Early access offer:Early access: 30% off, for as long as you stay subscribed.

Claim offer
Value pack · 24 templates

HVAC-Refrigeration

Value pack · PACK-50321

  • 24 templates
  • 24 for the price of 13
  • Arrives in one Library folder

A set of 24 SWMS for HVAC and refrigeration contractors: duct work, air conditioning installation and repairs, refrigerant gas, cool rooms, welding and confined spaces.

Each SWMS is the same one sold on its own, so you get every update to it. Together they cost 13 template credits instead of 24.

Preview of the Silica Dust SWMS

Silica Dust

SWMSVersion 8
Company doing the work
[Company]
Business contact and phone
—
Responsible person (for monitoring SWMS and work)
—
Responsible person's phone
—
Responsible person's signature
—
Date signed
—
Principal contractor (PC)
[Principal contractor]
PC address
—
PC phone
[PC phone]
Date SWMS provided to PC
—
Job site address
[Site address]
Part of a construction project
—

Site management plan

If the work is part of a construction project, this SWMS must align with the requirements of the site management plan in place for the project.

High-risk construction work (HRCW)

This work involves the following high-risk construction work (HRCW), identified in the job steps:

  • Hazardous AtmosphereWork in an area that may have a contaminated or flammable atmosphere
  • Mobile PlantWork in an area where there is any movement of powered mobile plant

Working with a risk of a fall over 2 metres

The fall from height hierarchy of control level considered when establishing controls:

  • L1Work on the ground or solid construction, not chosen
  • L2Use a passive fall restraint system, e.g. guard rails, scaffolding, EWP, not chosen
  • L3Use a work positioning system, e.g. travel restraint, rope access, not chosen
  • L4Use a fall arrest system, e.g. safety harness, catch platforms, not chosen
  • L5Implement administrative controls, e.g. signage or instruction, not chosen

No level has been chosen yet.

Planning and preparation

  • Liaise with the principal contractor to identify on-site safety systems and procedures

  • Establish supervisory and communication arrangements

  • The principal contractor confirms that emergency response procedures are in place

Hold points

  • Hold points identified and signed off before continuing work: (specify the hold points)

Training and licences

  • All workers have a general construction induction card (White Card)

  • Relevant workers have relevant certificates of competency, licences and training. Specify them for each worker on the SWMS sign-off.

  • A trained first aider is on site

  • All workers are trained in site-specific emergency and evacuation procedures, this SWMS, safe work procedures and safety data sheets

Worker duties and responsibilities

  • Be in a fit condition for work, i.e. no signs of fatigue, alcohol or drugs

  • Attend all site inductions and briefings

  • Comply with all site requirements, e.g. PPE, traffic management plans (TMP)

  • Only carry out work related to the contract

  • Inspect completed work and report possible safety, environmental and quality matters to the supervisor

Monitoring and review

  • All people involved in the task must have this SWMS communicated to them before work starts

  • Review this SWMS and amend it if necessary, in consultation with relevant people, after any near miss or incident

  • If additional site hazards are identified, review this SWMS and amend the control measures to suit

  • People affected by revisions to this SWMS, including workers, contractors and subcontractors, must be informed as soon as possible

  • Give the principal contractor a copy of the revised SWMS

  • The site supervisor monitors the work against the controls in this SWMS

  • This SWMS must be kept on site and made available for inspection or review

  • Keep a record of this SWMS until the job is complete, or for two years if it was involved in a notifiable incident

  • Regardless of any other factor, the person in control of the workplace must review this SWMS at least annually

Site-specific notes

(add any notes specific to this site)

Acts, regulations and codes of practice

Australian Government

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulations 2011.

Codes of practice

  • Work Health and Safety (Managing Risks of Hazardous Chemicals in the Workplace) Code of Practice 2015

Australian Capital Territory

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Work Health and Safety (Managing Risks of Hazardous Chemicals in the Workplace Code of Practice) Approval 2022
  • Work Health and Safety (Managing the Risks of Airborne Crystalline Silica (Silica Dust) in the Workplace Code of Practice) 2024

Queensland

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2011

Codes of practice

  • Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
  • Managing respirable crystalline silica dust exposure in construction and manufacturing of construction elements Code of Practice 2022

New South Wales

Acts and regulations

  • Work Health and Safety Act 2011
  • Work Health and Safety Regulation 2025
  • Work Health and Safety Amendment (Silica Worker Register) Regulation 2025
  • Work Health and Safety Amendment (Crystalline Silica Substances) Regulation 2024

Codes of practice

  • Managing risks of hazardous chemicals in the workplace code of practice 2022
  • Managing risks of respirable crystalline silica in the workplace Code of Practice 2026

Northern Territory

Acts and regulations

  • Work Health and Safety (National Uniform Legislation) Act 2011
  • Work Health and Safety (National Uniform Legislation) Regulations 2011

Codes of practice

  • Managing risks of hazardous chemicals in the workplace Code of Practice 2020
  • Managing risks of respirable crystalline silica in the workplace Code of Practice 2026

South Australia

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulation 2012

Codes of practice

  • Managing Risks of Hazardous Chemicals in the Workplace: Code of practice 2024

Tasmania

Acts and regulations

  • Work Health and Safety Act 2012
  • Work Health and Safety Regulations 2022

Codes of practice

  • Managing Risks of Hazardous Chemicals in the Workplace - Code of practice 2018

Western Australia

Acts and regulations

  • Work Health and Safety Act 2020
  • Work Health and Safety (General) Regulations 2022

Codes of practice

  • Managing risks of hazardous chemicals in the workplace – Code of practice 2022

Victoria

Acts and regulations

  • Occupational Health and Safety Act 2004
  • Occupational Health and Safety Regulations 2017

Personal protective equipment (PPE)

  • Foot Protection
  • Eye Protection
  • Face Protection
  • Hand ProtectionDisposable gloves
  • Protective ClothingDisposable or washable coveralls
  • Breathing ProtectionHalf-face respirator (P1 or P2, disposable or cartridge), fit-tested

Job steps, hazards and controls

  • Work activity

    Training

    • Hazard

      Exposure to respirable crystalline silica (RCS)

      Before controls4 Acute
      Controls
      • Training and information provided to workers on respirable crystalline silica (RCS) should include the following:

        • Information on RCS through safety data sheet (SDS) or labels

        • Risk management process

        • Work practices, procedures and control measures

        • How to fit, use, maintain and clean personal protective equipment (PPE)

        • Emergency procedures, including any special decontamination procedures or PPE failures

        • First aid and incident reporting procedures

        • The purpose and results of air monitoring, including the types of health tests that may be required

        • Checking controls are working and using them

        • Waste collection and disposal.

        • Explanation of the 30-day trigger: If a worker uses RPE for 30 or more days within a 12-month period for tasks involving RCS, they are required to undergo health monitoring.

      After controls2 Moderate
      Responsible
      • Organisation
      • Supervisor
    • Hazard

      Inexperienced worker

      Before controls3 High
      Controls
      • Supervision provided to inexperienced or new workers, e.g. cutting stone or concrete for the first time or using new machinery.

      After controls2 Moderate
      Responsible
      • Organisation
      • Supervisor

IR before controls · RR after controls1 LLow2 MModerate3 HHigh4 AAcute

Overall risk after controls2 MModeratethe highest rating after controls

13 more job steps, from Worker consultation to Emergency response

Each with its hazards, risk ratings and controls, plus your crew's sign-on.

Preview as

How it reads in a browser

Get this value pack

Sign up free, then choose how you'd like it. Every document goes into your Library, in a folder named for the pack.

  • Included in paid plans

    Use template credits from your plan. This pack costs 13 instead of 24.

    Compare plans and prices
  • Buy it once

    $1,169.35 $2,158.80 paid once, and it's yours to keep. Works on the free plan too.

No card needed to sign up. Early access members get 30% off any plan.

What's included

  1. Silica Dust

    SWMS · 14 job steps

    Silica Dust SWMS: 14 job steps covering RCS dust control, wet cutting, dust extraction, RPE, the 30-day health monitoring trigger and clean-up.

    Also sold on its own
  2. Refrigerant Gas

    SWMS · 9 job steps

    SWMS for the safe use of fluorocarbon refrigerants: licensing, cylinder transport and storage, refrigerant recovery, inspection and emergency response.

    Also sold on its own
  3. Materials Duct Lifter

    SWMS · 6 job steps

    Materials Duct Lifter SWMS: 6 job steps covering site set-up, power line clearances, lifter pre-inspection, operation and emergency response.

    Also sold on its own
  4. EWP, Boom, Cherry Picker and Scissor Lift

    SWMS · 12 job steps

    EWP SWMS for scissor lifts, boom lifts and cherry pickers: 12 job steps, from rescue planning and set-up to working at height, fuelling and recharging.

    Also sold on its own
  5. Duct Work Installation

    SWMS · 11 job steps

    SWMS for installing ductwork for exhaust and air conditioning systems: site set-up, delivery, roof space work, tools, chemicals and emergencies.

    Also sold on its own
  6. Air Conditioning Installation

    SWMS · 16 job steps

    Covers installing, maintaining or repairing air conditioning units, with the risks and controls for each job step from planning to emergency response.

    Also sold on its own
  7. Mobile Plant Working Near-Around

    SWMS · 8 job steps

    SWMS for people working near powered mobile plant on construction sites: traffic management, pedestrian rules, passengers, noise, lasers and emergency response.

    Also sold on its own
  8. Cool Room Construction

    SWMS · 18 job steps

    SWMS for building insulated cool room and freezer panels: set-up, working at height, cutting and lifting panels, mobile plant, completion and emergencies.

    Also sold on its own
  9. Risers Working In

    SWMS · 12 job steps

    Safe work method statement for working in risers, covering 12 job steps from rescue planning and entry assessment to falls, heat stress and emergencies.

    Also sold on its own
  10. Welding

    SWMS · 10 job steps

    Welding SWMS: 10 job steps covering fire and explosion, gas cylinders, fumes, electrical equipment, burns, heat stress, angle grinders and emergencies.

    Also sold on its own
  11. Air Conditioning Service and Repairs

    SWMS · 14 job steps

    SWMS for air conditioning service and repairs: refrigerants, indoor and outdoor unit maintenance, energised electrical work, testing and emergencies.

    Also sold on its own
  12. Confined Space Work

    SWMS · 10 job steps

    A SWMS for confined space work: pre-entry risk assessment, entry permits, standby people, ventilation and gas testing, isolation and emergency retrieval.

    Also sold on its own
  13. Manual Handling

    SWMS · 18 job steps

    Manual Handling SWMS: 18 job steps covering lifting and carrying, team lifts, lifting aids, sustained postures, ergonomics, driving, and people and animal handling.

    Also sold on its own
  14. Asbestos Awareness

    SWMS · 4 job steps

    Asbestos Awareness SWMS: 4 job steps for identifying and reporting asbestos-containing materials and responding to accidental disturbance.

    Also sold on its own
  15. Hazardous Chemicals

    SWMS · 12 job steps

    SWMS for hazardous chemicals work: purchasing, storage, labelling, handling, confined spaces, completion and emergency response.

    Also sold on its own
  16. Working in Roof Spaces

    SWMS · 8 job steps

    SWMS for working in roof spaces, ceiling spaces and subfloors: electrical hazards, ladders, heat stress, vermin, snakes and emergency response.

    Also sold on its own
  17. Working On/Near Telecommunications Towers

    SWMS · 8 job steps

    Working on or near telecommunications towers SWMS: 8 job steps covering tower climbing, falls, RF exposure, completion and emergencies.

    Also sold on its own
  18. Height Access Equipment

    SWMS · 17 job steps

    Height Access Equipment SWMS: 17 job steps covering fixed and mobile scaffolds, trestles, extension, platform and vertical ladders, and safety harnesses.

    Also sold on its own
  19. Mechanical Ventilation System

    SWMS · 15 job steps

    Mechanical Ventilation System SWMS: 15 job steps for installing a commercial kitchen exhaust canopy or hood, from set-up to emergency response.

    Also sold on its own
  20. Concrete Chasing

    SWMS · 13 job steps

    Concrete chasing SWMS with 13 job steps, covering silica dust, working at height, tools, noise, vibration and emergency response.

    Also sold on its own
  21. Powered Non-powered Tools

    SWMS · 12 job steps

    Hazards and controls for hand-held power tools and non-powered tools, from site set-up and pre-start checks to emergency response.

    Also sold on its own
  22. Refrigeration

    SWMS · 18 job steps

    SWMS for refrigeration work: cylinder handling, system evacuation, flushing and charging, working at height, testing and emergency response.

    Also sold on its own
  23. Cool Room Repair

    SWMS · 16 job steps

    A SWMS for repairing cool rooms and freezer rooms from an elevated work platform (EWP): the hazards and controls for each job step.

    Also sold on its own
  24. Pipework Mechanical

    SWMS · 19 job steps

    SWMS for mechanical pipework installation: fire system, condenser water and chilled water pipework, from site set-up to commissioning.

    Also sold on its own

What it covers

Hazards it covers

Legislation and standards it references

Every SWMS comes with our legislation and codes of practice reference list.

What you save

TemplateJob stepsOn its own
Silica Dust14$89.95 · 1 credit
Refrigerant Gas9$89.95 · 1 credit
Materials Duct Lifter6$89.95 · 1 credit
EWP, Boom, Cherry Picker and Scissor Lift12$89.95 · 1 credit
Duct Work Installation11$89.95 · 1 credit
Air Conditioning Installation16$89.95 · 1 credit
Mobile Plant Working Near-Around8$89.95 · 1 credit
Cool Room Construction18$89.95 · 1 credit
Risers Working In12$89.95 · 1 credit
Welding10$89.95 · 1 credit
Air Conditioning Service and Repairs14$89.95 · 1 credit
Confined Space Work10$89.95 · 1 credit
Manual Handling18$89.95 · 1 credit
Asbestos Awareness4$89.95 · 1 credit
Hazardous Chemicals12$89.95 · 1 credit
Working in Roof Spaces8$89.95 · 1 credit
Working On/Near Telecommunications Towers8$89.95 · 1 credit
Height Access Equipment17$89.95 · 1 credit
Mechanical Ventilation System15$89.95 · 1 credit
Concrete Chasing13$89.95 · 1 credit
Powered Non-powered Tools12$89.95 · 1 credit
Refrigeration18$89.95 · 1 credit
Cool Room Repair16$89.95 · 1 credit
Pipework Mechanical19$89.95 · 1 credit
Bought one by one$2,158.80 · 24 credits
In this pack$1,169.35 · 13 credits You save $989.45

Reviews

No reviews yet.

How templates work

Try it before you pay.

  1. Preview free

    Every template's job steps, hazards and first task are open to read. No sign-up.

  2. Try the editor

    Tailor a demo SWMS with your company, job and site, on a computer or your phone.

  3. Sign up free

    Your details and logo carry over. This template opens already filled in.

  4. Use a credit or buy once

    Paid plans include template credits every month. Or buy this one to keep.