dust and mobile plant to ladders and emergency response.

    Also sold on its own
  20. Temporary Fencing

    SWMS · 11 job steps

    SWMS for temporary fencing: delivery, set-up, installation and removal, traffic and plant, manual tasks, housekeeping, completion and emergencies.

    Also sold on its own
  21. Plasterboard

    SWMS · 16 job steps

    Plasterboard SWMS for fixing and setting sheets to walls and ceilings, with cornice: 16 job steps from silica dust training to cutting, sanding and stilts.

    Also sold on its own
  22. Decking

    SWMS · 19 job steps

    SWMS for building a timber deck: falls from height, mobile plant, post footings, silica dust, wet cement and deck finishes.

    Also sold on its own
  23. Brick and Block Laying

    SWMS · 22 job steps

    SWMS for brick and block laying: silica dust, materials delivery, mortar, cutting and laying, core steel, acid washing, scaffolds and ladders, and emergencies.

    Also sold on its own
  24. Concrete Foundations Excavating - Pouring

    SWMS · 17 job steps

    SWMS for excavating, steel setting and pouring concrete foundations: 17 job steps from site set-up and plant delivery to the pour and emergencies.

    Also sold on its own
  25. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 job steps

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Also sold on its own
  26. Fencing

    SWMS · 16 job steps

    Fencing SWMS: 16 job steps for wire, timber, steel panel, pool and glass panel fences, from planning to post holes, gates and emergencies.

    Also sold on its own
  27. Duct Work Installation

    SWMS · 11 job steps

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    Also sold on its own
  28. Working in Roof Spaces

    SWMS · 8 job steps

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    Also sold on its own
  29. Construction Site Visitor

    SWMS · 7 job steps

    Construction Site Visitor SWMS: 7 job steps covering weather, site arrival, manual tasks, navigating the site and emergencies.

    Also sold on its own
  30. Overhead Electric Lines - Working Near

    SWMS · 6 job steps

    Overhead Electric Lines SWMS: 6 job steps covering exclusion zones, spotters, mobile plant near powerlines and emergency response.

    Also sold on its own
  31. Earthmoving Equipment

    SWMS · 23 job steps

    Earthmoving Equipment SWMS: 23 job steps covering machine operation, silica dust, slopes, trenching, power lines, fuelling and emergencies.

    Also sold on its own
  32. Timber Floor Sanding and Finishing

    SWMS · 14 job steps

    SWMS for sanding indoor timber floors and applying varnish or similar coatings: set-up, tools, dust, chemicals, refuelling and emergencies.

    Also sold on its own
  33. Cladding

    SWMS · 12 job steps

    SWMS for installing cladding or siding, such as Hardie plank, on the outside of structures: delivery, access, silica dust, tools and emergencies.

    Also sold on its own
  34. Cabinet Installation

    SWMS · 12 job steps

    SWMS for cabinet making and installation: client consultation, site set-up, tools, hazardous substances, dust control, ladders, cuts and emergencies.

    Also sold on its own
  35. Air Conditioning Installation

    SWMS · 16 job steps

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    Also sold on its own
  36. Construction HSEQ Site Management Plan

    Management plan · 41 sections

    A construction site management plan covering health and safety, environment and quality, with registers, checklists and forms.

    Also sold on its own
  37. Dogman

    SWMS · 12 job steps

    A Dogman SWMS covering the hazards and controls for dogging work, from site checks and rigging to signalling, lifting and landing the load.

    Also sold on its own
  38. Rendering

    SWMS · 14 job steps

    SWMS for rendering: silica dust, weather, work area set-up, ladders and scaffolds, surface preparation, render mixing, fuelling and emergency response.

    Also sold on its own
  39. Electrical New Installation

    SWMS · 20 job steps

    SWMS for new electrical installations: planning, site set-up, tools, ladders, live work, excavation, switchboards, testing and emergencies.

    Also sold on its own
  40. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  41. Plumbing Gas Fitting

    SWMS · 21 job steps

    Plumbing Gas Fitting SWMS: 21 job steps for gas fitting work, from planning and excavation to pipework, purging and pressure testing.

    Also sold on its own
  42. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  43. Carpet Laying

    SWMS · 14 job steps

    A Carpet Laying SWMS covering the hazards and controls for installing carpets and carpet tiles, from floor preparation to laying, trimming and seaming.

    Also sold on its own
  44. Tiling

    SWMS · 14 job steps

    Tiling SWMS: 14 job steps covering silica dust, weather, delivery, ladders and scaffold, tile cutting, completion and emergencies.

    Also sold on its own
  45. Awnings Blinds Curtains Installation

    SWMS · 14 job steps

    SWMS for installing awnings, blinds and curtains: site set-up, tools, working at height on ladders and trestles, drilling brackets, mounting and emergencies.

    Also sold on its own
  46. Excavation Near Assets

    SWMS · 13 job steps

    SWMS for excavating near underground services and assets: site planning, survey, work area set-up, contact with utilities and emergency response.

    Also sold on its own
  47. Plumbing - Water Meter Installation

    SWMS · 16 job steps

    Plumbing SWMS for installing water meters: 16 job steps from site assessment and electrical hazards to excavation, confined space and emergency response.

    Also sold on its own
  48. Concrete Slab on Ground

    SWMS · 17 job steps

    Safe work method statement for concrete slab on ground work, covering formwork, fill and steel reinforcement placement, with the hazards and controls for each job step.

    Also sold on its own
  49. Waterproofing

    SWMS · 12 job steps

    SWMS for waterproofing internal wet areas, balconies and rooftops: site set-up, tools, working at height, membranes and torch-on work.

    Also sold on its own
  50. Floating Floor Laying

    SWMS · 14 job steps

    Covers safe floating floor installation, with the risks and controls for each job step from site arrival to emergency response.

    Also sold on its own
  51. Aluminium Window Door Frame Installation

    SWMS · 15 job steps

    Aluminium window and door frame installation SWMS: 15 job steps from silica training and site set-up to scaffolds, cutting, fixing frames and emergencies.

    Also sold on its own
  52. Framing and Trusses - Timber-Steel

    SWMS · 15 job steps

    SWMS for erecting timber and steel framing and trusses: delivery, working at height, standing frames, craning and bracing trusses, and emergency response.

    Also sold on its own
  53. Site Establishment

    SWMS · 11 job steps

    Site Establishment SWMS: 11 job steps from planning and traffic management to tools, site set-up, working at height and emergency response.

    Also sold on its own
  54. Port-a-loo Service

    SWMS · 8 job steps

    Covers servicing a port-a-loo: cleaning, pump-out of the sewage tank and adding deodorising chemicals, with the hazards and controls for each job step.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Height Access Equipment17$89.95 · 1 credit
Internal External Lock-Up Fix Stage Carpentry15$89.95 · 1 credit
Painting and Decorating15$89.95 · 1 credit
Roof Work14$89.95 · 1 credit
Glazing15$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Retaining Wall19$89.95 · 1 credit
Roof Edge Protection16$89.95 · 1 credit
Garage Door Installation14$89.95 · 1 credit
Insulation - Batts Installation12$89.95 · 1 credit
Erecting Fixed Scaffold14$89.95 · 1 credit
Plumbing Drainage18$89.95 · 1 credit
Final Building Clean Before Handover to Client10$89.95 · 1 credit
Rough-in Final Fit-out Plumbing18$89.95 · 1 credit
Timber Floor Laying13$89.95 · 1 credit
Skip Bin11$89.95 · 1 credit
Concrete Boom or Line Pumping15$89.95 · 1 credit
Traffic Corridor - Establishing a Safe Work Zone8$89.95 · 1 credit
Construction Labourer16$89.95 · 1 credit
Temporary Fencing11$89.95 · 1 credit
Plasterboard16$89.95 · 1 credit
Decking19$89.95 · 1 credit
Brick and Block Laying22$89.95 · 1 credit
Concrete Foundations Excavating - Pouring17$89.95 · 1 credit
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 credit
Fencing16$89.95 · 1 credit
Duct Work Installation11$89.95 · 1 credit
Working in Roof Spaces8$89.95 · 1 credit
Construction Site Visitor7$89.95 · 1 credit
Overhead Electric Lines - Working Near6$89.95 · 1 credit
Earthmoving Equipment23$89.95 · 1 credit
Timber Floor Sanding and Finishing14$89.95 · 1 credit
Cladding12$89.95 · 1 credit
Cabinet Installation12$89.95 · 1 credit
Air Conditioning Installation16$89.95 · 1 credit
Construction HSEQ Site Management Plan0$89.95 · 1 credit
Dogman12$89.95 · 1 credit
Rendering14$89.95 · 1 credit
Electrical New Installation20$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Plumbing Gas Fitting21$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Carpet Laying14$89.95 · 1 credit
Tiling14$89.95 · 1 credit
Awnings Blinds Curtains Installation14$89.95 · 1 credit
Excavation Near Assets13$89.95 · 1 credit
Plumbing - Water Meter Installation16$89.95 · 1 credit
Concrete Slab on Ground17$89.95 · 1 credit
Waterproofing12$89.95 · 1 credit
Floating Floor Laying14$89.95 · 1 credit
Aluminium Window Door Frame Installation15$89.95 · 1 credit
Framing and Trusses - Timber-Steel15$89.95 · 1 credit
Site Establishment11$89.95 · 1 credit
Port-a-loo Service8$89.95 · 1 credit
Bought one by one$4,857.30 · 54 credits
In this pack$2,518.60 · 28 credits You save $2,338.70

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.